Investor Update Mid West Major Projects Conference April 26
Released
Released
Announcement PDF
ASX : E25
OTCQX : ELMTF
Building a Global Manganese Business
Sustainable manganese ore and HPMSM for
global steel and battery markets.
Presentation – Mid West Major Projects Conference (April 2026)
This presentation (Presentation) contains only a brief overview of Element 25 Limited and its associated entities (Element 25 or E25) and their respective
activities and operations. The contents of this presentation, including matters relating to the geology of Element 25's projects, may rely on various
assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any independent
verification.
This presentation contains multiple forward-looking statements. Known and unknown risks and uncertainties, and factors outsideof Element 25’s control,
may cause the actual results, performance and achievements of Element 25 to differ materially from those expressed or implied in this presentation.
To the maximum extent permitted by law, Element 25 does not warrant the accuracy, currency or completeness of the information in this presentation, nor
the future performance of Element 25, and will not be responsible for any loss or damage arising from the use of the information.
The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and potential
investors and shareholders should seek independent advice before making any investment decision in regard to Element 25 or its activities.
The information contained in this Presentation is not investment, tax, legal, accounting, financial or other advice and does not, and will not, form any part of
any contract or commitment for any purpose including the acquisition of new shares in E25.
It does not account for your particular needs and circumstances, including your investment objectives, financial situation, tax or other position. Any
investment decision in relation to an equity raising or the Company should be made solely on the basis of your own independent enquiries.
Disclaimer
Share Register:
Expanding the 100% owned Butcherbird
Manganese Mine in Western Australia to produce
high-quality manganese oxide concentrate.
Developing a USA-based refinery to supply ethical
battery-grade High Purity Manganese Sulphate
Monohydrate (HPMSM) products.
Strong support from OEM partners General Motors
and Stellantis for the planned Louisiana refinery to
provide non FEOC HPMSM supply security.
Element 25 Introduction
Stellantis
ATM Facility
Retail
Board &
Management
E25 ELMTF 325M NIL
3
Strategic Vision to Create Shareholder Value
Butcherbird Expansion
1.1Mt p.a. Manganese Concentrate1
Build and commission a large-scale processing
facility at the 100% owned Butcherbird
Manganese Mine in WA.
Expand Globally
HPMSM Expansion - EU & Asia
Multiple HPMSM modules globally to deliver
sustainable HPMSM supply to global markets
targeting Europe and Asia.
Louisiana HPMSM
USA Critical Raw Materials2
Construct the first US HPMSM processing facility
(Louisiana), producing 65,000 tonnes per annum
of battery-grade HPMSM with GM and Stellantis
10-Year Plan
3-Year Plan
1-Year Plan
Best in class, secure supply, ethically produced,
scalable HPMSM for lithium-ion batteries:
Sustainably Supplying Global Markets
1 Reference: Company ASX Release Dated 22 January 2025
2 Reference: Company ASX Release Dated 12 April 2023
4
The Butcherbird Manganese Project
Butcherbird Manganese – Supplying Steel & Battery Industries
▪ Unique geology - very clean metallurgically – no toxic contaminants.
▪ Located in Australia, a Tier-1 jurisdiction with strong ESG regulation.
▪ Produces a high-quality manganese concentrate ideal for manganese alloys and
battery grade high-purity manganese sulphate (HPMSM).
1 Reference: Company ASX Release Dated 29 October 2024
2 Reference: Company ASX Release Dated 21 February 2023
Providing high quality
manganese for traditional
and new energy markets.
6
World Class Resource1
>270M tonnes
Long-Life Mine
>18 years production
Large Scale Production2
1.1M tonnes per year
Simple Geology: Low-Cost, Low-Impact Operations
Classification Tonnes (Mt) Mn (%) Contained Mn (Mt)
Resource1
274 10.0 27.4
Reserve2 101.4 10.4 10.5
RESOURCE GROWTH POTENTIAL
• Large resource offers long term
operating potential.
• Mineralisation outside existing
resource provides upside.
• Ore suitable for ferroalloys,
battery grade HPMSM and EMM.
ENVIRONMENTALLY BENIGN OPERATION
• Ore from surface.
• Low strip-ratio.
• No explosives required.
• No dewatering required.
• One reagent – water.
• Very low levels of contaminants.
1 Reference: Company ASX Release Dated 29 October 2024 (Mineral Resource Estimate Update)
2 Reference: Company ASX Release Dated 22 January 2025
7
Large, Long-Life Manganese Mine in Western Australia
M52/1074
E52/2350
1Reference: Company ASX Release dated 22 January 2025
2Reference: Company ASX Release dated 29 October 2024
Simple Logistics:
Existing road and port
infrastructure
Mining Reserve:
101.4Mt @ 10.4% Mn1
Measured
Indicated
Coodamudgi
Yanneri
Ridge
8
CONSTRUCTION READY
• Granted Mining Lease
• Fully Permitted
• Early Procurement
Commenced
• Existing infrastructure
(bore fields, TSF,
roads, camp)
• ~12 Month
Construction
New, re-designed and expanded
processing facility to optimise and
scale the process.
CRUSHER
DMS PLANT
SCREEN
PRODUCT
LOADING
Butcherbird to Expand to 1.1Mt p.a. Production
Reference: Company ASX Release Dated 22 January 2025
Reference: Company ASX Release Dated 7 October 2024
9
PRODUCT
LOGWASHER
Key Metrics Unit Value
Ore Mined Ktpa 6,100
Concentrate Prod. Ktpa 1,100
Concentrate Grade Mn 31.6%
Undiscounted
Cashflow
AUD (pa) $70.5
Mine Life Years 18.3
NPV8 (Real) (Pre-Tax) AUD $561M
NPV8 (Real) (Post-Tax) AUD $379M
IRR (pre-tax) % 96%
Op. Cost C1 (FOB) USD/dmtu $2.86
Capital Cost AUD $64.8M
Case Study 1:
• FMG Solomon Mine
• Ore Type: Iron Ore
• Feed Rate: 1,300 tph
Case Study 2:
• Brazil
• Ore Type: Bauxite
• Wet/clay rich feed
Butcherbird Expansion Project - Process Plant
Reference: MMD Sizing Iron Ore
Crushing Circuit:
Improved clay handling
• Learnings from the Stage 1
Pilot showed that high clay
feed material can cause
throughput challenges in
the crushing circuit.
• Production impacts
materially compromises
unit costs in a bulk
operation.
• Mineral sizer designed to
handle clay rich feed
material.
Butcherbird Stage 1 Pilot
Grizzly/Jaw Crusher
Process Upgrade:
Mineral Sizer /Rolls Crusher
Examples of Mineral Sizers in
use in similar settings to BBX
10
Butcherbird Expansion Project - Process Plant
Reference: KISA
Washing Circuit:
Clay removal from laterite feed
• The logwasher is an agitated scrubber
which acts to break up and wash clays out
of the feed material.
• The clay contains very little manganese so
its removal upgrades the concentrate to
approach the target Mn grade for sale.
• The process uses water as the only reagent
making the tailings environmentally benign.
11
Clays and other impurities are scrubbed by
rotating intermeshing paddle shafts and
washed by counter-current water flow.
Reference: Heavy Media Drum – Malvern Engineering
Dense Media Drum:
Improved grade & recovery
• Separate ore from gangue
based on density not
optics/colour
• Eliminate separation
challenges associated with
imperfect washing and ore
presentation.
• Widely used process
technology – low risk
approach suited to larger
scale operation.
Low-density/lighter
waste shale particle
High-density/ heavier
manganese product particle
Dense media Separation (DMS) is a mature process technology used in a
wide range of mineral processing plants including iron ore and manganese
to separate lighter waste material from denser ore material by floating the
waste in a ferro-silicon slurry to create separate product and waste streams.
12
Butcherbird Expansion Project - Process Plant
• Northern Australia Infrastructure Facility (NAIF) to provide up to AU$50 million
senior debt facility for Element 25’s Butcherbird Manganese Expansion
Project2.
• Butcherbird development based on a 1.1 Mtpa manganese concentrate
operation and delivers outstanding metrics 1.
• Manganese concentrate to be sold to steel industry partners and provide
feedstock for E25’s planned HPMSM facility in Louisiana, USA.
• Butcherbird Expansion plan is fully approved under WA Regulatory
Framework3.
• NAIF to act as the sole senior secured lender to the project - the balance of
funds to be sourced from financiers including offtake prepayment,
subordinated debt and royalty financing as potential mechanisms.
Butcherbird Expansion Delivers Robust Economics
1Reference: Company ASX Release Dated 22 January 2025
2Reference: Company ASX Release Dated 17 June 2025
3 Reference: Company ASX Release Dated 12 March 2025
AUSTRALIAN FEDERAL GOVERNMENT
(NAIF) TO PROVIDE $50 MILLION
FINANCE PACKAGE FOR
BUTCHERBIRD EXPANSION PROJECT2
13
Low cost operation with forecast C1 cost of US$2.86/dmtu FOB.
Long-life asset with >18-year Ore Reserve.
Low capital costs of A$64.8M (2025 Feasibility Study Estimate).
Operating cashflows of $70.5M per annum drive rapid capital payback.
Manganese Is Comparatively Abundant But Not Everywhere…
14
• Manganese deposits heavily concentrated in
challenging jurisdictions.
• Australia is the only allied country with significant
manganese reserves and production.
• Australian manganese production declining with old
mines closing and limited new production.
Manganese ore global distribution:
Manganese Ore Production 2020-2024:
AUSTRALIA
(decreasing)
Reference: Company ASX Release dated 23 January 2024
Butcherbird Expansion – Low Costs Underpin Strong Margins
Reference: Project Blue 2025
Historical Mn Ore Price Cycles – US$/dmtu CIF China
15
High Grade Index
(historical)
36.5% Mn Index
(historical)
BBX AISC Cost
(2025 FS) BBX Sale Price 44% Index Basis
(Yrs 1-5 2025 FS)
Reference: Company ASX Release dated 23 January 2025
Butcherbird Expansion – Scale Supports Lower Cost Structure
Reference: Project Blue 2025
Global Production Cost Curve – US$/dmtu CIF China
16
Current Spot Price (44% CIF China)
Long-term Average Price(44% CIF China)
Butcherbird Expansion Project
Estimated Costs (2025 FS)
(US$3.22/dmtu CIF China AISC)
Groote Eylandt
Woodie Woodie
Butcherbird Expansion Project
2025 FS Sale Price (Yrs 1-5)
(US$4.59/dmtu CIF China AISC)
Butcherbird Expansion Project – On Track for Production
17
Reference: Company ASX Release dated 25 November 2025
• Detailed engineering well advanced utilizing Integrated project Team
(IPT) approach.
• Long lead time procurement progressed with orders placed for crusher
and logwasher equipment.
• Key construction and operational contracts being finalised including
road haulage, mining, port and offtake.
• Fully permitted under Department of Local Government, Industry
Regulation and Safety (LGIRS) regulations.
Construction Tender in Progress
• Civils, SMP, E&I packages in the market with tender submissions under
review. Subject to WHS compliance requirements.
Butcherbird Expansion Project Timeline Guidance
18
The schedule remains subject to a number of key dependencies including achieving project financial close, completion of detailed engineering, procurement of key equipment and finalising the
construction contract(s) in accordance with the planned key dates.
BBX Project Plan Summary 2026 2027
Quarter 1 2 3 4 1 2 3 4
Month J F M A M J J A S O N D J F M A M J J A S O N D
Major Milestones
Finalise Funding
Commissioning
Commercial Production
Major Activities
All Approvals and Permitting
Project Financing
Detailed Engineering Design
Engineering Procurement (MPI)
Logistics Procurement (MPI)
Camp Construction
Construction - Civil
Construction - SMP
High Purity Manganese Strategy
Manganese Is Abundant But Refining Capacity Is Not…
20
Source: Benchmark Forecasts – www.benchmarkminerals.com
Refined battery grade manganese capacity is heavily concentrated in China.
Breaking the Chinese Supply Chain Dominance
• Refined manganese (HPMSM) capacity is heavily
concentrated with >95% of refining capacity located in China.
• Concentrated supply creates supply risk for critical raw
materials used in batteries including manganese.
• Customers are seeking alternative sources of long-term
manganese supply.
• Element 25 provides a long-life mine and a future facing
processing technology.
South Africa
China
Other
Manganese
Ore
Refined
Manganese
Improved, Cost-Competitive, Cleaner Process Technology
Fewer Reagents Lower Emissions No Waste Residue
The Element 25 Process brings significant changes & improvements:
E25 technology enhances ESG profile by:
• Eliminating waste residues.
• Eliminating toxic Reagents like fluorine.
• Increased efficiency and lower costs.
• Faster permitting due to lower impacts.
Reference: Company ASX Release Dated 16 February 2023
21
Global Refining Capacity in the Longer Term **
• Design one, build many approach to development.
• E25 manganese concentrate is a very stable, easily
transported feedstock.
• Allows location optionality for the processing facility.
• Multiple potential sites being explored.
EU
US
AU
KR
JP
EU & UK policy shifts are
competing with the IRA
for investment in battery
and related plants
MoU signed with Nissan
Chemical Corporation to
jointly develop HPMSM
capacity in Japan
Butcherbird Manganese Mine:
1.1 million tonnes per annum of
manganese concentrate production is
planned at the Butcherbird Project in
Western Australia
1
.
Flagship Louisiana HPMSM Facility:
• Supply chain security needs driving
capital flows into US projects.
• Government supported push to
secure critical mineral supply chains.
• E25 partnering with Stellantis & GM
to onshore refining capacity and
capability
1 Reference: Company ASX Release Dated 22 January 2025
22
World-First Non-China HPMSM Refinery – Louisiana USA
WA Manganese Ore:
Louisiana HPMSM:
The planned Louisiana HPMSM
refinery to utilise Australian
manganese to produce high
purity battery grade manganese
sulphate (HPMSM) for lithium -
ion batteries.
Vertically integrated critical battery
raw material supply chain.
Australian manganese concentrate
supplying customers in traditional
ferro-allow markets and planned
battery grade manganese(HPMSM)
production for US lithium-ion
battery manufacturers.
Steel
Li-Ion Batteries
23
Global EV Sales Outlook Remains Strong
24
EV market share continues to grow:
• Electric vehicles to reach over 50% market
penetration by 2030 according to Bloomberg NEF.
• Short term policy settings have reduced uptake in
some markets but medium-term demand
forecasts remains bullish.
• Critical raw material supply remains a key
geopolitical challenge with near total dominance
by China of key raw materials including
manganese.
• Battery grade manganese expected to see strong
demand due to increase in electric vehicle sales
and shift to higher manganese cathode materials.
Near-term global sales outlook for electric and fuel-cell vans, trucks and buses
Global passenger-vehicle sales by drivetrain
Reference: Umicore 2023
Transition to Higher Manganese Battery Cathodes
Reduced nickel and very low to no cobalt content.
LMFP, LMR, LMNO and NMX cathode chemistries offer improved safety, higher energy density, reduced cost per kWh and greater supply chain flexibility.
High Mn means reduced
reliance on Ni and Co:
Why LMR batteries will change the outlook for the EV market
25
Louisiana Battery Grade HPMSM
HPMSM
DoE MESC Grant - Supporting Local Raw Material Supply
Local Supply Chain
• Process and supply chain developed
to maximise U.S. industry
involvement.
• Working with partners GM and
Stellantis to supply low carbon
HPMSM for EV batteries.
• All reagents sourced locally from
established suppliers.
• Site located close located adjacent
to acid recycling facility.
• Solid residues as co-products will be
placed into local industries targeting
zero waste.
• Low carbon, circular economy
approach.
Mn Ore
Acid
Reductant
Neutralisation
MAIN
PRODUCT
US$166M
Grant
Comminution
Leach
Purification
Crystallisation
Logistics
Fertiliser Gypsum SiRon
Co-Product Processing
27
• 18.3 Year Reserve within granted Mining Lease
• 274Mt Resource global resource with exploration upside
• Feasibility Study and project permitting complete
• Northern Australia Infrastructure Facility (NAIF) finance of up to $50M approved
• Life cycle assessment (LCA) completed confirming industry leading carbon intensity
• Further reductions available via renewable energy and reagents
• $64.8M Construction Capital ($70.5M approved NAIF project budget)
• 96% Internal Rate of Return (IRR) and $561M Net Present Value (NPV) (Pre-Tax, Real)
• Competitive cost structure through innovation
• Waste minimisation and reduced emissions provides competitive advantages
• Australian owned and operated mine providing long term secure ethical Mn supply
• USA, Japan and EU Partnerships to enhance battery raw material supply chains
• Stellantis N.V and General Motors LLC – Louisiana HPMSM Project
• Nissan Chemical Corporation– Tokyo Bay Japan HPMSM Project
Global Sustainable Secure Manganese Supply
Long Mine Life
Tier 1 Jurisdiction
Strong Feasibility Study/Financials
Innovative HPMSM Flowsheet
ESG Leading HPMSM Flowsheet
Tier 1 Project Customers & Partners
Construction Ready
1Reference: Company ASX Release Dated 29 October 2024
2Reference: Company ASX Release Dated 17 June 2025
1
2
3
5
4
6
7
3Reference: Company ASX Release Dated 21 February 2023
4Reference: Company ASX Release Dated 22 January 2025
5Reference: Company ASX Release Dated 12 April 2023
6Reference: Company ASX Release Dated 26 June 2023
7Reference: Company ASX Release Dated 2 April 2025 28
The Planned Element 25 HPMSM facility in Louisiana, USA
*Subject to successful project financing and permitting
For Illustration Purposes Only
29
ASX : E25
OTCQX : ELMTF
Justin Brown Media Inquiries:
Managing Director
Email: admin@e25.com.au
Phone: +61 (8) 6375 2525
Nathan Ryan
Email: nathan.ryan@nwrcommunications.com.au
Phone: +61 (0) 420 582 887
Contact Details
Butcherbird Manganese Mine - Resources & Reserves
1 Reference: Company ASX Release Dated 22 January 2025 (Ore Reserve Update)
2 Reference: Company ASX Release Dated 29 October 2024 (Mineral Resource Estimate Update)
• Current Reserve:
• Only utilises approximately ~40% of
global Mineral Resource;
• Provides for a mine life of >18 years1.
• High conversion of measured and
indicated resources to reserve.
• Excellent potential for future expansion
with known mineralization outside
resource areas.
• Simple geology, low technical risk.
• Global resources not closed off.
Mineral Resource
2
Ore Reserve
1
Resource Category Tonnes (Mt) Mn (%)
Measured 14 11.3
Indicated 116 10.1
Inferred 144 9.8
Total 274 10.0
Deposit Classification Tonnes (Mt) Grade (Mn%) Contained Mn (Mt)
Yanneri Ridge
Proved 11.3 11.8 1.33
Probable 70.4 10.2 7.15
Coodamudgi
Proved - - -
Probable 19.1 10.3 1.97
Stockpiles Proved 0.6 9.2 0.06
Total 101.4 10.4 10.5
31
Competent Person’s Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Mr Justin Brown who is a member of the Australasian Institute of Mining
and Metallurgy. At the time that the Exploration Results and Exploration Targets were compiled, Mr Brown was an employee of Element 25 Limited. Mr Brown is a geologist and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Brown consents to the inclusion of this information in the form and context in which it
appears in this report.
The Company confirms that in the case of Production Targets, all material assumptions underpinning the production target, or the forecast financial information derived from a production target, in
the market announcement dated 22 January 2025 continue to apply and have not material changed.
The Company confirms that in the case of estimates of Mineral Resource or Ore Reserves, all material assumptions and technical parameters underpinning the estimates in the market
announcements dated 29 October 2024 and 22 January 2025 continue to apply and have not materially changed. All estimates or Mineral Resources or Ore Reserves underpinning the production
target have been prepared by a competent person/s in accordance with the requirements of the JORC Code, Appendix 5A. The Company confirms that it is not aware of any new information or data
that materially affects information included in previous announcements, and all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially
changed.
Please note with regard to exploration targets, the potential quantity and grade is conceptual in nature, that there has been insufficient exploration to define a Mineral Resource and that it is uncertain
if further exploration will result in the determination of a Mineral Resource.
For further information on Element 25 Limited and its Projects please visit its website at www.element25.com.au which contains copies of all continuous disclosure documents to ASX, Competent
Persons’ Statements and Corporate Governance Statement and Policies.
This release has been approved by the Element 25 Limited Board of Directors.
32
Share your feedback
Discover