Chairman’s Letter
04
Message From The Chair
5
Principal Activities and Review of Operations
06
Review of Operations
6
Directors' Report
18
Directors' Report
26
Audit Independence Declaration
27
Auditor’s Independence Declaration
36
Corporate Governance Statement
28
Consolidated Statement of
Comprehensive Income
37
Consolidated Statement of Profit or Loss
and
Other Comprehensive Income
Consolidated Statement of Financial Position
38
Consolidated Statement of Financial Position
31
Consolidated Statement of Changes in Equity
Consolidated Statement of Changes in Equity
Consolidated Statement of Cash Flows
Consolidated
Statement of Cash Flows
Notes to the Consolidated
Financial Statements
Notes to the Consolidated Financial Statements
Consolidated Entity Disclosure Statement
Directors' Declaration
Directors' Declaration
Independent Auditor’s Report
Independent Auditor’s Report
ASX Additional Information
ASX Additional Information
Corporate Directory
Corporate Directory
30
39
32
40
33
41
34
67
64
68
65
69
105
74
107
77
2024 ANNUAL REPORT | 3
HIGHLIGHTS
Butcherbird Expansion Feasibility Study targeting 1.1 million
tonnes per annum (Mtpa) manganese production
demonstrated robust economics.
Butcherbird: Pre-tax Net Present Value (NPV) of A$228 million
(8% discount), Internal Rate of Return (IRR) of 113% and
Annual cashflow of A$57.3M.
Acceleration of activities for Butcherbird expansion, focusing
on process optimisation, Front-End Engineering and Design
(FEED) activities, project finance and permitting.
Resource infill drilling of 216 percussion drill holes for 6,203m
completed at Butcherbird, targeting Mineral Resource
re-estimation and subsequent Ore Reserve update.
Northern Australia Infrastructure Facility (NAIF) proceeded to
detailed due diligence after completing a strategic assessment
of Butcherbird Stage 2 Expansion Project.
Element 25 progressed plans for its proposed High Purity Manganese
Sulphate Monohydrate (HPMSM) facility in Louisiana, USA in
partnership with General Motors (GM) and Stellantis N.V. (Stellantis)
under binding financing and offtake agreements.
Binding term sheet signed with Veolia North America (Veolia)
to secure a site for Element 25's planned HPMSM refinery in
Louisiana, USA. Title V Air Permit received for HPMSM refinery
at the Veolia Burnside site.
Selected for award negotiations for a US$166m grant from the
US Department of Energy (DoE) under their Battery Minerals
Processing and Battery Manufacturing Program which will fund
the construction of the planned HPMSM facility.
Approval of US$57 million of tax incentives under Louisiana
State’s Industrial Tax Exemption Program (ITEP).
Two international HPMSM patents lodged under the Patent
Co-Operation Treaty to provide protection for key manganese
processing steps in Element 25's flowsheet.
Share Purchase Plan (SPP) completed, raising $643,145 to support
Butcherbird Stage 2 Expansion and Louisiana HPMSM project.
4 | 2024 ANNUAL REPORT
MESSAGE FROM
THE CHAIR
Dear Fellow Shareholders
I am pleased to present Element 25 Limited’s 2024 Annual
Report, my first as Chair since my appointment in late 2023.
This year has been marked by significant progress, and I want
to highlight some key achievements in our journey to build a
global manganese business.
Our Butcherbird Manganese Mine in Western Australia, home
to Australia’s largest onshore manganese resource, remains
the cornerstone of our operations. This year, we completed
a Feasibility Study (FS) to expand manganese concentrate
production to 1.1 million tonnes annually. The FS results were
compelling, with an NPV of A$228 million (pre-tax, real) and an
IRR of 113%, alongside a rapid payback period of just 1.2 years.
Expanding production at Butcherbird would establish
Element 25 as a low-cost producer, capable of operating during
the lowest price points in the market cycles. This expansion
also aligns with our plans to produce high-purity manganese
sulphate monohydrate (HPMSM) at a proposed facility in
Louisiana, USA, in partnership with General Motors LLC (GM)
and Stellantis NV (Stellantis) and potentially in Japan in the
future, in partnership with Nissan Chemical Corporation.
In the past six months, we advanced our expansion plans,
including process optimisation, Front-End Engineering and
Design (FEED), project finance, and permitting. In early 2024,
we suspended production at Butcherbird to focus resources on
the expansion. However, due to shifting market dynamics and
disruptions in Africa, we began exploring the possibility of
resuming operations to sell lower-grade stockpiles. This
parallel opportunity is under review as we continue our
expansion efforts.
Additionally, our Butcherbird Expansion Project has
successfully passed a strategic assessment by the Northern
Australia Infrastructure Fund (NAIF), and is now in the due
diligence phase. Given NAIF’s history of investing in significant
minerals projects, we are closely monitoring progress and will
keep shareholders informed.
On the HPMSM front, we agreed terms for a preferred
processing facility site in Louisiana. We have been selected for
award negotiations by the US Department of Energy (DoE) for a
US$166 million grant from the from the US Department of
Energy under their Battery Minerals Processing and Battery
Manufacturing Program which will contribute to funding the
construction of the planned HPMSM facility. A Title V Air Permit
has since been granted, and we are finalising agreements for a
land sale and essential utilities.
Our agreements with GM and Stellantis, combining offtake and
funding, remain active, providing an additional US$115 million
of construction capital. We will progress the DoE grant
negotiations and continue to work with our advisor, Jett
Capital, on private-sector funding options to secure the
remaining funds for construction and commissioning, with
multiple financing proposals under review.
We also made strides in exploring our Lake Johnson lithium
project in Western Australia, identifying several high-priority
targets. While an application for forfeiture has been lodged
against tenement E63/2027, we are defending it vigorously.
I would like to acknowledge my predecessor, Seamus
Cornelius, who resigned as Chairman before last year’s AGM. I
sincerely thank Seamus for his leadership, leaving a strong
legacy. I also extend my gratitude to our Directors and
Management team for their dedication over the past year. We
look forward to continuing our work towards creating
shareholder value.
The Board is excited about Element 25’s future as we strive to
build a global manganese business, supplying in-demand, lowcarbon sustainable manganese ore and battery-grade HPMSM
worldwide. On behalf of the Board, we thank our shareholders
for their ongoing support.
John Ribbons
Non-Executive Chair
Element 25 Limited
2024 ANNUAL REPORT | 5
REVIEW OF OPERATIONS
KEY OPERATIONAL MILESTONES FOR FINANCIAL YEAR 2024
BUTCHERBIRD MANGANESE MINE, WA
HPMSM REFINERY, LOUISIANA, USA
•
Butcherbird Expansion Feasibility Study targeting 1.1 million
tonnes per annum (Mtpa) manganese production, pre-tax Net
Present Value of A$228 million (8% discount) with an Internal
Rate of Return of 113% and annual cashflow of A$57.3M.7
•
Binding term sheet (TS) with Veolia North America (Veolia)
to secure a site for Element 25's planned HPMSM refinery in
Louisiana, USA.
•
•
Acceleration of activities for the planned expansion of
Butcherbird, focusing on process optimisation, Front-End
Engineering and Design (FEED) activities, project finance and
permitting.
Title V Air Permit received for HPMSM refinery at the Veolia
Burnside site.
•
Approval of US$57 million of tax incentives under Louisiana
State’s Industrial Tax Exemption Program (ITEP).
•
Two key international patents lodged under the Patent
Co-Operation Treaty, expected to be processed in 20242.
•
Selected for award negotiations by the US Department of
Energy under their Battery Minerals Processing and Battery
Manufacturing Program for a US$166M to fund construction of
the planned refinery3.
•
Northern Australia Infrastructure Facility (NAIF) completed
a strategic assessment of Butcherbird Stage 2 Expansion
Project.
•
Investigations commenced into potential restart of operations
at Butcherbird to take advantage of the recent movement in
manganese ore prices caused by market factors, including
disruptions at South 32 Limited’s Groote Eylandt (GEMCO)
operations.
•
Resource infill drilling completed at Butcherbird, with 216
percussion drill holes completed for a total of 6,203m,
targeting infill of existing inferred resources1.
•
Resource upgrade commenced to evaluate the conversion of
inferred resources to measured and indicated to support an
upgraded reserve estimate.
1.
E25 ASX Announcement dated 19 June 2024
2.
3.
E25 ASX Announcement dated 27 November 2023
E25 ASX Announcement dated 24 September 2024
6 | 2024 ANNUAL REPORT
BUTCHERBIRD FEASIBILITY STUDY SUMMARY
Capital Cost
NPV
IRR
Cashflow
Payback
AU$49.8
AU$228M
113%
AU$57.3M
1.2
(incl. contingency)
(pre-tax, real)
(annual)
(years)
COMPANY OVERVIEW
Element 25 Limited (E25, Element 25 or Company) (ASX: E25 |
OTCQX: ELMTF) is the operator of the Butcherbird Manganese
Project (Butcherbird or the Project) which hosts Australia’s largest
onshore manganese (Mn) resource with current JORC resources
of over 260Mt of manganese ore 4. Butcherbird is 1,050km north of
Perth and 130km south of Newman in the Pilbara region of Western
Australia (WA).
Element 25's goal is to become an industry leading low-carbon
battery materials manufacturer, producing high quality manganese
concentrate and battery grade High Purity Manganese Sulphate
Monohydrate (HPMSM) products for traditional and new energy
markets.
4.
E25 ASX Announcement dated 17 April 2019
5.
6.
E25 ASX Announcement dated 12 April 2023
E25 ASX Announcement dated 24 September 2024
The Company plans to construct a HPMSM facility (Facility), in
Louisiana, USA, having completed a Feasibility Study (FS)5 for this
project in April 2023 and selected for award negotiations by the US
Department of Energy for a US$166m grant6. The Facility will use
concentrate from Element 25's existing mine at the Butcherbird
Project in Western Australia as feedstock.
The Facility is supported by key offtake and funding agreements in
place with General Motors LLC (GM) and Stellantis N.V. (Stellantis),
which are contributing a combined US$115M in project funding
through equity, pre-payment and senior debt alongside offtake for
~65% of planned HPMSM production from the first production train.
2024 ANNUAL REPORT | 7
BUTCHERBIRD OPERATIONS, WESTERN AUSTRALIA
SAFETY
For the 12 months ending 30 June 2024, the Butcherbird minesite sustained 2 Lost Time Injuries (LTIs) and 0 Medical Treatment Injuries
(MTIs). The 12-month LTI and MTI rates were noted as 28 and 0 respectively.
BUTCHERBIRD EXPANSION STRATEGY
In January 2024, Element 25 released the Butcherbird (BB) Expansion Feasibility Study (FS)7 on the proposed expansion of the
Butcherbird Mine to produce 1.1 million tonnes per annum (Mtpa) of manganese concentrate.
The BB FS demonstrated strong economics with robust economic returns and rapid capital payback.
Highlights included:
•
Expansion to 1.1Mtpa manganese concentrate
production using expanded open-cut mining methods,
a modified primary comminution circuit and a dense
media separation (DMS) back-end solution to optimise
grade and recoveries.
•
Measured, Indicated and Inferred Mineral Resources
used to support the 7.2 years mine life from 2024 to
2031 represents approximately 36.0% of the total
mineral resource inventory within granted mining lease
M52/1074.
•
Expanded operation will establish Butcherbird as a
low-cost Mn operation with a US$2.76/dmtu C1 (direct
production cost) FOB (Free on Board) cost – which will
ensure sustainable profitability at lower manganese
prices compared to the current pilot operation.
•
Average base case annual operating cashflow of
A$57.3M at full production.
•
Payback period of 14 months from start of operations
based on forecast cashflows.
The BB FS utilises all the available Measured and
Indicated resources within the mine plan. The Company
plans to undertake infill drilling in areas containing
inferred resources, outside the current mine plan, within
the next 12 months, targeting an additional 20-25 years
of mine reserves at the proposed production levels.
•
Process plant commissioning is currently estimated to be
achievable within approximately 11 months from a final
investment decision (FID).
•
The base case contemplates annual production and sale
of 1.1Mtpa of manganese ore grading 32% Mn.
•
Expanded concentrate production strategy complements
and enhances Element 25's plan to develop a HPMSM
plant in Louisiana.
•
•
The BB FS indicated a modest capital cost of A$49.8M.
The BB FS results confirm that the economics of the mine are improved under the planned expansion scenario, which benefit from the
inherent economies of scale achieved in the larger-scale production operations. This results in better utilisation of mining and processing
equipment, improved operational efficiencies and better utilisation of the large resource/reserve base underpinning the Project.
The seven-year project utilises 86% of the Measured resources and 61% of the Indicated resources available within the Butcherbird
resource base.
If viable, restarted activities will occur in parallel with and will not impact the expansion plans for the Butcherbird Project. A potential
restart requires several critical steps with respect to operational readiness and an assessment of re-start and production costs, and it is
not guaranteed that this will be commercially feasible.
7.
E25 ASX Announcement dated 23 January 2024
8 | 2024 ANNUAL REPORT
MINING AND PROCESSING
With manganese prices at cyclical lows during the reporting
period, Element 25 restructured production at Butcherbird to
reduce ore production and costs to align with this lower-priced
environment. This helped to preserve cash and allow the team to
focus on Element 25's downstream project. In-pit mining ceased
and production shifted focus to processing stockpiles to minimise
operational costs.
With the release of Element 25's expansion study for Butcherbird,
the Company subsequently suspended Butcherbird’s production
operations in early calendar year 2024 to re-focus resources
and available cash on implementing the mining and processing
expansion plan. Stockpiles were depleted in line with care and
maintenance activities on site, with haulage winding back and
ceasing in early March 2024.
In June 2024, Element 25 commenced investigations into the
potential to recommence operations at Butcherbird to take
advantage of movement in manganese ore prices caused by market
factors, including disruptions at the GEMCO operations, which is
expected to be out of operation until quarter three calendar year
2025. Restarted Element 25 operations may include the sale of
stockpiles and/or recommencing processing of run-of-mine (ROM)
stockpiles at site, which have been mined but not yet processed.
If viable, Element 25 restart activities will occur in parallel with
and will not impact the expansion plans for the Butcherbird
Project. A potential restart requires several critical steps with
respect to operational readiness and an assessment of re-start
and production costs, and it is not guaranteed that this will be
commercially feasible.
LOGISTICS
Element 25 completed a shipment of 50,540mt of manganese
concentrate on 27 January 2024, and ~15,000mt of manganese
concentrate was later transported to Port Hedland.
Plans to cooperate with a small iron ore exporter were reviewed to
optimise the use of trucks and bunker space in Port Hedland. The
use of ultra-quad combinations was also investigated to reduce
overall haulage costs in the future, particularly in relation to the
planned mining expansion.
PLANT DESIGN OPTIMISATION
Element 25 accelerated activities for the expansion of Butcherbird,
focusing on key areas, including process optimisation, FEED
activities, project finance and permitting.
There have been important advancements, particularly in the
FEED phase of the Butcherbird expansion, where the Company
has optimised the plant’s delivery while minimising design, cost,
delivery and processing risks and improving energy efficiency and
emission profiles.
2024 ANNUAL REPORT | 9
ENGINEERING DESIGN AND
PROJECT MANAGEMENT
Element 25 engaged local specialist engineering firm Aspect Engineering
Solutions (Aspect) to manage the engineering design phase and serve
as owner’s engineer throughout project execution. Aspect will assist with
engineering, procurement and construction management activities to
ensure a streamlined and well-managed project implementation plan.
OPERATIONAL IMPROVEMENTS
The project team has made strategic improvements to the initial plant
design, enhancing operational efficiency and maximising productivity.
Integrating a second-stage crushing system will process larger materials
directly into the primary circuit. The feed bin and apron feeder were
upsized to optimise truck cycling times and minimise feed disruptions,
which has the potential to increase plant utilisation and reduce
bottlenecks.
The secondary crushing stage was optimised to handle specific material
sizes, ensuring a seamless process flow and eliminating the need for
additional screening and material re-handling, a key focus of the design
methodology.
Mining equipment sizing optimisation modelling has confirmed
equipment selection to minimise unit mining costs, rehandling and ensure
continuous plant feed availability. Further studies will investigate the
potential to introduce electrified mining equipment and mine site light
vehicles to reduce carbon emissions.
Process controls are being designed to ensure that each principal
processing stage can operate as close to maximum performance as
possible whilst allowing for in-process surge points and redundancy
to allow for scheduled maintenance without interrupting production.
Automation is being implemented at each stage to optimise equipment
set points and performance.
Water consumption reduction through the potential introduction of a
thickener and intelligent recycling will reduce the impact on the local
water resources while reducing bore field operational costs. Inline
analysers will enable dynamic feedback to process control systems based
on desired product specifications and allow for the optimisation
of product blends and sales pricing based on customer requirements.
Element 25 has identified numerous improvements across
various aspects of the plant including:
•
Crushing and screening circuit;
•
Logwashing system;
•
Incorporating a new Dense Media Separation (DMS) circuit;
•
Dust suppression and containment systems; and
•
Incorporating control optimisation and industrial
internet of things (IIoT).
Each of these improvements and their benefits is outlined in detail in
Element 25's June 2024 Quarterly Report8.
10 | 2024 ANNUAL REPORT
8.
E25 ASX Announcement dated 16 July 2024
PROJECT SCHEDULING, PROCUREMENT AND COST MANAGEMENT
The Company is initiating the FEED design stage before the final funding allocation, which allows Element 25 to control initial costs
and avoid timeline delays. This proactive strategy ensures that plant design advances efficiently to 3D modelling, effectively managing
equipment selection risks, ordering long-lead items, layout design, and permitting.
Detailed project scheduling has identified several long-lead procurement requirements, particularly the vendor selection and ordering
of the principal equipment for the crushing circuit. The project team has confirmed mineral sizers as the technology of choice, and a bid
package has been prepared to source crushing equipment from reputable suppliers who can provide ongoing support and maintenance
services. Other long-lead items are being approached similarly to minimise project execution schedules.
INDIGENOUS ENGAGEMENT
As part of the Company’s commitment to ongoing engagement with Traditional Owners, an Indigenous Engagement Plan (IEP) is being
developed to provide a strategy to enhance Indigenous groups’ participation, procurement, and employment in relation to the project.
The IEP will include processes for engaging with local Indigenous groups to assess their capabilities and capacity to participate and ensure
that they have an opportunity to participate in procurement and contracting opportunities as they arise throughout project execution.
Element 25 has agreements in place with Traditional Owners on whose lands the project will operate, but the intention is to expand the
level of Indigenous engagement into other opportunities through construction and operations.
COMMITMENT TO EXCELLENCE AND SUSTAINABILITY
Element 25's commitment to building a state-of-the-art processing plant that sets new standards in performance, reliability, emission
reduction, safety and operational efficiency is unwavering. By leveraging industry-leading expertise and lessons learned from the
Butcherbird pilot plant, the Company targets a high level of operational readiness and smooth project execution and commissioning.
The Stage 2 Butcherbird Expansion Project aims to harness lessons learned from the Stage 1 Pilot Plant to extract the maximum value from
the process-proven resource at the Butcherbird Project, deploying cutting-edge technologies with a view to generating shareholder returns
whilst demonstrating a core focus on safety, sustainability, Indigenous engagement and operational excellence.
The expanded Butcherbird Mine has the potential to supply high-quality, low-carbon, sustainable manganese ore over many years to the
Company’s planned HPMSM refineries to provide a critical raw material for the electrification of energy systems as the world looks to reduce
its dependency on fossil fuels and fight climate change.
“generating
shareholder returns
whilst demonstrating a
core focus on safety,
sustainability, Indigenous
engagement and
operational excellence.”
2024 ANNUAL REPORT | 11
BUTCHERBIRD INFILL DRILLING
In June 2024, Element 25 completed resource infill drilling at Butcherbird, with 207 percussion drill holes for 6,202m targeting infill of
existing inferred resources. All samples were dispatched to Bureau Veritas for assay with results pending.
Current Butcherbird reserves are based around mineral resources within granted mining lease M52/1074, of which less than half has been
drilled to a sufficient density to meet the requirements for Measured and Indicated resource classifications. The balance is classified
as inferred. The additional drilling will provide infill data to better define and potentially convert these areas to Indicated or Measured
categories to support the re-estimation of mine reserves. The increase in the “reserve tail” will support project financing activities with NAIF
and other potential financiers who are currently undertaking project expansion due diligence.
NORTHERN AUSTRALIA INFRASTRUCTURE FACILITY STRATEGIC ASSESSMENT
The Northern Australia Infrastructure Facility (NAIF) successfully completed a strategic assessment of the Butcherbird Stage 2 Expansion
Project during the March 2024 quarter and proceeded to detailed due diligence under the NAIF assessment process.
NAIF is a Commonwealth Government financier providing concessional loans for the development of infrastructure projects in northern
Australia and the Australian Indian Ocean Territories to deliver economic and social growth.
Completion of a strategic assessment by NAIF does not represent a formal decision to offer or commit finance. NAIF has not yet made
any decision to offer finance or made any commitment to provide any financial support to the Project, and there is no certainty that an
agreement will be reached between the parties.
The NAIF assessment process has moved into a detailed project review by an independent technical expert (ITE). Element 25 has appointed
RPM Global to act as the ITE during the review process. The results of this phase will be announced as soon as the process is completed.
12 | 2024 ANNUAL REPORT
HPMSM PROJECT, USA
Element 25 is progressing with plans for construction of an integrated
battery grade high purity manganese sulphate (HPMSM) facility in
Louisiana, USA to produce battery-grade HPMSM, a critical raw material
used in the construction of lithium-ion battery cathode precursor materials
to power the electrification of the global vehicle fleet. The HPMSM produced
in Louisiana will be used in the manufacture of electric vehicle Pre-Cathode
Active Materials (pCAM).
The Facility will utilise concentrate produced from Element 25's existing
operations at the Butcherbird Manganese Mine which exports high silica
manganese concentrate for use in the steel industry. The concentrate
produced at Butcherbird is uniquely suited for conversion to HPMSM
using Element 25’s proprietary process, which has a number of unique
advantages over existing processes used in China.
Element 25's HPMSM Facility is supported by key offtake and funding
agreements with GM and Stellantis, which are contributing a combined
US$115M in project funding through a combination of equity, pre-payment
and senior debt alongside offtake for approximately 65% of the planned
HPMSM production from the first production train.
LOUISIANA SITE SECURED
In May 2024, the Company signed a binding term sheet (TS) with Veolia
North America (Veolia) to secure a site for Element 25's planned high-purity
manganese sulphate monohydrate (HPMSM) refinery in Louisiana, USA.
The TS contemplates several parallel definitive agreements, and completion
is conditional on the execution of these contract documents as well
as securing project financing and the Company’s Board reaching final
investment decision (FID) before 30 October 2024 (or such later date as the
parties may agree).
Definitive agreements in the TS include:
•
Land Purchase Agreement;
•
Sulphuric Acid Supply Agreement;
•
Road Easement Agreement;
•
Utilities and Services Agreement; and
•
Temporary Lease Agreement.
Element 25 has based civil engineering works for the HPMSM project
on the Veolia site. It brings together a number of important synergies to
support the long-term competitiveness of the Element 25 Facility. Under
the Sulphuric Acid Supply Agreement, Veolia will provide long-term secure
sulphuric acid supply and agreed tariffs.
The Veolia site was chosen following a rigorous process which included
numerous surveys, including a cultural survey, a wetland delineation survey
and geotechnical, boundary and topographical surveys, which did not
highlight any issues or concerns.
2024 ANNUAL REPORT | 13
ENGINEERING DEVELOPMENT
Equipment vendors have generated basic engineering packages for specific sections of the plant, with design development of the balance
of the processing facility progressing. The project engineers developed an initial project execution plan, procurement plan and other
foundational elements, which are being reviewed, with controls to manage cost and schedule.
The schedule incorporates all facets of the project, including engineering, permitting, project financing and construction. It provides for
approximately 80 weeks of project build time, based on the current critical path.
PILOT-SCALE METALLURGICAL TEST PROGRAM
Early in the year, Element 25 completed a final pilot-scale process verification test program for its flowsheet at Veolia HPD’s North America
facility, utilising the purified leach solution (PLS) previously produced and processed it through the Veolia pilot scale crystalliser facility
using optimised conditions established in previous tests.
This was successful, producing HPMSM well within the required specifications for battery applications and well inside the Element 25
Standard Specification stipulated in the agreements with both Stellantis and GM. The results exceeded expectations and confirmed the
Element 25 process is able to deliver into existing requirements and offer opportunities to supply higher purity product options into the
future as battery technology develops and higher purities are required.
The program yielded significant quantities of HPMSM which was packaged and dispatched to Element 25's existing offtake partners as well
as potential future offtake and funding partners to assist in discussions.
SUPPLY AGREEMENTS
Apart from negotiating a Sulphuric Acid Supply Agreement with Veolia, Element 25 also commenced discussions with utility, service and
reagent suppliers, covering other essential components for the facility, including natural gas, water and power.
KEY PERMIT SECURED
In May 2024, Element 25 was issued a Title V Air Permit for the construction of its HPMSM refinery via its subsidiary Element 25 (Louisiana)
LLC (E25LA).
As part of the process, Element 25 completed a detailed assessment of expected emissions from the HPMSM refinery and provided this
information along with supporting documentation to the Louisiana Department of Environmental Quality (LDEQ).
The Element 25 HPMSM refinery was defined as a “minor source” for New Source Review9 federal hazardous air pollutant (HAP), Louisiana
toxic air pollutant, or Title V (Part 70) purposes. Any source, including a temporary source, which emits or has the potential to emit any