Battery Grade Manganese Feasibility Study Delivers Compelling Results
•
Feasibility Study1 (FS) demonstrates compelling economics for the proposed first ever US based battery grade high purity manganese
sulphate monohydrate (HPMSM) facility in the U.S. (Facility).
•
US Electric Vehicle (EV) demand is expected to grow 12x by 2030 (Benchmark Minerals).
•
Industry commitments of over US$90 billion to build U.S. battery capacity to provide batteries for 10M electric vehicles (EVs) each year.
•
HPMSM is required for the production of pre-cathode active materials (pCAM) used in EV batteries.
•
Element 25 Limited (Element 25, E25 or Company) (ASX:E25) Facility is positioned to be the leading US source of HPMSM.
•
Offtake and financing agreements in place with Stellantis N.V. (Stellantis) and General Motors LLC (GM) bringing US$115M in
financing to the project via equity, pre-payment and debt.
•
Industry leading ESG credentials - E25 HPMSM calculated to produce ~1.7kg of CO2 for every 1kg of HPMSM which is approximately ~
67% lower than competitors in China and ~26% lower than closest non-China optimised case.
1
Reference: Company ASX Release dated 12 April 2023
Element 25 Limited
ABN: 46 119 711 929
Level 1, Building B, Garden Office Park,
T: +61 8 6375 2525
355 Scarborough Beach Road,
Osborne Park WA 6017
E: admin@e25.com.au
W: element25.com.au
General Motors and Stellantis Offtake and Project Finance
•
Stellantis N.V. (Stellantis) completes placement of A$21.5M in E25 at A$1 per share to fund ongoing works on the Louisiana Facility.
•
Element 25 and General Motors LLC sign definitive agreement for the supply of battery grade HPMSM for GM’s electric vehicle battery
requirements in their UltiumTM battery plants.
•
E25 to supply GM with manganese sulfate required to scale EV capacity in North America beyond 1 million units annually.
•
E25 plans to build its first manganese sulfate facility in the U.S. which will process manganese from its Butcherbird Manganese Mine
in Western Australia (Butcherbird).
•
GM to provide US$85 million (~A$128 million) loan to E25 to build the proposed Facility.
•
Total funding commitments total US$115M from Stellantis and GM.
Butcherbird Manganese Operations, WA
•
Appointment of Key Senior Operations Personnel to the Butcherbird Team as part of the Production Improvement Plan (PIP).
•
Clint Moxham joins the Team as General Manager Operations (GMO). Clint’s key responsibilities include:
•
o
Statutory and operational oversight of the Butcherbird Manganese Mine.
o
Implementation and oversight of improved operational processes.
o
Continued improvement in plant preventative maintenance targeting improved run times to increase production.
Gideon van Wyk has joined the Team as General Manager (Manganese Ore Business). Gideon’s key responsibilities include:
o
Process optimisation and improvement with the existing operations targeting tonnes, grade and recoveries.
o
Technology selection for optimised expansion plant utilising improved comminution and dense media separation (DMS).
o
Planning and execution of the Butcherbird Expansion Project to increase concentrate production volumes to a targeted 1Mtpa.
Butcherbird Expansion Planning
•
General Manager (Manganese Ore Business) Gideon van Wyk is leading and managing the expansion project.
•
The principle aim is to expand the production of manganese concentrate to a nominal target of 1Mtpa.
•
Gideon has recently returned from South Africa where he made significant progress with equipment suppliers and engineering
consultants to advance the project.
•
Capital cost estimate to install the expanded facility and project schedule based on lead times as advised by key equipment vendors to
be compiled and evaluated.
Corporate
•
In June 2023 that Pricewaterhouse Coopers (PwC) were appointed as the Company’s auditors effective 23 June 2023 and this
appointment will continue until the next annual general meeting of the Company2.
2
Reference: Company ASX Release dated 26 June 2023
Element 25 Limited
2
Butcherbird Operations
Production
Mining and processing operations continued at the
Company’s 100%-owned Butcherbird Manganese
Project (Project) in Western Australia. Following the
installation and commissioning of the auxiliary
feeder, the throughput rates of the plant have
shown sustained improvement, however the
operational bottleneck has now shifted to plant
availability which remains below target levels.
Focus on operating procedures, equipment
inspections, preventative maintenance will
continue in the coming quarter targeting improved
uptime and throughput rates.
The Company remains focussed on continued
improvements to the plant and the resultant
production output including increasing the
production of concentrate beyond Stage 1
nameplate volumes as quickly as possible.
Project expansion plans have taken a significant
leap forward with the addition of new specialist
personnel to the operations team with key skills
relating to operational excellence and technology
selection and implementation (see below).
Senior Management Changes
The has welcomed the appointment of key senior operations personnel to the Butcherbird Operations Team as part of the
ongoing Production Improvement Plan (PIP).
Clint Moxham has joined the team as General Manager Operations (GMO). Clints key responsibilities
include statutory and operational oversight of the safe operation of the Butcherbird Manganese Mine,
implementation and oversight of improved operational processes and continued improvement in plant
preventative maintenance targeting improved run times to increase production.
Clint is a vision driven miner with a track record of delivering greenfield and start-up operations. Clint has a reputation of safe
operations with a career long record of team management and mining operations successes.
Element 25 Limited
3
Experienced mineral processing Gideon van Wyk has also joined the team as General Manager
(Manganese Ore Business). Gideon’s key responsibilities include process optimisation and improvement
with the existing operations targeting tonnes, grade and recoveries. Gideon is also responsible for
technology selection for optimised expansion plant utilising improved comminution and dense media
separation (DMS) as well as the planning and execution of the Butcherbird Expansion Project
(Expansion Project) to increase concentrate production volumes to a targeted 1Mtpa.
Gideon brings over 30 years of experience in the mining industry and has developed a deep understanding of the technical and
commercial aspects of mineral processing including identify and implementing innovative solutions that optimise production
processes, reduce costs, and increase efficiency, ultimately leading to greater profitability.
Production Expansion Plans
The E25 business development and production teams have been actively investigating the optimal processing technologies to
expand production at Butcherbird to improve the profitability of the business by reducing unit costs of production as identified
in the original studies.
The technology selection will be aimed at eliminating any remaining bottlenecks with the front-end dry processing of the clay
rich ROM feed material to ensure optimal throughput of ROM feed. The large volume of processing data collected during the
operation of the Stage 1 plant will be invaluable in guiding this process.
Newly appointed General Manager (Manganese Ore Business) Gideon van Wyk is leading and managing the Expansion Project.
The principle aim is to utilise the past two years of operational data from the existing small-scale Stage 1 processing facility to
inform the correct technology and equipment selection to expand the production of manganese concentrate to a nominal
target of 1Mtpa.
Gideon has recently returned from South Africa where he has made significant progress meeting with equipment suppliers and
engineering consultants to advance the Expansion Project. Key design parameters for the base case include:
-
~4Mt per annum of ore feed.
-
~1Mt per annum of manganese concentrate production.
-
Processing flowsheet summary:
1.
Dry screening to remove clay waste material.
2.
Dry crushing of material >65mm.
3.
Attrition scrubbing of coarse and fine ore using feed using a log washer to remove further clay waste and
further break down barren shales.
4.
Dense media separation (DMS) to separate heavies (manganese) from lights (waste shales).
Element 25 Limited
4
Further optimisation of the mass balance will undertaken during the design process and the key deliverables from this work
will include a capital cost estimate to install the expanded facility as well as a project schedule based on lead times as advised
by key equipment vendors.
Logistics/Shipping
Ocean freight rates continue at levels which are in line with long term forecasts.
•
The MV Pan Poseidon left Port Hedland on 8 April 2023 with 54,000t of Butcherbird manganese concentrate on board.
•
A monthly trucking record of 30kt was also set in March 2023.
Manganese Market and Ore Marketing Strategy
Manganese price have fallen to cyclical lows in recent months. The
Company’s view is that a sharp slowdown in construction activity
in China in part due to unusually hot weather has impacted the
demand for construction steel and related materials, including
manganese. The impact on the demand for steel has had a flow
through effect on manganese ore prices which are at or near
cyclical lows.
Prices are expected to recover as economic activity in the
northern hemisphere normalises however the Company is taking a strategic approach to future shipments and will defer
trucking for the current period to provide optionality with respect to limiting shipments while prices are low.
HPMSM Project Execution
Feasibility Study
During the quarter, Element 25 reported the results of a detailed feasibility study (FS or Study) 3 for its 100% owned proposed
integrated battery grade HPMSM Facility which will produce a monohydrate manganese sulphate with the chemical formula
MnSO4.H2O.
The Study confirmed the feasibility of producing HPMSM at a Louisiana location for sale to local and international offtake
partners with an environmental impact that is significantly lower than incumbent producers to supply the rapidly growing
electric vehicle supply chain in the United States. The proposed project is uniquely positioned to benefit from its highly
favourable location in Louisiana USA, with exceptional infrastructure, a deep local talent pool, low-cost energy, and proximity
to local markets for the repurposing of by-product industrial materials to maximise circular resource use.
3
Reference: Company ASX Release dated 12 April 2023
Element 25 Limited
5
The Study reflects conservative costing assumptions and includes provisions to take into account recent inflationary pressures
having a substantial impact on both capital expenditures and operating costs.
E25 has developed a proprietary flowsheet which is covered by multiple patent applications for the conversion of the
Butcherbird manganese concentrates into HPMSM. The E25 process improves on existing HPMSM processing currently in use
by reducing energy and reagent consumption and producing solid by-products in a form that can be repurposed, maximizing
resource utilisation and minimising local waste and therefore also minimising the environmental impact of the complete
operation.
This project scope comprises a production Facility capable of producing a nominal 65,000 t/year of battery grade HPMSM per
train. The Study assumes a start-up production train with a second train to be constructed in subsequent years to increase
production volumes up to 130,000 tonnes per annum.
The HPMSM plant will also produce re-usable material in the form of a fertiliser feedstock, a ferro-silicon (FeSi) smelter
feedstock suitable for use in steel production processes and a gypsum by-product for industrial use.
Table 1: Feasibility Study summary financial results.
Offtake and Project Finance with General Motors
General Motors
In late June 2023, Element 25 Limited and General Motors Co. (NYSE: GM) announced binding agreements for E25 to supply up
to 32,500 metric tons of manganese sulfate annually, which will support GM’s annual production of more than 1 million EVs in
North America4.
Under the agreements, GM will provide E25 with a US$85 million loan to partially fund the construction of a new facility in
Louisiana, USA, for production of battery-grade manganese sulfate – a key component in lithium-ion battery cathodes –
4
Reference: Company ASX Release dated 26 June 2023
Element 25 Limited
6
starting in 20255. (Facility)At the facility, E25 will produce manganese sulfate by processing manganese concentrate from its
mining operations in Western Australia. It is expected to be the first facility of its kind in the U.S6.
Element 25 expects to invest approximately US$290 million to build the 230,000-square-foot facility. Site preparation is
planned to begin in Q3 CY2023, and the plant is scheduled to open in 2025. The facility is projected to create approoximately
200 permanent jobs when it is fully operational.
GM continues to strengthen its domestic supply base for EV production. In addition to manganese sulfate, GM has announced
direct investments in lithium, nickel and other commodities, as well as cathode active material (CAM). GM and its joint venture
partners are installing 160GWh of battery cell manufacturing capacity in the U.S., and its suppliers are onshoring production of
permanent magnets and other EV components to North America. To date, these initiatives are creating thousands of jobs in
states and provinces including California, Louisiana, Nevada, Texas, Ohio, Michigan, Tennessee, Ontario and Quebec.
Stellantis
On 9 January 2023, E25 announced the signing of a binding agreement with Stellantis N.V. to supply battery-grade HPMSM
from E25’s proposed USA-based processing facility. The agreement combines take or pay offtake commitments for 45Kt of
HPMSM from the facility over five years with US$30M in two tranches of project funding towards the facility capital cost.
Tranche 1 of the funding comprises a US$15M equity investment in E25. The further key commercial terms are outlined in
detail in Appendix A to the announcement in January7.
In order to allow time for certain conditions precedent (CPs) to be satisfied, in May the parties agreed to extend key dates to
provide sufficient time for the process outlined in the agreements to be followed8.
Subsequent to that extension, all required CPs were satisfied and in accordance with the terms of the agreement, in early July
2023 E25 issued 22,569,967 shares to Stellantis at A$1.00 per share for total proceeds of A$22,569,9679. E25 will use proceeds
for planned engineering and construction activities to advance its proposed USA-based HPMSM processing Facility planned for
construction in Louisiana, USA.
Corporate
Completion of Stellantis Placement
During the quarter all required CPs were satisfied and in accordance with the terms of the agreement announced in January
2023 allowing the first tranche of funding comprising US$15M in new equity to be completed.
5
Reference: Company ASX Release dated 12 April 2023.
6
Reference: Company ASX Release dated 30 September 2022.
7
Reference: Company ASX Release dated 9 January 2023
8
Reference: Company ASX Release dated 1 May 2023
9
Reference: Company ASX Release dated 7 July 2023
Element 25 Limited
7
Consequently, in early July 2023 E25 issued 22,569,967 shares to Stellantis at A$1.00 per share for total proceeds of
A$22,569,96710. E25 will use proceeds for planned engineering and construction activities to advance its proposed USA-based
HPMSM processing Facility planned for construction in Louisiana, USA.
Stellantis subsequently lodged an initial Notice of Substantial Holder form with the Australian Stock Exchange confirming their
position as a substantial holder of shares in the Company comprising 10.4% of the E25 issued capital.
Change of Auditor
Pricewaterhouse Coopers (PwC) have been appointed as the Company’s auditors effective 23 June 2023 and this appointment
will continue until the next annual general meeting of the Company11.
The appointment followed the resignation of Rothsay Audit & Assurance Pty Ltd (Rothsay) and the Australian Securities and
Investments Commission’s (ASIC) consent to the resignation in accordancew ith s329(5) of the Corporatations Act 2001.
About Element 25
Element 25 is an ASX listed company (ASX: E25) operating the world class 100%-owned Butcherbird Manganese Project in
Western Australia and developing battery grade high purity manganese sulphate monohydrate (HPMSM) products for
traditional and new energy markets. It aims to become an industry leading, world class, low-carbon battery materials
manufacturer.
Company information, ASX announcements, investor presentations, corporate videos, and other investor material in the
Company’s projects can be viewed at: www.element25.com.au.
Justin Brown
Media Inquiries:
Managing Director
Nathan Ryan
Email: admin@e25.com.au
Email: nathan.ryan@nwrcommunications.com.au
Phone: +61 (8) 6375 2525
Phone: +61 (0) 420 582 887
ASX Additional Information
The ASX Appendix 5B quarterly report covering the three month period ending 30 June 2023 is attached and lodged with this
report.
In accordance with ASX Listing Rule 5.3.5, payments to related parties of the Company and their associates during the quarter
totalled $141,000 comprising salary, directors’ fees, consulting fees and superannuation.
In accordance with ASX Listing Rule 5.3.1, payments relating to Mining Exploration totalled $4,000.
10
Reference: Company ASX Release dated 7 July 2023
11
Reference: Company ASX Release dated 26 June 2023
Element 25 Limited
8
Competent Persons Statement
The company confirms that in the case of estimates of Mineral Resource or Ore Reserves, all material assumptions and technical parameters underpinning the
estimates in the market announcements dated 17 April 2019 and 19 May 2020 continue to apply and have not materially changed. The company confirms that
the form and context in which the competent person’s findings are presented has not been materially modified from the original market announcements.
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Mr Justin Brown who is a
member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results and Exploration Targets were compiled, Mr Brown was
an employee of Element 25 Limited. Mr Brown is a geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Brown consents to the inclusion of this information in the form and context in which
it appears in this report.
This announcement is authorised for market release by Element 25 Limited’s Board of Directors.
Forward Looking Statements
This announcement may include forward-looking statements. These forward-looking statements are based on Element 25’s expectations and beliefs
concerning future events. Such forward-looking statements concern Element 25’s anticipated results and progress of its operations in future periods, planned
exploration and, if warranted, development of its properties and plans related to its business and other matters that may occur in the future. These statements
relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of
management. All statements contained herein that are not clearly historical in nature are forward-looking, and the words “anticipate,” “believe,” “expect,”
“estimate,” “may,” “might,” “will,” “could,” “can,” “shall,” “should,” “would,” “leading,” “objective,” “intend,” “contemplate,” “design,” “predict,” “potential,”
“plan,” “target” and similar expressions are generally intended to identify forward-looking statements.
Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to
differ from those expressed or implied by the forward-looking statements. Forward-looking statements in this release include, but are not limited to,
statements with respect to risks related to:
•
Element 25’s operations being further disrupted and Element 25’s financial results being adversely affected by public health threats, including any
renewed coronavirus pandemic;
•
Element 25’s limited operating history in the HPMSM industry;
•
Completing required permitting, zoning and re-zoning activities required to commence processing operations for Project;
•
Element 25’s ability to achieve and maintain profitability and to develop positive cash flows from Element 25’s mining and processing activities;
•
Investment risk and operational costs associated with Element 25’s exploration activities;
•
Element 25’s ability to enter into and deliver products under supply agreements;
•
The pace of adoption and cost of developing electric transportation and storage technologies dependent upon lithium batteries;
•
Element 25’s ability to access capital and the financial markets;
•
Recruiting, training and developing employees;
•
Compliance with government regulations;
•
Environmental liabilities and reclamation costs;
•
Estimates of and volatility in HPMSM prices or demand for HPMSM;
•
Element 25’s share price and trading volume volatility; and
•
Element 25’s failure to successfully execute Element 25’s growth strategy, including any delays in Element 25’s planned future growth.
All forward-looking statements reflect Element 25’s beliefs and assumptions based on information available at the time the assumption was made. These
forward-looking statements are not based on historical facts but rather on management’s expectations regarding future activities, results of operations,
performance, future capital and other expenditures, including the amount, nature and sources of funding thereof, competitive advantages, business prospects
and opportunities. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific,
known and unknown, that contribute to the possibility that the predictions, forecasts, projections or other forward-looking statements will not occur. Although
Element 25 have attempted to identify important factors that could cause actual results to differ materially from those described in forward-looking
statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Should one or more of these risks or uncertainties
materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those anticipated, believed, estimated, or expected.
Element 25 cautions readers not to place undue reliance on any such forward looking statements, which speak only as of the date made. Except as otherwise
required by the securities laws of Australia, Element 25 disclaims any obligation to subsequently revise any forward-looking statements to reflect events or
circumstances after the date of such statements or to reflect the occurrence of anticipated or unanticipated events. Element 25 qualifies all the forward
looking statements contained in this release by the foregoing cautionary statements.
Element 25 Limited
9
Element 25 Limited
ASX Additional Tenement Information for Quarterly Report to 30 June 2023
Tenement
Location
Interest at
reference
beginning of
quarter
Acquired
/
Dispose
d
Interest at end
of quarter
The mining
tenements held at
the end of the
quarter and their
E20/659
Eelya Hill WA
10%
N/A
10%
E46/1366
Black Hill WA
100%
N/A
100%
E52/1529
Mt Padbury WA
100% (Note 1)
N/A
100% (Note 1)
location
E52/2350
Butcher Bird WA
100%
N/A
100%
E52/3606
Yanneri Bore WA
100%
N/A
100%
E52/3706
Yanneri Pool WA
100%
N/A
100%
E52/3735
Limestone Bore WA
100%
N/A
100%
E52/3769
Kumarina WA
100%
N/A
100%
E52/3779
Beyondie Bluff WA
100%
N/A
100%
E52/3858
Yanneri Well WA
100%
N/A
100%
E52/4022
Corner Bore WA
100%
N/A
100%
E52/4055
Weelarrana WA
100%
N/A
100%
E52/4064
Neds Gap WA
100%
N/A
100%
E52/4149
Neds Gap WA
100%
N/A
100%
E52/4153
Yanneri Well WA
100%
N/A
100%
E52/4155
Weelarrana WA
100%
N/A
100%
L52/211
Limestone Bore WA
100%
N/A
100%
L52/215
Butcherbird East 1 WA
100%
N/A
100%
L52/216
Butcherbird East 2 WA
100%
N/A
100%
L52/217
Butcherbird East 3 WA
100%
N/A
100%
L52/218
Butcherbird East 4 WA
100%
N/A
100%
L52/220
Butcherbird East 5 WA
100%
N/A
100%
L52/221
Butcherbird East 6 WA
100%
N/A
100%
L52/225
Butcherbird East 7 WA
100%
N/A
100%
M52/1074
Yaneri Ridge WA
100%
N/A
100%
E57/1060
Victory Well WA
20%
N/A
20%
E63/2027
Lake Johnston WA
100%
N/A
100%
Notes:
1) 100% interest held in all minerals other than iron ore and manganese.
Element 25 Limited
10
Share your feedback
Discover