Half Year Report and Accounts
Released
Released
Announcement PDF
INTERIM REPORT
Interim Financial Report
For the Half Year Ended 31 December 2023
Element 25 Limited
ABN: 46 119 711 929 ASX: E25
element25.com.au
TABLE OF CONTENTS
Principal Activities and Review of Operations
3
Directors' Report
4
Audit Independence Declaration
12
Consolidated Statement of Profit or Loss
and Other Comprehensive Income
13
Consolidated Statement of Financial Position
14
Consolidated Statement of Changes in Equity
15
Consolidated Statement of Cash Flows
16
Notes to the Consolidated Financial Statements
17
Directors' Declaration
24
Independent Auditor’s Report
25
Corporate Directory
27
PRINCIPAL ACTIVITIES AND REVIEW OF OPERATIONS
Introduction
Element 25 Limited (E25 or Company) (ASX: E25; OTCQX: ELMTF) is the operator of the Butcherbird
Manganese Project (Butcherbird or Project) which hosts Australia’s largest onshore manganese
resource with current JORC resources of over 260Mt of manganese ore 1. Butcherbird is 1,050km
north of Perth and 130km south of Newman in the Pilbara region of Western Australia.
E25’s goal is to become an industry leading low-carbon battery materials manufacturer,
producing high quality manganese concentrate and battery grade High Purity
Manganese Sulphate Monohydrate (HPMSM) products for traditional and new energy
markets. The Company plans to construct a HPMSM facility in Louisiana, USA, having
completed a Feasibility Study (FS) for this project in April 2023 2. The facility will use
concentrate from E25’s existing operations at Butcherbird in WA as feedstock.
The facility is supported by key offtake and funding agreements in place with General Motors
LLC (GM) and Stellantis N.V. (Stellantis), which are contributing a combined US$115M in
project funding through equity, pre-payment and senior debt alongside offtake for ~65% of
planned HPMSM production from the first production train 3.
Key operational milestones achieved during the first six months of the year included:
•
Butcherbird Expansion Feasibility Study targeting 1.1 million tonnes per annum (Mtpa) manganese production
demonstrated pre-tax Net Present Value of A$228 million (8% discount) with an Internal Rate of Return of 113% and
annual cashflow of A$57.3M.
•
Front-end Engineering and Design (FEED) completed to optimise HPMSM plant design for preferred Louisiana site
and detailed engineering activities commenced
•
Detailed Butcherbird Expansion project execution schedule finalised with mechanical completion on track for 2025
target.
•
Site assessments including cultural, environmental and geotechnical surveys completed, with no issues or concerns.
•
Contractual milestones under the GM and Stellantis offtake and funding packages remain on track with GM,
importantly, completing due diligence and accepting the HPMSM Feasibility Study in September 2023 4.
•
Final project schedule remains subject to finalisation of project financing and project financial close.
•
Approval of US$57 million of tax incentives under Louisiana State’s Industrial Tax Exemption Program (ITEP) 5.
•
Two key international patents lodged under the Patent Co-Operation Treaty, expected to be processed in 2024 6.
1
Reference: Company 2023 Annual Report to Shareholders
2
Reference: Company ASX Release dated 12 April 2023
3
References: Company ASX Releases dated 9 January 2023 and 26 June 2023
4
Reference: Company ASX Releases dated 18 September 2023
5
Reference: Company ASX Releases dated 19 December 2023
6
Reference: Company ASX Releases dated 27 November 2023
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 3
DIRECTORS’ REPORT
Your directors submit their financial report for the consolidated entity (the Group, the Company or E25) consisting of
Element 25 Limited and its controlled entities for the half-year ended 31 December 2023.
DIRECTORS
The names of Directors who held office during or since the end of the half-year are set out below. Directors were in office for
this entire period unless otherwise stated.
•
Seamus Cornelius (resigned 28 November 2023)
•
Justin Brown
•
John Ribbons
•
Sam Lancuba
•
Fanie Van Jaarsveld
COMPANY SECRETARY
Michael Jordon
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 4
BUTCHERBIRD OPERATIONS SUMMARY
Safety
For the six months ending December 2023, E25 sustained two Lost Time Injuries (LTI's) and two Medical Treatment Injuries
(MTI's). Both MTIs were First Aid Treatment Injuries and both of which were minor in nature.
A specialist external medical provider conducted a site visit to review the Company's medical and emergency management
system and provide support and improvements. Continuous improvement activities are ongoing.
Expansion Study
Post half year-end in January 2024, E25 released a
Feasibility Study (BB FS) 7 on the proposed
expansion of the Butcherbird Mine to produce 1.1
million tonnes per annum (Mtpa) of manganese
concentrate. The BB FS demonstrated strong
economics with robust economic returns and rapid
capital payback, with highlights including:
•
Expansion to 1.1Mtpa manganese concentrate production using expanded open-cut mining methods, a modified
primary comminution circuit and a dense media separation (DMS) back-end solution to optimise grade and
recoveries.
•
Expanded operation will establish Butcherbird as a low-cost Mn operation with a US$2.76/dmtu C1 (direct production
cost) FOB (Free on Board) cost – which will ensure sustainable profitability at lower manganese prices compared to
the current pilot operation.
•
The BB FS utilises all the available Measured and Indicated resources within the mine plan. The Company plans to
undertake infill drilling in areas containing inferred resources, outside the current mine plan, within the next 12
months, targeting an additional 20-25 years of mine reserves at the proposed production levels.
•
Measured, Indicated and Inferred Mineral Resources used to support the 7.2 years mine life from 2024 to 2031
represents approximately 36.0% of the total mineral resource inventory within granted mining lease M52/1074.
•
Low capital cost of A$49.8M.
•
Average base case annual operating cashflow of A$57.3M at full production.
•
Payback period of 14 months from start of operations based on forecast cashflows.
•
Process plant commissioning is currently estimated to be achievable within approximately 11 months from a final
investment decision (FID).
•
The base case contemplates annual production and sale of 1.1M tpa of manganese ore grading 32% Mn.
•
Expanded concentrate production strategy complements and enhances E25’s plan to develop a HPMSM plant in
Louisiana.
The BB FS results confirm that the economics of the mine are improved under the planned expansion scenario, which benefit
from the inherent economies of scale achieved in the larger-scale production operations. This results in better utilisation of
mining and processing equipment, improved operational efficiencies and better utilisation of the large resource/reserve base
underpinning the Project.
The seven-year project utilises 86% of the Measured resources and 61% of the Indicated resources available within the
Butcherbird resource base.
7
Reference: Company ASX Release dated 23 January 2024
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 5
Mining and Processing
With manganese prices at cyclical lows during the reporting period, E25 restructured production at Butcherbird to reduce ore
production and costs to align with this lower price environment. This helped to preserve cash and allow the team to focus on
E25’s downstream project. In-pit mining ceased and production shifted focus to processing stockpiles to minimise
operational costs.
With the release of E25’s Expansion Study for Butcherbird, the Company subsequently suspended Butcherbird’s production
operations to re-focus resources and available cash on implementing the mining and processing expansion plan. Senior
management are well progressed with regards to securing the capital required to fund the expansion project and have
identified a Government grant that is available for Critical Minerals and is preparing an application.
HPMSM PROJECT
E25 is progressing with plans for construction of an integrated battery grade high purity manganese sulphate facility in
Louisiana, USA to produce battery-grade HPMSM, a critical raw material used in the construction of lithium-ion battery
cathode precursor materials to power the electrification of the global vehicle fleet. The HPMSM produced in Louisiana will be
used in the manufacture of electric vehicle Pre-Cathode Active Materials (pCAM).
The Facility will utilise concentrate produced from E25’s existing operations at the Butcherbird Manganese Mine which
exports high silica manganese concentrate for use in the steel industry. The concentrate produced at Butcherbird is uniquely
suited for conversion to HPMSM using Element 25’s proprietary process, which has a number of unique advantages over
existing processes used in China.
It is supported by key offtake and funding agreements with General Motors LLC (GM) and Stellantis N.V. (Stellantis), which are
contributing a combined US$115M in project funding through a combination of equity, pre-payment and senior debt
alongside offtake for approximately 65% of the planned HPMSM production from the first production train.
E25 continued to engage local engineering firms CSRS Inc (CSRS) and FIDES (a CSRS subsidiary) as owner’s engineers and CDI
Engineering Solutions (CDI) and Universal Plant Services (UPS) as design and construction engineers to refine the engineering
and design of the facility prior to commencement of construction. Key focus areas included:
•
Front-end Engineering and Design (FEED).
•
Site assessments and permitting.
•
Inbound and outbound logistics and reagent supply.
•
Project financing.
The FEED work programme included engineering conducted to a greater level of rigor and detail compared to a Feasibility
Study. It aims to provide additional engineering and cost estimation detail as a project transition from conceptual design to
an Engineering, Procurement and Construction (EPC) contract.
The scope of the study covers engineering disciplines including:
•
Site layout optimisation.
•
Civil and Structural design and layout.
•
Process flow diagrams.
•
Process and instrumentation diagrams.
•
Electrical design.
•
Piping and mechanical design.
•
Material take-offs to inform cost estimation activities.
E25 commissioned FIDES, CDI and UPS to undertake the next phase of detailed engineering and design which will advance
the project through to FID.
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 6
Supply Agreements
E25 commenced negotiations regarding utility, service and reagent suppliers, including natural gas, power and sulphuric
acid. Finalisation of these contracts will only occur once the proposed site for the construction of the Facility is formally
selected. E25 is negotiating contractual arrangements with local suppliers, or nearby facilities to utilise their existing
infrastructure to provide key process and logistical inputs to the project including:
•
Sulphuric Acid;
•
Steam;
•
Raw water;
•
Water treatment;
•
Construction materials offloading; and
•
Manganese ore offloading.
Sourcing this infrastructure and related services without needing to build dedicated infrastructure is an important part of
E25’s strategy to minimise capital costs.
Site Surveys
E25 completed surveys including a cultural survey, a wetland delineation survey and geotechnical, boundary and
topographical surveys, which did not highlight any issues or concerns.
Pilot-Scale Metallurgical Test Programme
A final pilot-scale process verification test programme for the E25 flowsheet was completed at Veolia HPD’s North America
facility, utilising the purified leach solution (PLS) previously produced and processed it through the Veolia pilot scale
crystalliser facility using optimised conditions established in previous tests.
This was successful, producing HPMSM well within the required specifications for battery applications and well inside the E25
Standard Specification which is the quality stipulated in the agreements with both Stellantis and GM.
The results exceeded expectations and confirmed the E25 process is able to deliver into existing requirements but also to
offer opportunities to supply higher purity product options into the future as battery technology develops and higher purities
are required. The programme also yielded significant quantities of HPMSM which has been packaged and stored in suitable
conditions before being dispatched to E25’s existing offtake partners as well as potential future offtake and funding partners
to assist in ongoing discussions.
Patent Applications
The Company uses a proprietary processing
flowsheet to convert Butcherbird manganese
concentrate into HPMSM, a critical raw material for
the manufacture of lithium-ion batteries. The
flowsheet reduces energy consumption, targets zero
waste and delivers the lowest carbon intensity
HPMSM globally based on publicly available
information. The process offers a pathway to the
delivery of expanding volumes of ethically sources,
traceable, transparent HPMSM supply to US and
global markets. Using this technology, E25 is
developing a first-of-its-kind processing facility in Louisiana to produce up to 135Kt per annum of HPMSM for US electric
vehicle (EV) supply chains.
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 7
In November 2023, E25 finalised and lodged two key international patent applications in relation to its battery grade HPMSM
production process, lodging these under the Patent Co-Operation Treaty (PCT), claiming priority from Australian Patent
Application(s) 2022903576 & 2022903573. 8
The patent applications are expected to provide protection for two key manganese processing steps in the Element 25 flow
sheet, which are critical to delivering the advantages of its HPMSM process compared to existing processes currently in
production, namely:
•
Reduced energy consumption compared to roast reduction processing.
•
Reduced reagent consumption compared to traditional neutralisation.
Separation of waste residues in forms that can be used in existing industrial processes, thereby minimising or eliminating
waste disposal requirements. These innovations mean that the E25 process can claim industry-leading low carbon intensity
and compete on cost in target markets when compared with existing producers.
LAKE JOHNSON PROJECT, WA
In November, E25 provided an update on exploration
activities at its Lake Johnston Lithium Project in WA, with
the Lake Johnston area rapidly becoming an emerging
province for hard rock pegmatite-hosted lithium
mineralisation. The Company holds significant exploration
tenure over the Lake Johnston Greenstone Belt, where
recent exploration activities continue to enhance the belt’s
potential for commercial lithium mineralisation.
Despite the recent increase in global lithium exploration
activity, the Lake Johnston greenstone belt remains
relatively underexplored, with exploration previously
focusing on gold and nickel. Recent results announced by
explorers, including TG Metals Limited (ASX:TG6) and
Charger Metals Limited (ASX: CHR), however, demonstrate
there is significant potential for lithium mineralisation in the
belt.
CHR, whose exploration tenure abuts E25’s ground to the
east, confirmed economic grades of primary lithium
mineralisation in drilling at the Medcalf Prospect and has also identified significant anomalous lithium in soil sampling at the
Mt Day Prospect.
TG6 holds ground abutting the southwestern margin of Element 25’s tenure and recently announced highly encouraging
drilling intercepts at the Burmeister Prospect. Accordingly, E25 completed data compilation and target generation in the area
to identify high-priority targets for follow-up testing. Activities included the compilation of historical exploration results, reprocessing and reinterpreting available geophysical datasets, and analysing satellite imagery and other remote sensing data
sets to identify potential outcropping pegmatites or other geological or geochemical targets.
8
Reference: Company ASX Release dated 27 November 2023
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 8
E25 has identified several high-priority targets including:
•
Hardcore Prospect – where historic drilling intersected broad zones of pegmatites. Drill chips have been submitted for
assay.
•
Lisa Prospect – satellite image interpretation has identified a potential target which requires on-ground follow-up.
•
Rhoda Prospect – identified through Geological Survey of Western Australia (GSWA) regional mapping data.
Subsequent to the end of the quarter, an application for forfeiture was lodged by Cacique Resources Pty Ltd in relation to
E63/2027. The application for forfeiture claims that the tenement holder has failed to comply with the expenditure conditions
for the year ending 2023. Element 25 denies that it has failed to comply with the minimum expenditure commitment for the
expenditure year the subject of the application and intends to defend the application.
CORPORATE
Board Changes
John Ribbons assumed the role of Chairperson of the E25 Board at the Company’s Annual General Meeting on 28 November
2023, following long-serving Chairman Seamus Cornelius’ decision to tender his resignation. 9
Mr Ribbons is a long-standing Non-Executive Director of E25. Initially appointed to the Board in July 2010, Mr Ribbons has
worked within the resources industry for more than 20 years in financial and company secretary roles and is a qualified CPA
and Chartered Secretary. Mr Ribbons has extensive knowledge and experience with ASX-listed production and exploration
companies. He has considerable mine-site operations experience and has also been involved with the ASX listing of several
exploration companies. He has experience in capital raisings, ASX and TSX compliance and regulatory requirements.
Mr Ribbons’ extensive experience within the industry will add value to E25’s strategic plan to grow operations and extend its
high-purity manganese sulphate (HPMSM) project globally.
The Company thanked Mr Cornelius for his contribution to E25 after joining the Board in 2011. Mr Cornelius left a strong
legacy and felt it was the appropriate time to step away as the Company moves into the next strategic phase.
E25’s Board now comprises three independent Non-Executive Directors and the Company’s Managing Director.
Louisiana Tax Incentives
In December 2023, E25 announced it had achieved all milestones for the Louisiana State Industrial Tax Exemption Program
(ITEP) incentive package to support E25’s planned HPMSM processing facility in Ascension Parish, Louisiana. Governor Jon
Bel Edwards approved the incentive agreement between E25, the Louisiana Department of Economic Development, and the
Louisiana Board of Commerce and Industry. 10
This concluded several months of active stakeholder engagement with multiple levels of state and local government and
local community members to explain the benefits that will flow from the proposed Facility. The total benefits available to the
Project from State Incentives have been estimated by EY at US$57M.
The incentive package agreed with the State includes direct and indirect measures of financial support for the Project, which
will reduce the required funding to construct the Facility. To meet the requirements of the incentive agreement, E25 has
committed to:
9
Reference: Company ASX Release dated 30 November 2023
10
Reference: Company ASX Release dated 19 December 2023
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 9
•
Construct the Facility with a minimum expenditure of US$211,640,709 on fixed plant and equipment and
buildings/fixed structures.
•
Where feasible and practical, consider using local labour and manufacturing capability in the construction of the
Facility.
•
Operate the Facility in order to provide employment in the State of Louisiana.
•
Create and maintain sixty-five (65) jobs with payroll totalling US$5.85M per annum for the duration of the incentive
agreement.
In all cases, the current development plan for the Facility meets or exceeds all required thresholds to secure the State’s
support under the agreement. E25’s Louisiana Project is expected to create 220 new direct jobs with average annual salaries
of more than US$90,000. Louisiana Economic Development estimates the Project will result in an additional 408 new indirect
jobs, for a total of 628 new jobs in the Capital Region.
US OTCQX Market Trading
In August 2023, E25 began trading on the OTCQX market in the United States under the symbol “ELMTF”, upgrading from the
Pink® market. OTC Markets Group Inc. (OTCQX: OTCM) operates regulated markets for trading 12,000 U.S. and international
securities. Its data-driven disclosure standards form the foundation of three public markets: OTCQX® Best Market, OTCQB®
Venture Market and Pink® Open Market.
Upgrading to the OTCQX Market is an important step for companies seeking to provide transparent trading for their U.S.
investors. For companies listed on a qualified international exchange, streamlined market standards enable them to utilize
their home market reporting to make their information available in the U.S.
To qualify for OTCQX, companies must meet high financial standards, follow best practice corporate governance and
demonstrate compliance with applicable securities laws.
RESULTS
During the half year ended 31 December 2023, the Company recognised revenue of $4,566,764 (2022: $13,490,055) in respect
to the shipments of ore from the Group’s 100% owned Butcherbird Manganese Project located in Australia and other income
of $111,111 (2022: $1,340,417).
During the period the Group incurred cost of sales of $15,046,132 (2022: $18,952,532) in respect to direct material and
production costs attributable to the extraction, processing and transportation of manganese ore.
During the period, exploration and pre-feasibility expenditures incurred by the Group amounted to $189,562 (2022:
$2,069,527). The Group recognised general and administration expenditure incurred amounted to $3,214,714 (2022:
$3,439,802), including corporate administration expense of $2,578,964 (2022: $1,543,498), depreciation expense of $373,952
(2022: $322,123), and $261,798 (2022: $1,574,181) on loss of foreign exchange, loss of sales of assets, share-based payment
expense, and other expenses. This has resulted in an operating loss after income tax for the half year ended 31 December
2023 of $13,793,391 (2022: $9,650,497).
The Group had a cash balance of $21,371,461 as at 31 December 2023.
Shareholder Return
Basic and diluted loss per share (cents)
2023
2022
$
$
(6.35)
(6.24)
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 10
SIGNIFICANT EVENTS AFTER THE BALANCE DATE
No other matters or circumstances, besides those disclosed at note 16, have arisen since the end of the period which
significantly affected or may significantly affect the operations of the Group, the results of those operations, or the state of
affairs of the Group in future financial periods.
DIVIDENDS
No dividends were paid or declared during the half year. No recommendation for payment of dividends has been made.
AUDITOR’S INDEPENDENCE DECLARATION
A copy of the auditor's independence declaration as required under section 307C of the Corporations Act 2001 is set out on
page 12.
Signed in accordance with a resolution of the Directors.
Justin Brown
Managing Director
Perth, 15 March 2024
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 11
Auditor’s Independence Declaration
As lead auditor for the review of Element 25 Limited for the half-year ended 31 December 2023, I
declare that to the best of my knowledge and belief, there have been:
(a)
no contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review, and
(b)
no contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Element 25 Limited and the entities it controlled during the period.
Craig Heatley
Partner
PricewaterhouseCoopers
PricewaterhouseCoopers, ABN 52 780 433 757
Brookfield Place, 125 St Georges Terrace, PERTH WA 6000, GPO Box D198, PERTH WA 6840
T: +61 8 9238 3000, F: +61 8 9238 3999, www.pwc.com.au
Liability limited by a scheme approved under Professional Standards Legislation.
Perth
15 March 2024
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE
INCOME FOR THE HALF-YEAR ENDED 31 DECEMBER 2023
Note
31 Dec 2023
$
31 Dec 2022
(Restated)
$
Revenue
3 & 15(ii)
4,566,764
13,490,055
Cost of sales
4 & 15(ii)
(15,046,132)
(18,952,532)
(10,479,368)
(5,462,477)
GROSS PROFIT
Other income
111,111
1,340,417
Exploration and pre-feasibility expenditures
(189,562)
(2,069,527)
(3,214,714)
(3,439,802)
(20,858)
(19,108)
(13,793,391)
(9,650,497)
-
-
(13,793,391)
(9,650,497)
Exchange differences on translation of foreign operations
(113)
(12,047)
Other comprehensive loss for the year, net of tax
TOTAL COMPREHENSIVE LOSS FOR THE YEAR ATTRIBUTABLE TO
EQUITY HOLDERS OF THE COMPANY
(113)
(12,047)
(13,793,504)
(9,662,544)
(6.35)
(6.24)
General and administration expenses
5 & 15(i)
Finance expense
LOSS BEFORE INCOME TAX
INCOME TAX EXPENSE
LOSS FOR THE YEAR ATTRIBUTABLE TO EQUITY HOLDERS OF THE
COMPANY
OTHER COMPREHENSIVE INCOME
Items that may be reclassified to profit or loss
LOSS PER SHARE FOR LOSS ATTRIBUTABLE TO THE ORDINARY EQUITY
HOLDERS OF THE COMPANY
Basic and diluted loss per share (cents per share)
The above Consolidated Statement of Profit or Loss and Other Comprehensive Income should be read in conjunction with the
accompanying notes.
See note 15 for details regarding the restatement.
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 13
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2023
31 Dec 2023
30 Jun 2023
$
$
Cash and cash equivalents
21,371,461
28,885,874
Trade and other receivables
3,853,614
975,551
14,649,006
12,135,790
405,370
651,440
40,279,451
42,648,655
Note
CURRENT ASSETS
Inventory
6
Financial assets at fair value through profit or loss
TOTAL CURRENT ASSETS
NON-CURRENT ASSETS
Restricted cash
578,560
528,560
Property, plant and equipment
7
21,631,449
22,464,399
Assets under construction
7
13,275,185
1,026,401
1,065,938
890,340
334,418
504,549
TOTAL NON-CURRENT ASSETS
36,885,550
25,414,249
TOTAL ASSETS
77,165,001
68,062,904
Deferred exploration and evaluation expenditure
Right of use asset
CURRENT LIABILITIES
Trade and other payables
8
6,191,680
9,401,012
Deferred Revenue
9
3,161,382
-
Provisions
10
Lease Liability
TOTAL CURRENT LIABILITIES
623,493
630,633
349,126
367,263
10,325,681
10,398,908
NON-CURRENT LIABILITIES
Lease Liability
17,568
180,023
2,057,317
2,057,317
TOTAL NON-CURRENT LIABILITIES
2,074,885
2,237,340
TOTAL LIABILITIES
12,400,566
12,636,248
NET ASSETS
64,764,435
55,426,656
134,533,276
111,448,309
Provisions
10
EQUITY
Issued capital
Reserves
11
7,203,017
7,156,814
Accumulated losses
(76,971,858)
(63,178,467)
TOTAL EQUITY
64,764,435
55,426,656
The above Consolidated Statement of Financial Position should be read in conjunction with the accompanying notes.
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 14
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF-YEAR ENDED 31 DECEMBER 2023
Note
BALANCE AT 1 JULY 2023
Loss for the period
Contributed
Equity
Share-Based
Payments
Reserve
Foreign
Currency
Translation
Reserve
Accumulated
Losses
Total
$
$
$
$
$
111,448,309
7,159,981
(3,167)
(63,178,467)
55,426,656
-
-
-
(13,793,391)
(13,793,391)
OTHER COMPREHENSIVE INCOME
Exchange differences on translation of
foreign operations
-
-
(113)
-
(113)
TOTAL COMPREHENSIVE LOSS
-
-
(113)
(13,793,391)
(13,793,504)
-
-
-
23,091,967
-
-
-
(7,000)
TRANSACTIONS WITH OWNERS IN THEIR
CAPACITY AS OWNERS
Shares issued during the period
11
23,091,967
Share issue transaction costs
11
(7,000)
Share-based payments
46,316
46,316
BALANCE AT 31 DECEMBER 2023
134,533,276
7,206,297
(3,280)
(76,971,858)
BALANCE AT 1 JULY 2022 (RESTATED)
77,691,579
5,874,424
(36,320)
(38,251,297)
45,278,386
-
-
-
(9,650,497)
(9,650,497)
Exchange differences on translation of
foreign operations
-
-
36,320
(48,367)
(12,047)
TOTAL COMPREHENSIVE LOSS
-
-
36,320
(9,698,864)
(9,662,544)
Shares issued during the period
35,523,499
1,168,568
-
-
36,692,067
Share issue transaction costs
(1,754,300)
-
-
-
(1,754,300)
BALANCE AT 31 DECEMBER 2022
111,460,778
7,042,992
-
(47,950,161)
70,553,609
Loss for the period
64,764,435
OTHER COMPREHENSIVE INCOME
TRANSACTIONS WITH OWNERS IN THEIR
CAPACITY AS OWNERS
The above Consolidated Statement of Changes in Equity should be read in conjunction with the accompanying notes.
See note 15 for details regarding the restatement.
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2023 | 15
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2023
31 Dec 2023
31 Dec 2022
$
$
Receipts from customers
4,446,280
13,539,342
Expenditure of mining interest
(51,948)
(415,884)
Note
CASH FLOWS FROM OPERATING ACTIVITIES
Payments to suppliers and employees
(21,321,605)
(23,444,129)
Interest received
319,375
5,210
Interest paid
(18,513)
(23,741)
-
211,621
(369,295)
(1,462,621)
(16,995,706)
(11,590,202)
(50,000)
149,975
Government grant funding received
Expenditure on exploration and pre-feasibility expenditure
NET CASH OUTFLOW FROM OPERATING ACTIVIT