Butcherbird Project Achieves 107% Ore Reserve Increase
Released
Released
Announcement PDF
ANNOUNCEMENT | 22 JANUARY 2025 | ASX: E25
E25 ACHIEVES 107% ORE RESERVE INCREASE AT
BUTCHERBIRD MANGANESE PROJECT, WA
Element 25 Limited (Element 25, E25 or Company) (ASX: E25;
OTCQX: ELMTF) is pleased to announce a 107% increase in Ore
Reserves at its Butcherbird Manganese Project (Butcherbird or
Project) in Western Australia.
Highlights:
•
Butcherbird Ore Reserve increased by 107% to 101.4Mt at
10.4%Mn for 10.54Mt contained manganese.
•
Life of Mine increased to 18.3 years1 at the proposed 1.1Mt
annual production rate 1,2 for manganese concentrate.
•
Ore Reserve based on two deposits, Yanneri Ridge and
Coodamudgi, which are among eight deposits at the Project.
•
Confirms Butcherbird’s robust, > 18-year, long-life operation in
line with Element 25’s strategic plan.
This Ore Reserve statement relates to the Yanneri Ridge and Coodamudgi
manganese deposits within granted mining lease M52/1074 at Element
25’s 100%-owned Project in Western Australia.
The Project comprises eight known manganese mineral resources located in an area of approximately 600km2
in the southern Pilbara region, approximately 1,050km north of Perth and 130km south of Newman. Access is
directly via the Great Northern Highway, which traverses the Project, providing an immediate logistics solution
for ore haulage to Port Hedland for export via existing bulk handling facilities.
Table 1: Butcherbird Ore Reserve Estimate 3.
Deposit
Classification
Yanneri Ridge
Coodamudgi
Stockpiles
Tonnes (Mt)
Grade (Mn%)
Contained Mn (Mt)
Proved
11.3
11.8
1.33
Probable
70.4
10.2
7.15
Proved
-
-
-
Probable
19.1
10.3
1.97
Proved
0.6
9.2
0.06
101.4
10.4
10.5
TOTAL
Reference: E25 ASX release dated 22 January 2025.
Reference: E25 ASX release dated 23 January 2024.
3
Data are reported to significant figures to reflect appropriate precision in the estimate, and this may cause some apparent discrepancies in totals.
1
2
22 JANUARY 2025 | ASX: E25
1
The Butcherbird Manganese Mine produced high-quality manganese concentrate while in operation for nearly
three years, up until early 2024. Operations are currently temporarily suspended while Element 25 develops an
expanded processing facility to increase mine production to a nominal 1.1Mt per annum of concentrate 4.
Element 25 plans to sell manganese from the expanded Project into the manganese alloy market, as well
supplying feedstock for the Company’s planned high-purity manganese sulphate monohydrate (HPMSM)
refinery in Louisiana, USA, which is being developed in partnership with General Motors LLC (GM) and
Stellantis N.V. (Stellantis) to supply low carbon critical battery raw materials to the electric vehicles (EV)
industry.
Butcherbird contains current JORC (2012) mineral resources of 274Mt of manganese ore 5, 6, and is Australia’s
largest onshore manganese resource.
INTRODUCTION
Element 25 has held exploration tenure in the area since 2009 and has advanced the Project via a series of
exploration programs from early-stage rock-chip sampling and regional mapping through to multiple drilling
programs and resource infill drilling. Several progressive Mineral Resource Estimates (MRE) have been
completed since work commenced (refer to the Resource Estimate Section for details).
The Project is 100% owned by Element 25 and comprises granted Mining Lease M52/1074 and two granted
exploration licences, E52/2350 and E52/3606, in addition to several infrastructure licences. Mining Lease
M52/1074 encompasses the Yanneri Ridge and Coodamudgi manganese deposits, which are the focus of this
Ore Reserve update. The Project straddles the Great Northern Highway and the Goldfields Gas Pipeline
(GGP), providing turnkey logistics and potential energy solutions.
Existing approvals are in place from recent operations and the expansion project approvals have been
submitted and are well advanced. The Company has Native Title and pastoral lease access agreements in
place.
Element 25 completed a Feasibility Study (FS) for the Project in January 2024, which has been updated to
support this Reserve Statement, including additional detail with regard to capital and operating costs. The
updated FS has been released in conjunction with this Reserve Statement 7. The FS contemplates a mining
operation to extract ore via open-pit mining methods. The ore will be processed in a purpose-built processing
facility producing manganese lump products which will be trucked to Port Hedland and sold to manganese
consumers around the world and to the planned Element 25 Louisiana processing facility to produce HPMSM.
The Ore Reserve estimate is based on this Ore Reserve Statement which should be read in conjunction with
the FS.
Reference: E25 ASX releases dated 23 January 2024 and 30 January 2024.
Reference: E25ASX release dated 29 October 2024.
6
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012.
7
Reference: E25 ASX release dated 22 January 2025.
4
5
22 JANUARY 2025 | ASX: E25
2
ORE RESERVE CLASSIFICATION
Element 25 updated the global Butcherbird Mineral Resource Estimate (MRE) in October 2024 8, which
included a substantial upgrade to the tonnages in the Measured and Indicated resource categories.
This updated Ore Reserve is developed from the October 2024 MRE for the Yanneri Ridge and Coodamudgi
manganese deposits. The resource models and their development are described separately in the Mineral
Resource Estimate report8.
Proved and Probable Ore Reserves have been derived from Measured and Indicated Mineral Resources in
accordance with Joint Ore Reserve Committee (JORC) Code 2012 guidelines. The updated Ore Reserve for
the Project is summarised in Table 1.
The Ore Reserve classification reflects the Competent Persons’ assessment of the deposits with the
application of appropriate modifying factors.
MINING METHODS
The Yanneri Ridge and Coodamudgi manganese deposits are two of the eight known manganese deposits
contained within the Butcherbird Project. The Yanneri Ridge and Coodamudgi deposits are shallow, lateritic
manganese resources most suitable for mining by open pit mining methods utilising conventional mining
equipment, with multiple stages of pit development. Yanneri Ridge outcrops along its southern border, whereas
Coodamudgi is buried under 3m to 5m of cover.
The selected mining method, mine design and extraction sequence are tailored to suit orebody characteristics,
minimise dilution and ore loss, defer waste movement, utilise planned process plant capacity and expedite
cash generation in a safe manner. Geotechnical work and site experience has indicated that the majority of the
mineralisation can be mined as free-dig material without the need for drill and blast techniques. Some surface
areas contain caprock material that may require campaign blasting and/or dozer ripping. In-pit ripping has not
been required historically but may be used locally as required to improve productivity rates.
Mine planning, including pit optimisation, mine design, scheduling and cost modelling for the Yanneri Ridge
resource, was completed by E25 in collaboration with Mine Planning Services (MPS) and Minero to support the
design of the site layout including site haul roads, pit access roads, detailed pit stage development designs,
waste dumps, topsoil stockpiles, mine workshops, run of mine (ROM) ore pads, processing plant, tails storage
facility and bore field.
8
Reference: E25ASX release dated 29 October 2024.
22 JANUARY 2025 | ASX: E25
3
Figure 1: Project site layout showing planned mining areas and associated infrastructure.
Figure 2: Project site layout showing Pits and waste landforms.
22 JANUARY 2025 | ASX: E25
4
CUT-OFF GRADE AND METAL PRICE
A processing rate to deliver 1.1Mtpa manganese concentrate production was chosen based on optimised
productivity factors using standard processing equipment supported by manganese market supply/demand
considerations. The startup processing throughput and the cut-off grade at that throughput were determined
based on operating costs and revenues derived from previous experience and the updated FS. The selected
cut-off grade is 7%Mn.
A mining schedule was developed by Jim Moore of MPS to ensure that adequate ore tonnes were delivered to
the ROM to achieve the planned processing product output. Minero used this schedule to calculate a mining
cost using first principles that includes a contractor profit margin.
The Ore Reserve was estimated using the life-of-mine (LOM) economic parameters drawn from E25’s
economic assumptions. Ore pricing forecasts were sourced from three manganese concentrate forward price
estimates supplied by market research analyst groups Project Blue 9, AME 10 and Wood Mackenzie 11,
supporting a consensus manganese index price of US$5.75/dry metric tonne unit (dmtu) (CIF China, highgrade manganese basis). This equates to an average manganese price used in the study of AU$5.85/dmtu
Free on Board (FOB) Port Hedland.
The consensus manganese price was converted to a FOB Port Hedland price by deduction of shipping and
insurance costs sourced from industry sources. The resultant revenue factor for the Project is derived from the
elements listed in Table 3.
The cut-off value equates to the processing cost including general administration, sustaining capital, corporate
overheads and costs associated with the mine rehabilitation fund.
Manganese value is calculated on a block-by-block basis and considers royalties, concentrate transport and
port charges.
MINERAL RESOURCES
In October 2024, the Company published an updated MRE for the Project 12, including the Yanneri Ridge and
Coodamudgi deposits which are the targets of this ore reserve statement.
The global resource is current as follows:
Table 2: Butcherbird Manganese Project - Global Mineral Resource Estimate – October 2024 (cut-off grade 7%Mn12)
Resource Category
Volume (m³)
Density (t/m³)
Tonnes (t)
Mn %
Measured
6,000,000
2.36
14,000,000
11.3
Indicated
50,000,000
2.33
116,000,000
10.1
Inferred
60,000,000
2.42
144,000,000
9.8
Total
115,000,000
2.38
274,000,000
10.0
https://projectblue.com/
https://aus.amegroup.com/
11
https://www.woodmac.com/
12
Reference:E25 ASX release dated 29 October 2024.
9
10
22 JANUARY 2025 | ASX: E25
5
ORE RESERVE ESTIMATION METHODOLOGY
The Ore Reserve estimate is based on the Mineral Resource estimates classified as Measured and Indicated
after consideration of all modifying factors such as legal, environmental, geological, geotechnical, mining,
metallurgical, social, economic and financial aspects.
Table 3: Ore Reserve Optimisation Economic Assumptions
Assumption
Unit/Qualifier
Value
Manganese Concentrate Price
USD/dmtu (44%Mn CIF China basis)
5.75
AUD/dmtu (31.5%Mn FOB Port Hedland basis)
5.85
Shipping Charges
USD
16.00
Exchange Rate AUD:USD
2024-2034
0.69
Inferred Mineral Resources were excluded from pit optimisation, mine schedules and economic valuations
utilised to validate the economic viability of the Ore Reserves. The Ore Reserve is technically and economically
viable without the inclusion of Inferred Resources.
Prior to pit optimisation, the Mineral Resource model was normalised to Selective Mining Unit (SMU) blocks of
5m E x 5m N x 1m RL to generate a diluted mining model. The SMU block size reflects expected mining
equipment size, the geometry of the geology and anticipated ore loss. Mining dilution and ore loss were applied
through normalisation of the Resource model. The overall effect was 5.4% loss of ore tonnes resulting in 5.1%
loss of metal. This is considered appropriate as all ore is mined and processed where the characteristics of the
manganese allow it to be recovered. The nature of the deposit allows for ore to be bulk mined, with minimal
selectivity required and a relatively small number of ore/waste boundary contacts. The re-blocked model was
applied to the mining model that was used for mine planning purposes.
The Resource model was optimised using the Geovia-Surpac mining software implementation of the LerchsGrossman (LG) algorithm. Nested pit shells are generated and tested with sensitivities on mining cost,
processing cost, metal price, recoveries, and slope angles. This formed the basis of the selection of the optimal
pit shell for the Yanneri Ridge and Coodamudgi deposits. Interim pit shells provided guidance for pit design
stages to delay waste removal and bring forward ore to maximise value and achieve operational design
requirements.
The resultant pit shells were used to develop detailed pit designs with due consideration of geotechnical slope
parameters, minimum mining widths, bench heights, and ramp widths suitable for proposed mining equipment.
These pit designs were used as the basis for production scheduling and economic evaluation.
The mining schedule is based on realistic mining productivity and equipment utilisation estimates sourced from
industry quotations and experience. Pit development requirements, the selected mining fleet productivity and
the vertical rate of mining development were all considered. Staged pit designs along with a stockpiling strategy
were applied to ensure a continuous supply of ore while deferring waste mining for as long as practicable.
The mining schedule is based on supplying suitable material to the processing plant with a name plate capacity
of 1.1Mtpa, planned to be achieved in the fifth month after commissioning as indicated in the FS announced in
conjunction with this release.
22 JANUARY 2025 | ASX: E25
6
The Ore Reserve has been supported by mining operating costs derived from first principles by an experienced
and independent mining consultant, Minero. Process plant Capital Expenditure (CAPEX) has been costed by
Aspect Engineering with input and quotations sourced from original equipment manufacturers (OEM)s.
Operation Expenditure (OPEX) was estimated from a first principal cost model and mine schedule physicals.
Equipment hours and requirements were estimated from haul cycles, production rates, availabilities and
utilisation. Operational and maintenance labour was estimated from equipment hours and maintenance labour
factors.
It is assumed that mining will be undertaken by a suitably experienced mining contractor for the life of mine.
Approximately 600kt ore has been stockpiled ready for use on commissioning, equivalent to six weeks of plant
throughput at full production rates. A four-month ramp-up to full production has been applied to the financial
model.
The final pit design based on the optimised open pit shells is the basis of the Ore Reserve estimate. The
Mineral Resource within the final pit design was converted to Ore Reserve by applying financial and other
parameters to the model.
GEOTECHNICAL ENGINEERING
Geotechnical modelling was based on logging and laboratory testing of selected diamond drill core samples
from 15 diamond-cored drill holes within the designed pit shell, historically drilled for combined metallurgical
and geotechnical purposes.
The geotechnical slope design parameters used were based on work completed by Peter O’Bryan and
Associates Pty Ltd. The open pit designs were based on the recommended geotechnical design parameters.
Geotechnical engineers from Peter O’Bryan and Associates have visited site during the operational phase of
the project. Current batter conditions onsite have demonstrated that the geotechnical parameters applied may
be conservative but have been used in the study and are considered appropriate.
The overall slope parameters considered for the mine planning are summarised as:
Figure 3: Yanneri Ridge – Limit Equilibrium Analysis Model and Proposed Pit Parameter
Specific modifications were made to the western wall of the East Yanneri Ridge open pit which is adjacent to
the Goldfields Gas Pipeline (GGP). In this location the pit wall was designed 25m outside the GGP Pipeline
Reserve to increase the factor of safety in this area. An approved stand-off distance from the GGP is included
in all mining approvals and has been allowed for in the calculation of the mineral reserve and mine designs.
22 JANUARY 2025 | ASX: E25
7
METALLURGY AND PROCESSING ASSUMPTIONS
The Project process facility has been designed to produce 1.1 Mtpa of manganese oxide ore. The design of the
plant assumes twenty-four hours per day seven days per week operation at a nominal throughput of 858.6 dry
tonnes per hour, with annual plant utilisation of 6,570 hours. The processing facility utilises recognised
technology for ore processing circuits and follows a processing route of:
• Crushing.
• Screening.
• Scrubbing.
• DMS Separation.
• Tails Thickening and Water Recovery.
• Tailings storage.
The Project has been the site of a smaller commercial pilot process facility that operated for over two years
processing the Butcherbird ore through a flowsheet comprising these principal process steps. Process data
from the piloting phase has been compiled
together with historical laboratory metallurgical
test data to develop a grade recovery model
that has been used to underpin the
assumptions in the financial model that
supports this Reserve 13.
To develop this model, the following data sets
have been used:
1. Butcherbird production and
metallurgical data.
2. Site laboratory data.
3. PSD Analyses (production).
4. Product dispatch data.
Figure 4 Grade yield model for Butcherbird ore.
The modelled data show, as expected, that
grade and recovery are inversely related, and a grade cut must be selected to maximise profitability. Whilst this
cut may be varied during operations as conditions change, the based case was selected to align with other
assumptions in the FS.
The overall metallurgical manganese recovery for the base case for oxide ore is 60.1%, with a product yield of
19.5%, producing a 31.5% Mn product.
The simplified plant flowsheet is shown in Figure 4.
Figure 5: Simplified Process Flowsheet
13
Reference: E25 ASX release dated 19 December 2019 and 23 March 2020.
22 JANUARY 2025 | ASX: E25
8
Specific equipment selection for the flowsheet was developed using experience from the pilot plant including
factors such as throughput and recovery performance combined with knowledge of how the Butcherbird ore
performs, with particular regard for the high clay content of the lateritic ores. Based on this information and
experience, two main changes were made to the flowsheet from the pilot plant with a shift to a rolls crusher or
mineral sizer for the primary and secondary crushing stages and a dense media separation (DMS) heavymedia drum for the final comminution stage of the process.
The rolls crusher has been selected as it is known to perform more reliably than a jaw crusher in high clay
environments. The two-stage process sizing was selected to maximise recovery and minimise downtime due to
potential process blockages caused by oversized ROM feed.
Test work completed at the Bootu Creek Mine provided important performance information to guide the process
design activities for the DMS circuit14. And the DMS drum in the base case flowsheet is a copy of the Bootu
Creek operation and is upscaled to achieve the same throughput and performance. All equipment is selected
on the higher throughput requirement and selected from vendor-specific data to achieve the operational
performance.
SOCIAL, ENVIRONMENTAL AND APPROVAL
A series of environmental baseline studies have been completed since 2010 with the aim of characterising the
existing environment and identifying any associated Project and approval risks. The baseline environmental
programme has included assessments of flora and terrestrial fauna, landforms, terrestrial environmental quality
(including both mineralised and non-mineralised waste), inland waters, heritage, archaeology, and human
health. All waste rock dumps will be designed in accordance with Western Australian requirements and
approvals conditions.
A programme to confirm process water supply was carried out in 2019 and 2020 on tenements 6 km southeast
of the Butcherbird processing facility. The programme comprised ten water exploration drill holes and
confirmed that the local silcrete aquifer system could yield sufficient process water for the anticipated water
requirements of the Project. A bore field to supply up to 1.0 gigalitre of water per year for processing was
subsequently developed, and this aquifer has met all water supply requirements to meet the operational
demands from operations during the 2021-2024 campaign.
The proposed processing plant design for the expanded operation incorporates additional water recovery
design elements and has reduced tails volumes resulting in an overall net reduction of raw water requirements.
This provides confidence that water quality and quantity of existing bores will meet the Project specifications.
To further reduce water supply risk, exploration drilling in November 2024 targeted a deeper paleo channel
aquifer southeast of the mine site. The drilling was successful and the paleo channel is expected to provide an
excellent additional water supply source once developed. A total of five potential new production bore sites
were identified which will be developed as required.
Two Native Title parties have claims over different areas within the broader Project area. The Company has
secured mining agreements with the Ngarlawangga group, whose lands cover the west of the Project, including
the western portion of the M52/1074 area, and the Karlka Nyiyaparli group, whose lands cover the east of the
14
Reference: E25 ASX release dated 28 July 2022.
22 JANUARY 2025 | ASX: E25
9
proposed Project development area, including the majority of M52/1074. The mining agreements cover current
and future access, exploration and mining activities that allow for site access with agreed compensation.
The Company has developed and maintained a close relationship with the Traditional Owners and has ensured
that the community have been involved in the ongoing development of the Project.
The Project has received approval by the Western Australia Department of Energy, Mines, Industry Regulation
and Safety (DEMIRS) 15. The Mining Proposal for the proposed expansion was lodged with DEMIRS in the
second half of 2024 and was approved on the 21st December 2024. Other statutory approvals have also been
submitted to the Department of Water and Environmental Regulation (DWER) and these are also expected to
be approved in quarter 1 of 2025.
The study programs and subsequent regulatory approvals to date represent a thorough assessment of the
proposed Project area in-line with statutory requirements and guidelines. No material environmental or
approval risks have been identified that would prevent approval of the amended Works Approval under the
Department of Water and Environmental Regulations.
INFRASTRUCTURE
The first production pilot stage of the Project was operational from April 2021 until March 2024, and the
expanded operation will have access to the following established infrastructure:
• Site Access via the Great Northern Highway to the Project and a road for approximately 1km to site
including APA Ltd approval for the Gas Pipeline crossing.
• Site Development and Infrastructure including clearing, levelling and bulk earthworks, access roads
linking the various operational centres (Mine, Process Plant and Administration), drainage and surface
runoff and fencing of operational areas.
• Power generation using 3 x 500kW diesel-powered generators with an additional 500kW generator unit
as backup with reticulation servicing the processing plant and office/workshop area. Water bores at the
bore field each have an individual diesel generator.
• Water Supply – water for construction, mining, processing the ore and other site activities will be sourced
from established bore-field infrastructure to the east of M52/1074. It is considered the current bore field
has adequate groundwater capacity for the foreseeable future.
• Ore stockpiling and ROM pad reclaiming, primary crushing, scrubbing, site laboratory, workshop,
screening and ore sorting facilities. Where new infrastructure is required for the upgraded processing
plant, full replacement and construction costs have been incorporated into the FS.
• A paddock-style Tailings Storage Facility (TSF) has been established with current regulatory approval for
progressive downstream raises to meet the new production requirements for at least the first six years of
operation. Future additional TSF designs are well advanced and will provide additional storage solutions
for the current planned LOM.
15
Reference: E25 ASX release dated 13 January 2025.
22 JANUARY 2025 | ASX: E25
10
• Onsite services including reticulation of power, internet and phone communications, water around the
operational centres, provision of lighting, sewage and wastewater services, fire, compressed air and dust
suppression systems, waste disposal, bulk fuel receival, storage and distribution.
• Buildings including the provision administration, workshops, logistics hubs, warehousing and other nonprocess or mining structures.
The following infrastructure has been specifically excluded as part of the FS:
• The site will currently not include a mining camp, personnel will be housed at nearby established
facilities. The expansion of that accommodation facility and operating costs of all support personnel has
been included in the FS.
• The site will not have an aerodrome but will utilise the airport at Newman, approximately 120km north of
the Project. This cost has also been included. Studies will be undertaken in regards to the use and
expansion of the existing airstrip adjacent to the Kumarina Roadhouse where the accommodation village
is located. This airstrip requires an extension to enable suitable-sized aircraft access but could shorten
travel and flight times.
ABOUT ELEMENT 25
Element 25 is an ASX-listed company (ASX: E25) that operates the world-class 100%-owned Butcherbird
Manganese Project in Western Australia and is currently undertaking activities to expand production to
approximately 1.1Mtpa 16 of medium-grade high silica manganese ore for use in traditional and new energy
markets.
E25 is also commercialising innovative proprietary technology to produce battery-grade high-purity manganese
sulphate monohydrate (HPMSM) for use in Electric Vehicle (EV) battery manufacturing. The Company plans to
build it’s first HPMSM refinery in Louisiana, USA to produce raw materials for the US EV market, in partnership
with General Motors LLC (GM) and Stellantis N.V. (Stellantis)17. E25 aims to become an industry-leading,
world-class, low-carbon battery materials manufacturer.
The Louisiana refinery is planned as the first of several HPMSM facilities planned for development under E25’s
“Design One Build Many” commercialisation strategy which envisages a hub and spoke model, with ore
supplied from E25’s Butcherbird Mine in Western Australia to supply processing facilities in key regional
markets to supply HPMSM to the rapidly growing EV servicing key global regions.
The addition of a potential HPMSM refinery site in Chiba prefecture in Japan in partnership with Nissan
Chemical is another exciting step forward in realising the Company’s strategic plan.
Company information, ASX announcements, investor presentations, corporate videos, and other investor
material in the Company’s projects can be viewed at: www.element25.com.au.
This announcement is authorised for market release by Element 25 Limited’s Board of Directors.
Justin Brown
16
17
Media Inquiries:
Reference: E25 ASX releases dated 23 January 2024 and 30 January 2024.
Reference: E25 ASX releases dated 9 January 2023 and 26 June 2023.
22 JANUARY 2025 | ASX: E25
11
Managing Director
Email: admin@e25.com.au
Phone: +61 (8) 6375 2525
Nathan Ryan
Email: nathan.ryan@nwrcommunications.com.au
Phone: +61 (0) 420 582 887
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Mr Justin Brown who
is a member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results and Exploration Targets were
compiled, Mr Brown was an employee of Element 25 Limited. Mr Brown is a geologist and has sufficient experience which is relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Brown consents to
the inclusion of this information in the form and context in which it appears in this report.
The information in this report that relates to Ore Reserves is based on and fairly represents information and supporting documentation compiled
by Ian Huitson BEng (Min), FAusIMM, a Competent Person who is a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM
Membership No. 103359).
Ian Huitson is an employee of Element 25 Limited. Ian Huitson is a shareholder of Element 25 Limited and is entitled to participate in the Element
25 Limited employee share options plan.
Ian Huitson has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activities
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’ (JORC 2012).
Ian Huitson consents to the inclusion in the report of the matters based on his information in the form and context in which they appear.
The Ore Reserve estimates have been compiled in accordance with the guidelines defined in the JORC Code.
Ian Huitson
Study Manager - Element 25 Limited