ANNOUNCEMENT | 31 JANUARY 2024 | ASX: E25
DECEMBER 2023 QUARTERLY REPORT
QUARTERLY HIGHLIGHTS
Butcherbird Manganese Operations, Western Australia
• Butcherbird Expansion Feasibility Study targets 1.1 million tonnes per annum (Mtpa) manganese production.
• Study demonstrates strong fundamentals, with robust economic returns and rapid capital payback:
• Expansion envisages expanded open-cut mining methods, modified primary comminution circuit and dense media
separation (DMS) back-end solution to optimise grade and recoveries.
• Expanded operation will establish Butcherbird as a low-cost Mn operation with a US$2.76/dmtu C1 FOB cost – which will
ensure sustainable profitability at lower manganese prices compared to the current pilot operation.
• Low capital cost of A$49.8M with annual operation cashflow of A$57.3M at full production – payback period of 14 months
from start of operations.
• Study used all available Measured and Indicated Resources within the mine plan to support a 7.2-year mine life – which
represents 36% of the total mineral resource inventory within granted mining lease M52/1074.
• E25 plans to undertake infill drilling in areas containing Inferred Resources, outside the current mine plan, within the next
12 months targeting an additional 20-25 years of mine reserves at the proposed production levels.
Battery Grade High Purity Manganese (HPMSM) Development – Louisiana USA
• E25 approved for US$57 million of tax incentives under Louisiana State’s Industrial Tax Exempt Program (ITEP).
• Two key international patents lodged under the Patent Co-Operation Treaty, expected to be processed in 2024.
Corporate
• Non-Executive Director John Ribbons was appointed Chairman following Seamus Cornelius’ decision to step down
from E25 Board.
Element 25 Limited
Level 1, Building B, Garden Office Park,
355 Scarborough Beach Road,
Osborne Park WA 6017
ABN: 46 119 711 929
T: +61 8 6375 2525
E: admin@e25.com.au
W: element25.com.au
BUTCHERBIRD OPERATIONS
Expansion Plans
Post quarter-end in January 2024, E25 released a Feasibility Study (FS) on the proposed expansion of its 100%-owned
Butcherbird Manganese Operations in WA to target manganese concentrate production of 1.1 million tonnes per annum
(Mtpa). The FS demonstrated strong economics with robust economic returns and rapid capital payback, with highlights
including:
• Expansion to 1.1Mtpa manganese concentrate production using expanded open-cut mining methods, a modified primary
comminution circuit and a dense media separation (DMS) back-end solution to optimise grade and recoveries.
• Expanded operation will establish Butcherbird as a low-cost Mn operation with a US$2.76/dmtu C1 FOB cost – which will
ensure sustainable profitability at lower manganese prices compared to the current pilot operation.
• The FS utilises all the available measured and indicated resources within the mine plan. The Company plans to undertake
infill drilling in areas containing Inferred Resources, outside the current mine plan, within the next 12 months targeting an
additional 20-25 years of mine reserves at the proposed production levels.
• Measured, Indicated and Inferred Mineral Resources used to support the 7.2 years mine life from 2024 to 2031 represents
36.0% of the total mineral resource inventory within the granted mining lease M52/1074.
• Low capital requirement of A$49.8M capital. Average base case annual operating cashflow of A$57.3M at full production.
• No change to the Proven and Probable Ore Reserve of 49.2Mt at 10.2% Mn containing 5.0Mt Mn (4.1Mt recoverable Mn).
• Payback period of 14 months from start of operations based on forecast cashflows.
• Expanded mining production and process commissioning is currently scheduled to commence within 11 months, subject
to final investment decision and securing project financing.
• Base case involves an annual production and sale of 1.1M tpa of lump manganese ore grading 32% Mn.
• Expanded concentrate production strategy complements and enhances E25’s plan to develop a high purity manganese
sulfate (HPMSM) plant in Louisiana to supply offtake partners General Motors LLC (GM) and Stellantis NV (Stellantis) with
high purity manganese for EV battery manufacture 1.
Butcherbird comprises the granted Mining Lease M52/1074 and two granted exploration licences E52/2350 and E52/3606, as
well as several granted and pending Miscellaneous Licences required for Project infrastructure.
The FS included updated macro-economic inputs and other design parameters where appropriate based on current market
conditions and on the improved understanding of the optimal processing methodology derived from production data since
the commissioning of the current processing plant. Changes to the processing circuit include the use of a mineral sizer for
primary comminution, and a DMS drum for final beneficiation.
1
See E25 ASX Announcements dated 9 January 2023 and 26 June 2023
El
t 25 Li it d
2
Key Assumptions:
• DMS process recovery of 96%.
• Increased manganese concentrate production to 1.1Mtpa.
• Increased ore recovery and decreased ore loss due to change in processing equipment.
• Exchange rate (USD:AUD) of 0.66 from 2024, with a longer-term assumption of 0.69 from 2027 onwards.
• Capital cost estimate of A$49.8M includes:
o
Construction of expanded processing infrastructure;
o
Construction of a nearby mining camp, at a capital cost of A$5.5M; and
o
Construction of an airstrip to enable direct flights to Butcherbird, at a capital cost of A$2.2M.
• An updated site organisation chart was developed with updated costs reflective of the proposed expansion.
• Updated mining costs based on the expanded mining requirements.
• Updated sustaining capex involving an expanded tails storage facility (TSF).
• Updated manganese ore pricing to reflect current spot and forecast pricing.
FS results confirmed that the robust economics of the site are maintained and improved for the planned expansion, offering
E25 opportunities to further improve the economics and performance of the Project by taking advantages of the inherent
economies of scale achieved in the larger scale production operations. This results in better utilisation of mining and
processing equipment, improved operational efficiencies and better utilisation of the large resource/reserve base
underpinning the Project.
The seven-year project utilises 86% of the Measured resources2 and 61% of the Indicated resources available within the
Butcherbird resource base.
Ongoing resource delineation drilling is already planned to increase the mine life by adding Yanneri Central and Coodamudgi
Central into the Indicated/Measured resource categories in H1 2024.
Production
Following the cessation of in-pit mining, production has focussed on the processing of stockpiles to minimise operational
costs. The processing plant is operated on the night shift only; the day shift targets maintenance, maintenance planning,
operational discipline and maximising productivity during run hours.
With the successful release of the FS, Element 25 will immediately commence detailed design, planning and procurement for
the expansion of manganese ore production 3. Expansion of the processing facility at Butcherbird aligns with E25’s
commissioning target date for its planned battery grade high purity manganese sulphate monohydrate (HPMSM) project to be
built in Louisiana, USA in partnership with General Motors LLC and Stellantis NV 4.
2
E25 ASX Announcement dated 17 April 2019
3
Reference: Company ASX Release dated 23 January 2024.
4
Reference: Company ASX Releases dated 9 January 2023 and 26 June 2023
El
t 25 Li it d
3
Activities over the next three months will focus on detailed engineering and design, project financing and finalising the
required permitting to support the commencement of construction in line with the project schedule.
In parallel with expansion activities, the Company will suspend Butcherbird’s current production operations, aiming to reduce
operational cash outflows and re-focus resources and available cash on implementing the expansion plan outlined in the FS.
Recent weak manganese prices support this decision.
Category
Unit
Dec-23
23-Sep
Jun-23
Mar-23
Opening Product Inventory
t
28,475
32,710
26,489
24,654
Mined Ore
t
-
280,037
252,486
311,385
Concentrate Production
t
44,977
41,101
59,350
62,277
Product Sales
t
-
42,001
47,271
62,418
Closing Product Stockpiles
t
73,452
28,475
32,710
26,489
Shipping Cost
CIF China 44% Benchmark
Price
t
$15.00
$15.00
$18.00
$14.90
USD
4.17
4.37
4.98
$6.00
Figure 1. Quarterly production figures.
Logistics/Shipping
Approximately 16kt of product was transported to Port Hedland in December following the allocation of the bunker by the
Pilbara Port Authority (PPA) in preparation for a January shipment. Since quarter end, haulage has continued and a shipment
of approximately 50,000 tonnes of manganese concentrate is expected to sail from Australia in late January or early February.
The Great Northern Highway was closed several times during December for accidents and/or bushfires, impacting haulage
volumes. However, it is not expected to affect total tonnages for the planned shipment.
Plans are being reviewed to cooperate with a small iron or exporter to optimise the usage of trucks and bunker space in Port
Hedland. The use of ultra-quad combinations is also being investigated to reduce overall haulage costs in the future,
particularly in relation to the planned mining expansion.
No shipments took place during the quarter.
Manganese Market and Ore Marketing Strategy
The manganese ore market remained weaker in line with a general downturn in commodities demand as a result of sluggish
economic news out of China 5. The market during the quarter was generally flat with little direction from major markets where
manganese ores are used, most notably silico-manganese, which is where the Element 25 ore product is most commonly
consumed.
5
https://www.nytimes.com/2024/01/16/business/china-gdp-q4-2023.html
El
t 25 Li it d
4
Prices of most ferro alloys as well as EMM remain sluggish, despite some announcements of capacity reduction in the market.
It is expected that Chinese government stimulus measures will take some time to start impacting steel and, consequently,
ferroalloy production which is a major consumer of manganese.
The continued low ore prices have resulted in the closure of some production operations in South Africa 6. Combined with
logistics challenges, this resulted in reduced port stocks in China and a modest price increase early in January 2024.
Shipping rates have returned to pre-COVID levels; however, late in the quarter, there have been some small increases in daily
charter rates and resultant freight rates.
The Element 25 marketing team will continue to closely monitor developments in the manganese ore market to guide future
strategic decision-making.
HPMSM PROJECT EXECUTION
Patent Applications Submitted
E25 developed an innovative, advanced processing flowsheet to convert Butcherbird manganese concentrate into high purity
manganese sulphate monohydrate (HPMSM), a critical raw material for the manufacture of lithium-ion batteries. The
proprietary flowsheet reduces energy consumption, virtually eliminates waste and delivers the lowest carbon intensity HPMSM
globally based on publicly available information 7. The process offers a pathway to the delivery of expanding volumes of
ethically sources, traceable, transparent HPMSM supply to US markets. Element 25 is developing a first of its kind processing
facility in Louisiana to produce up to 135Kt per annum of HPMSM for US electric vehicle (EV) supply chains 8.
In November, E25 finalised and lodged two key international patent applications in relation to its battery grade high-purity
manganese sulphate monohydrate (HPMSM) production process, lodging these under the Patent Co-Operation Treaty (PCT),
claiming priority from Australian Patent Application(s) 2022903576 & 2022903573.
The patent applications are expected to provide protection for two key manganese processing steps in the Element 25 flow
sheet, which are critical to delivering the advantages of its HPMSM process compared to existing processes currently in
production, namely:
• Reduced energy consumption compared to roast reduction processing.
• Reduced reagent consumption compared to traditional neutralisation.
Separation of waste residues in forms that can be used in existing industrial processes, thereby minimising or eliminating
waste disposal requirements. These innovations mean that the E25 process can claim industry-leading low carbon intensity
and compete on cost in target markets when compared with existing producers. E25 expects its patent applications to be
processed in 2024.
6
https://projectblue.com/blue/news-analysis/712/plans-to-reduce-manganese-ore-output-in-south-africa
7
Reference: Company ASX Release dated 21 February 2023
8
Reference: Company ASX Release dated 12 April 2023
El
t 25 Li it d
5
LAKE JOHNSON PROJECT, WA
During the quarter, E25 provided an update on exploration activities at its
Lake Johnston Lithium Project in WA, with the Lake Johnston area rapidly
becoming an emerging province for hard rock pegmatite-hosted lithium
mineralisation. The Company holds significant exploration tenure over the
Lake Johnston Greenstone Belt, where recent exploration activities continue
to enhance the belt’s potential for commercial lithium mineralisation 9.
Despite the recent increase in global lithium exploration activity, the Lake
Johnston greenstone belt remains relatively underexplored, with exploration
previously focusing on gold and nickel. Recent results announced by
explorers, including TG Metals Limited (ASX:TG6) and Charger Metals Limited
(ASX:CHR), however, demonstrate there is significant potential for lithium
mineralisation in the belt.
Figure 1: E25's Lake Johnson Project location in WA
CHR, whose exploration tenure abuts E25’s ground to the east, has confirmed
economic grades of primary lithium mineralisation in drilling at the Medcalf Prospect and has also identified significant
anomalous lithium in soil sampling at the Mt Day Prospect 10.
TG6 holds ground abutting the southwestern margin of Element 25’s tenure and recently announced highly encouraging
drilling intercepts at the Burmeister Prospect 11.
Accordingly, E25 completed data compilation and target generation in the area to identify high-priority targets for follow-up
testing. Activities included the compilation of historical exploration results, re-processing and reinterpreting available
geophysical datasets, and analysing satellite imagery and other remote sensing data sets to identify potential outcropping
pegmatites or other geological or geochemical targets. A number of high-priority targets have been identified.
Hardcore Prospect
Historic drilling intersected broad zones of light-coloured igneous rocks logged as “pegmatites”. Previous attempts to
resample the drill spoils were unsuccessful as the spoils washed away, however drill chips have been successfully recovered
from the historic chip trays. These have been sampled as composites and submitted for assay, and while the results will not be
quantitative, they may determine if there is anomalous lithium or lithium pathfinder elements in these intersections.
9
Reference: Company ASX release dated 28 November 2023.
10
Reference: https://chargermetals.com.au/projects/lake-johnston-lithium-project/
11
Reference: https://wcsecure.weblink.com.au/pdf/CHR/02650743.pdf
El
t 25 Li it d
6
Lisa Prospect
Satellite image interpretation has identified a potential target at
the Lisa Prospect at Lake Johnson. The satellite image clearly
shows a light-coloured outcrop with a strike length of
approximately 250m. The anomaly is interpreted as a potential
pegmatite target, however it will require on-ground follow-up
investigations to determine the geological nature of the
anomaly.
Figure 2
Satellite image anomaly – potential outcropping pegmatite.
Rhoda Prospect
The Rhoda Prospect was identified from the Geological Survey of Western Australia (GSWA) regional mapping data. Six
pegmatite dykes are recorded over a strike length of ~7km on the GSWA 1:100k map of the area with two areas identified in the
‘critical minerals database’ as mapped pegmatites.
Subsequent to the end of the quarter an application for forfeiture was lodged by Cacique Resources Pty Ltd in relation to
E63/2027. The application for forfeiture claims that the tenement holder has failed to comply with the expenditure conditions
for the year ending 2023. Element 25 denies that it has failed to comply with the minimum expenditure commitment for the
expenditure year the subject of the application and intends to defend the application.
CORPORATE
Louisiana Tax Incentives
In December, E25 announced it had achieved all milestones for the Louisiana State Industrial Tax Exempt Program (ITEP)
incentive package to support E25’s planned HPMSM processing facility in Ascension Parish, Louisiana. Governor Jon Bel
Edwards approved the incentive agreement between E25, the Louisiana Department of Economic Development, and the
Louisiana Board of Commerce and Industry.
This concluded several months of active stakeholder engagement with multiple levels of state and local government and local
community members to explain the benefits that will flow from the proposed Facility. The total benefits available to the Project
from State Incentives have been estimated by EY at US$57M 12.
12
Reference: EY
El
t 25 Li it d
7
Program
Description
Estimated Value (US$)
Industrial Tax Exempt
Program (ITEP)
The Louisiana Industrial Ad Valorem Tax Exemption Program (ITEP) is a state incentive
program, which offers an attractive tax abatement for manufacturers who make a commitment
to jobs and payroll in the state. This program provides an 80% property tax abatement for an
initial term of five years and the option to renew for five additional years at an 80% property tax
abatement on a manufacturer’s qualifying capital investment related to the manufacturing
process in the state.
$34.3M
Quality Jobs Program
The Quality Jobs, or QJ, program provides a cash rebate to companies that create well-paid
jobs and promote economic development. The program provides up to a 6% cash rebate of
annual gross payroll for new direct jobs for up to 10 years.
$14.8M
Performance-Based Cash
Grants
Performance-based grant to be used for qualified permanent infrastructure improvements on
site. This will be administered pursuant to a cooperative endeavour agreement and requires
company compliance with and adherence to agreed upon employee and payroll goals.
$6.0M
LED FastStart
FastStart offers essential workforce services such as employee recruitment and screening,
safety and teamwork training, leadership development for managers, and specialized
assistance for employees as they transition to a new community and a new job.
$2.0M
TOTAL
$57.1M
Table 1. Summary of Louisiana State incentives available to E25's HPMSM Project proposed for Ascension Parish
The incentive package agreed with the State includes direct and indirect measures of financial support for the Project, which
will reduce the required funding to construct the Facility. To meet the requirements of the incentive agreement, E25 has
committed to:
• Construct the Facility with a minimum expenditure of US$211,640,709 on fixed plant and equipment and buildings/fixed
structures.
• Where feasible and practical, consider using local labour and manufacturing capability in the construction of the Facility.
• Operate the Facility in order to provide employment in the State of Louisiana.
• Create and maintain sixty-five (65) jobs with payroll totalling US$5.85M per annum for the duration of the incentive
agreement.
In all cases, the current development plan for the Facility meets or exceeds all required thresholds to secure the State’s
support under the agreement. E25’s Louisiana Project is expected to create 220 new direct jobs with average annual salaries of
more than US$90,000. Louisiana Economic Development estimates the Project will result in an additional 408 new indirect
jobs, for a total of 628 new jobs in the Capital Region.
BOARD CHANGES
John Ribbons assumed the role of Chairperson of the Element 25 Board at the Company’s Annual General Meeting on 28
November 2023, following long-serving Chairman Seamus Cornelius’ decision to tender his resignation.
Mr Ribbons is a long-standing Non-Executive Director of Element 25. Initially appointed to the Board in July 2010, Mr Ribbons
has worked within the resources industry for more than 20 years in financial and company secretary roles and is a qualified
CPA and Chartered Secretary. Mr Ribbons has extensive knowledge and experience with ASX-listed production and exploration
companies. He has considerable mine-site operations experience and has also been involved with the ASX listing of several
exploration companies. He has experience in capital raisings, ASX and TSX compliance and regulatory requirements. Mr
Ribbons’ extensive experience within the industry will add value to Element 25’s strategic plan to grow operations and extend
its high-purity manganese sulphate (HPMSM) project globally.
El
t 25 Li it d
8
The Company thanked Mr Cornelius for his contribution to E25 after joining the Board in 2011. Mr Cornelius left a strong legacy
and felt it was the appropriate time to step away as the Company moves into the next strategic phase.
E25’s Board now comprises three independent Non-Executive Directors and the Company’s Managing Director.
ASX ADDITIONAL INFORMATION
The ASX Appendix 5B quarterly report covering the six month period ending 31 December 2023 is attached and lodged with
this report.
In accordance with ASX Listing Rule 5.3.5, payments to related parties of the Company and their associates during the quarter
totalled $120,000 comprising salary, directors’ fees, consulting fees and superannuation.
In accordance with ASX Listing Rule 5.3.1, payments relating to Mining Exploration totalled $70,000.
ABOUT ELEMENT 25
Element 25 is an ASX-listed company (ASX: E25) operating the world class 100%-owned Butcherbird Manganese Project in
Western Australia and developing battery grade high purity manganese sulphate monohydrate (HPMSM) products for
traditional and new energy markets. It aims to become an industry leading, world class, low-carbon battery materials
manufacturer.
Company information, ASX announcements, investor presentations, corporate videos, and other investor material in the
Company’s projects can be viewed at: www.element25.com.au.
Justin Brown
Media Inquiries:
Managing Director
Nathan Ryan
Email: admin@e25.com.au
Email: nathan.ryan@nwrcommunications.com.au
Phone: +61 (8) 6375 2525
Phone: +61 (0) 420 582 887
COMPETENT PERSONS STATEMENT
The company confirms that in the case of estimates of Mineral Resource or Ore Reserves, all material assumptions and technical parameters underpinning the
estimates in the market announcements dated 17 April 2019 and 19 May 2020 continue to apply and have not materially changed. The company confirms that
the form and context in which the competent person’s findings are presented has not been materially modified from the original market announcements.
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Mr Justin Brown who is a
member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results and Exploration Targets were compiled, Mr Brown was
an employee of Element 25 Limited. Mr Brown is a geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Brown consents to the inclusion of this information in the form and context in which
it appears in this report.
This announcement is authorised for market release by Element 25 Limited’s Board of Directors.
El
t 25 Li it d
9
FORWARD LOOKING STATEMENTS
This announcement may include forward-looking statements. These forward-looking statements are based on Element 25’s expectations and beliefs
concerning future events. Such forward-looking statements concern Element 25’s anticipated results and progress of its operations in future periods, planned
exploration and, if warranted, development of its properties and plans related to its business and other matters that may occur in the future. These statements
relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of
management. All statements contained herein that are not clearly historical in nature are forward-looking, and the words “anticipate,” “believe,” “expect,”
“estimate,” “may,” “might,” “will,” “could,” “can,” “shall,” “should,” “would,” “leading,” “objective,” “intend,” “contemplate,” “design,” “predict,” “potential,”
“plan,” “target” and similar expressions are generally intended to identify forward-looking statements.
Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to
differ from those expressed or implied by the forward-looking statements. Forward-looking statements in this release include, but are not limited to,
statements with respect to risks related to:
•
Element 25’s operations being further disrupted and Element 25’s financial results being adversely affected by public health threats, including any
renewed coronavirus pandemic;
•
Element 25’s limited operating history in the HPMSM industry;
•
Completing required permitting, zoning and re-zoning activities required to commence processing operations for Project;
•
Element 25’s ability to achieve and maintain profitability and to develop positive cash flows from Element 25’s mining and processing activities;
•
Investment risk and operational costs associated with Element 25’s exploration activities;
•
Element 25’s ability to enter into and deliver products under supply agreements;
•
The pace of adoption and cost of developing electric transportation and storage technologies dependent upon lithium batteries;
•
Element 25’s ability to access capital and the financial markets;
•
Recruiting, training and developing employees;
•
Compliance with government regulations;
•
Environmental liabilities and reclamation costs;
•
Estimates of and volatility in HPMSM prices or demand for HPMSM;
•
Element 25’s share price and trading volume volatility; and
•
Element 25’s failure to successfully execute Element 25’s growth strategy, including any delays in Element 25’s planned future growth.
All forward-looking statements reflect Element 25’s beliefs and assumptions based on information available at the time the assumption was made. These
forward-looking statements are not based on historical facts but rather on management’s expectations regarding future activities, results of operations,
performance, future capital and other expenditures, including the amount, nature and sources of funding thereof, competitive advantages, business prospects
and opportunities. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific,
known and unknown, that contribute to the possibility that the predictions, forecasts, projections or other forward-looking statements will not occur. Although
Element 25 have attempted to identify important factors that could cause actual results to differ materially from those described in forward-looking
statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Should one or more of these risks or uncertainties
materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those anticipated, believed, estimated, or expected.
Element 25 cautions readers not to place undue reliance on any such forward looking statements, which speak only as of the date made. Except as otherwise
required by the securities laws of Australia, Element 25 disclaims any obligation to subsequently revise any forward-looking statements to reflect events or
circumstances after the date of such statements or to reflect the occurrence of anticipated or unanticipated events. Element 25 qualifies all the forward
looking statements contained in this release by the foregoing cautionary statements.
El
t 25 Li it d
10
ASX Additional Tenement Information for Quarterly Report to 31 December 2023
The mining tenements held at the end of the quarter and their location
Tenement reference
Location
Interest at beginning of quarter
Acquired/
Disposed
Interest at end of
quarter
E20/659
Eelya Hill WA
10%
N/A
10%
E46/1366
Black Hill WA
100%
N/A
100%
E52/1529
Mt Padbury WA
100% (Note 1)
N/A
100% (Note 1)
E52/2350
Butcher Bird WA
100%
N/A
100%
E52/3606
Yanneri Bore WA
100%
N/A
100%
E52/3706
Yanneri Pool WA
100%
N/A
100%
E52/3735
Limestone Bore WA
100%
N/A
100%
E52/3769
Kumarina WA
100%
N/A
100%
E52/3779
Beyondie Bluff WA
100%
N/A
100%
E52/3858
Yanneri Well WA
100%
N/A
100%
E52/4064
Neds Gap WA
100%
N/A
100%
E52/4149
Neds Gap WA
100%
N/A
100%
E52/4153
Yanneri Well WA
100%
N/A
100%
E52/4155
Weelarrana WA
100%
N/A
100%
L52/211
Limestone Bore WA
100%
N/A
100%
L52/215
Butcherbird East 1 WA
100%
N/A
100%
L52/216
Butcherbird East 2 WA
100%
N/A
100%
L52/217
Butcherbird East 3 WA
100%
N/A
100%
L52/218
Butcherbi
Share your feedback
Discover