Butcherbird Expansion Project Accelerates Towards FID
Released
Released
Announcement PDF
ANNOUNCEMENT | 13 MAY 2024 | ASX: E25
E25 OPTIMISES PLANT DESIGN AS BUTCHERBIRD
EXPANSION ACCELERATES TOWARDS FID
In line with its strategic plan, Element 25 Limited (E25 or Company) (ASX: E25; OTCQX: ELMTF) is accelerating activities for the
planned expansion of its Butcherbird Manganese Project in WA (Butcherbird or Project), as outlined in the Feasibility Study
(FS) released in January 20241. Key areas of focus include process optimisation, Front-End Engineering and Design (FEED)
activities, project finance and permitting. The Company is pleased to provide the following update.
The FS published in January 2024 outlined a compelling opportunity to expand production at the Butcherbird Mine to take
advantage of the large resource base and increase commercial returns by increasing production to a nominal 1.1 Mt per
annum of manganese concentrate at lower unit costs. The FS estimates a modest capital cost of $49.8M.
Element 25 Managing Director Justin Brown said: “The Butcherbird Project hosts a world-class manganese deposit with
more than 260Mt in resources, which will underpin the mine as a long-life producing asset2. The decision to progress with
the Stage 2 expansion project comes at a time when manganese ore prices are showing strong gains after a period of
depressed pricing during 20233. The decline in prices came to a halt when the extent of the damage at South 32 Limited
(S32) Groote Eylandt Manganese Mine became clear with S32 recently forecasting a disruption in production until 20254.
Prices in recent weeks have rebounded strongly with current pricing for 44% high-grade material quoted at U$6.93/dmtu cif
Tianjin, approximately 60% higher than the quoted pricing in early April.5”
1
Reference Company ASX release dated 23 January 2023
2
Reference Company ASX release dated 29 September 2023
3
https://investingnews.com/manganese-forecast/
4
https://www.abc.net.au/news/2024-04-22/south32-groote-eylandt-manganese-mine-exports/103752974
5
https://www.fastmarkets.com/
Element 25 Limited
ABN:
46 119 711 929
ASX Ticker:
E25
Level 1, Building B, Garden Office Park,
T:
+61 8 6375 2525
OTCQX Ticker:
ELMTF
355 Scarborough Beach Road,
E:
admin@e25.com.au
Issued Shares:
218M
Osborne Park WA 6017
W:
element25.com.au
Debt:
Nil
INNOVATION AT BUTCHERBIRD
There have been important advancements, particularly in the FEED phase of the Butcherbird expansion, where the Company
has optimised the plant's delivery while minimising design, cost, delivery risk, processing risks and improving energy efficiency
and emission profiles. This update outlines the progress in engineering design and project management, processing plant
enhancements, procurement, project scheduling, environmental initiatives, technological advancements, and the Company’s
commitment to technical excellence, indigenous engagement, as well as social and environmental responsibility and
sustainability.
Engineering Design and Project Management
E25 has engaged local specialist engineering firm ProjX to manage the engineering design phase and serve as owner’s engineer
throughout project execution. ProjX will assist with engineering, procurement and construction management activities to
ensure a streamlined and well-managed project implementation plan.
Operational Improvements
The project team has made strategic improvements to the initial plant design, enhancing operational efficiency and
maximising productivity. Integrating a second-stage crushing system will process larger materials directly into the primary
circuit. The feed bin and apron feeder have been upsized to optimise truck cycling times and minimise feed disruptions, which
has the potential to increase plant utilisation and reduce bottlenecks. The secondary crushing stage has been optimised to
handle specific material sizes, ensuring a seamless process flow and eliminating the need for additional screening and material
re-handling, a key focus of the design methodology.
Mining equipment sizing optimisation modelling has confirmed equipment selection to minimise unit mining costs, rehandling
and ensure continuous plant feed availability. Further studies will investigate the potential to introduce electrified mining
equipment and minesite light vehicles to reduce carbon emissions.
Process controls are being designed to ensure that each principal processing stage can operate as close to maximum
performance as possible whilst allowing for in-process surge points and redundancy to allow for scheduled maintenance
without interrupting production. Automation is being implemented at each stage to optimise equipment set points and
performance.
Water consumption reduction through the potential introduction of a thickener and intelligent recycling will reduce the impact
on the local water resources while reducing bore field operational costs.
Inline analysers will enable dynamic feedback to process control systems based on desired product specifications and allow
for the optimisation of product blends and sales pricing based on customer requirements.
Crushing and Screening Circuit
Through extensive review, E25 has identified significant improvements to the crushing circuit at Butcherbird. These
enhancements are designed to streamline operations, reduce the frequency of plant stoppages, and optimise material
handling efficiencies. Key consideration was given to the clay-rich nature of the ROM feed, and several design modifications
have been made to the flowsheet to eliminate the impact of these materials. Consideration has also been given to minimising
double handling of material, with direct truck dump feed as the principal feed method into a feed hopper.
Element 25 Limited
Figure 1. Crushing circuit process flow diagram
Key Crushing Circuit Upgrades
During post-FS design optimisation, several changes have been made to improve crushing circuit performance and reliability
including:
• Upgraded Apron Feeder: The apron feeder has been expanded from 1.5m to 2m wide, enhancing its capacity to handle
larger particles. This adjustment allows direct feeding into the mineral sizer, reducing the likelihood of bridging and
associated process disruptions.
• Two-Stage Crushing Circuit: Installation of a larger mineral sizer replaces the need for a roller screen. This new sizer is
ideal for processing larger particles, with an increased open area that allows undersise materials to pass through
effortlessly. The sizer can reduce material up to 1m to a nominal size of 180mm. A secondary, smaller mineral sizer will
process oversise feed (>80mm) to ensure product sizing aligns with customer requirements.
• Streamlined Screening Process: After stage 1 crushing, feed material will be screened via a flexible media double-deck
dry screen, where particles over 80mm are redirected to the secondary sizer. The screen removes material smaller than
8mm from the system. This “dry fines” material is used to construct tails storage facility (TSF) walls.
Operational Benefits
The enhancements are expected to minimise the impact of clay-rich laterite ROM feed material, minimise double handling with
the truck-dumping strategy, and maximise plant utilisation and throughput. They aim to minimise potential blockages and to
future-proof the plant against expected expansions, ensuring sustained operational excellence and reduced downtime.
Implementing strategic upgrades allows E25 to continue prioritising efficiency and reliability, demonstrating the Company’s
commitment to innovation and leadership in the manganese industry.
Element 25 Limited
Logwashing System
E25 is improving the processing capabilities of its log washing system by introducing technical enhancements that optimise
material handling and increase water recovery efficiency.
Figure 2. Washing circuit process flow diagram.
Enhanced Logwashing System Features
• Adjustable Washing Angles: The logwasher features variable angles, allowing precise control over the residence time of
materials in the washer, thereby optimising the scrubbing efficiency.
• Upgraded Washing and Screening Equipment: The washing screen has been increased in size, ensuring thorough
rinsing of slimes following log washing. This larger screen facilitates effective particle rollover, enhancing the washing
coverage on all material surfaces scrubbed by the log washer.
• Strategic Screening of Oversized Materials: Material exceeding 8mm is screened out and directed to an oversized trash
and organics screen, which has been expanded to manage additional material from the log washer rinse screen. This
screen is equipped with 1.2mm X 12mm polyurethane panels, optimising the separation of particles down to -1.2mm.
• Improved Slimes Management: The undersized fraction from this screening stage, primarily comprising slimes, is
transferred to the TSF. Incorporating this additional screening step will effectively reduce ~35% of the mass destined for
the TSF, streamlining the pumping process and tailings deposition.
Element 25 Limited
Water Recovery and Operational Efficiency
The system enhancements will also improve the water recovery rate above the initial recovery of 83% at Stage 1 operations,
with further water savings anticipated from reduced material being pumped to the TSF. This optimised process aligns with the
Company’s sustainability goals and enhances the project's overall efficiency.
Dense Media Separation (DMS)
E25 is nearing the final design stages for a new Dense Media Separation (DMS) circuit, which will use results from ongoing test
work with typical feed material.
Recent Testwork Overview
The latest test work involved recombined product
and waste samples from the Stage 1 pilot plant
operations, re-processed through a DMS drum at
a test facility in South Africa at selected cut
densities of 3.0, 2.9, and 2.7 t/m³.
The data resolution was enhanced using 10mm
tracers distributed across 20 density bins ranging
from 2.64 to 4.54 t/m³, with approximately 50
tracers per bin. The test work was performed on a
Figure 3. DMS testwork sample trays showing sinks (dark) and floats (light).
DMS drum identical to the technology selected for E25’s flowsheet, ensuring consistency and relevancy in the results and
operational forecasts.
This work was undertaken on the <40mm sample fraction. The second phase of the work, which is currently being completed,
involves individual particle density measurement and modelling for material >40mm. The outcomes of this test program will
provide essential data to guide the DMS plant design and operating parameters.
Anticipated Outcomes
The visual observations from the test work are encouraging, and the team is awaiting the analytical results and results from the
subsequent tests of the >40mm fraction to further validate the effectiveness of the DMS process under these operational
parameters. These findings will play a crucial role in optimising the final design of the DMS circuit to enhance both the
efficiency and throughput of the processing operations.
Next Steps
Upon receipt of the complete analytical results, E25 will refine the DMS circuit design to ensure maximum operational
efficiency and material handling capacity. The Company aims to implement a system that meets and exceeds its operational
requirements.
Element 25 Limited
Figure 4. Dense media separation circuit process flow diagram.
Dust Suppression Systems
The Company is committed to maintaining a safe and efficient workplace. To that end, significant improvements have been
made with respect to on-site dust suppression and containment systems. The proactive approach involves collaborating with
multiple technology providers to integrate the most suitable solution(s).
Key Features of Dust Suppression System
• Innovative Suppression Technologies: Incorporating atomised and dry fog systems that effectively suppress dust with
minimal water usage. These systems are designed to significantly reduce water consumption while maintaining optimal
dust control.
• Electrostatic Dust Mitigation: Utilising cutting-edge electrostatic technology for dust mitigation further enhances
operational cleanliness and safety.
Operational and Environmental Benefits
Dust suppression technologies are essential to ensure that the Company’s personnel and machinery operate in an
environment where airborne dust hazards are minimised. Implementing these systems supports E25’s commitment to
environmental stewardship and occupational health, ensuring operations exceed industry standards for safety and efficiency.
Control optimisation and IIOT integration
Element 25 plans to integrate an Industrial Internet of Things (IIoT) system into the Butcherbird operations. This strategic
upgrade is designed to enhance data integration and operational control both onsite and remotely from E25’s Perth office,
ensuring high-level oversight and efficiency.
Element 25 Limited
Key Features and Integration Strategy
• Advanced-Data Management and Analysis
The platform will enable enterprise-wide data integration and reporting. Leveraging the Historian software and Vision analytics
platform, the team will have access to efficient data storage and analysis tools that will integrate with existing data sources in
the E25 Perth office.
•
Enhanced Operational Visibility
Utilising simple, intuitive dashboards, graphs, and Key Performance Indicators (KPIs), the platform will allow real-time analysis
and live operational oversight, significantly improving decision-making capabilities.
•
Real-time Analysis of Material and Automated Process Control
Integrating Prompt-Gamma Neutron Activation Analysis
(PGNAA) analysers into the processing plant marks a leap
forward in real-time material stream analysis. This technology
provides in-line, real-time whole rock analysis for key elements,
providing an opportunity for immediate adjustments in process
parameters to align with feed composition. This allows the
process plant control algorithm to optimise mineral recovery
and grade and eliminates the need for manual intervention,
leading to near-complete plant automation and remote
monitoring.
•
Secure and Efficient Operational Control
Figure 5. Inline PGNAA analyser provides real-time analysis.
As a result of the Insights feature, operations will benefit from secure storage and robust analysis of operational data,
facilitating improved strategies and processes across the value chain.
•
Remote Access and Expert Collaboration
The VIP Platform supports remote access to real-time standardised data, enabling the team in Perth to collaborate with global
specialists and OEM suppliers. This promotes a collaborative environment, extending E25’s remote consulting and decisionmaking capabilities.
•
Continuous Improvement and Customisation
The Company’s approach includes a systematic, data-driven methodology that begins with quality data collection and extends
through information analysis, control, and optimisation. This system will support ongoing adaptation and improvement and
be tailored to the specific needs of the operations.
•
Integration Across the Value Chain
The Data Platform connects people and processes and integrates with a wide range of instruments, products, and advanced
process control solutions. This comprehensive integration is essential for optimising every aspect of the operations, enhancing
efficiency, and reducing downtime.
•
Futureproofing Operations
Investing in the VIP Platform ensures E25 has a scalable and adaptable system that can evolve with technological
advancements and operational needs. This forward-thinking approach guarantees the Company’s data management and
process optimisation infrastructure remain at the cutting edge, providing a sustainable competitive advantage.
Element 25 Limited
Through the deployment of the VIP Platform, E25 reinforces its commitment to technological innovation, operational
excellence, and environmental stewardship, setting new standards in the mining industry.
Project Scheduling, Procurement and Cost Management
The Company is initiating the FEED design stage before the final funding allocation, which allows E25 to control initial costs
and avoid timeline delays. This proactive strategy ensures that plant design advances efficiently to 3D modelling, effectively
managing equipment selection risks, ordering long-lead items, layout design, and permitting.
Detailed project scheduling has identified several long-lead procurement requirements, particularly the vendor selection and
ordering of the principal equipment for the crushing circuit. The project team has confirmed mineral sizers as the technology
of choice, and a bid package has been prepared to source crushing equipment from reputable suppliers who can provide
ongoing support and maintenance services. Other long-lead items are being approached similarly to minimise project
execution schedules.
Indigenous Engagement
As part of the Company’s commitment to ongoing engagement with Traditional Owners, an Indigenous Engagement Plan (IEP)
is being developed to provide a strategy to enhance Indigenous groups' participation, procurement, and employment in
relation to the project.
The IEP will include processes for engaging with local Indigenous groups to assess their capabilities and capacity to participate
and ensure that they have an opportunity to participate in procurement and contracting opportunities as they arise
throughout project execution.
Element 25 has agreements in place with Traditional Owners on whose land the project will operate, but the intention is to
expand the level of Indigenous engagement into other opportunities through construction and operations.
Environmental and Operational Innovations
E25 is actively pursuing strategies to reduce water usage and dust emissions. The Company’s innovative approaches
demonstrate commitment to environmental stewardship, such as advanced dewatering screening systems, optimised log
washers for reduced water consumption, and high-pressure mist systems for dust suppression.
Furthermore, the Company have streamlined material handling processes to significantly reduce dust generation, enhancing
operational efficiency and workplace safety.
Reducing double handling is a key focus of the engineering team’s design initiatives. Where this can be achieved, it will reduce
cost and overall energy consumption from diesel-powered mobile plants. Additionally, E25 is exploring the opportunity to
deploy an electric or hybrid mining fleet further to reduce fossil fuel usage during mining operations.
Power generation is likely to be a hybrid diesel-solar system, and discussions have been initiated with potential suppliers to
optimise the energy mix and explore a range of contracting strategies, including engaging with an IPP to minimise upfront
capital.
COMMITMENT TO EXCELLENCE AND SUSTAINABILITY
E25's commitment to building a state-of-the-art processing plant that sets new standards in performance, reliability, emission
reduction, safety and operational efficiency is unwavering. By leveraging industry-leading expertise and lessons learned from
the Butcherbird pilot plant, the Company targets a high level of operational readiness and smooth project execution and
commissioning.
Element 25 Limited
The Stage 2 Butcherbird Expansion Project aims to harness lessons learned from the Stage 1 Pilot Plant to extract the
maximum value from the process-proven resource at the Butcherbird Project, deploying cutting-edge technologies with a view
to generating shareholder returns whilst demonstrating a core focus on safety, sustainability, indigenous engagement and
operational excellence. The expanded Butcherbird Mine has the potential to supply high-quality, low-carbon, sustainable
manganese ore supply over many years to the Company’s planned HPMSM refineries to provide a critical raw material for the
electrification of the world energy systems as the world looks to reduce its dependency on fossil fuels and fight climate change.
ABOUT ELEMENT 25
Element 25 is an ASX-listed company (ASX: E25) that operates the world-class, 100%-owned Butcherbird Manganese Project in
Western Australia. It is currently undertaking activities to expand production to approximately 1.1Mtpa of medium-grade high
silica manganese ore for use in traditional and new energy markets.
E25 is also commercialising innovative proprietary technology to produce battery-grade high-purity manganese sulphate
monohydrate (HPMSM) for use in Electric Vehicle (EV) battery manufacturing. The Company is planning to construct its first
HPMSM refinery in Louisiana, USA, to produce raw materials for the US EV market, in partnership with General Motors LLC (GM)
and Stellantis N.V. (Stellantis). E25 aims to become an industry-leading, world-class, low-carbon battery materials
manufacturer.
Company information, ASX announcements, investor presentations, corporate videos, and other investor material in the
Company’s projects can be viewed at www.element25.com.au.
This announcement is authorised for market release by Element 25 Limited’s Board of Directors.
Justin Brown
Media Inquiries:
Managing Director
Email: admin@e25.com.au
Phone: +61 (8) 6375 2525
Nathan Ryan
Email: nathan.ryan@nwrcommunications.com.au
Phone: +61 (0) 420 582 887
Competent Persons Statement
The company confirms that in the case of Mineral Resources or Ore Reserves estimates, all material assumptions and technical parameters underpinning the
estimates in the market announcement dated 29 September 2023 continue to apply and have not materially changed. The company confirms that the form
and context in which the competent person’s findings are presented have not been materially modified from the original market announcement.
Element 25 Limited
Share your feedback
Discover