SEPTEMBER 2025 QUARTERLY REPORT
QUARTERLY HIGHLIGHTS
Butcherbird Manganese Ore Operations – Western Australia
• Element 25 completes AU$10 million Share Placement to fund it’s the Butcherbird Expansion
Project (BBX) in Western Australia and for working capital.
• Element 25 initiates detailed engineering design for the Butcherbird Expansion Project (BBX)
appointing Perth-based Altris Engineering (Altris) as lead engineering consultant1
.
• Butcherbird is a world-class manganese resource with an Ore Reserve of 101Mt at 10.4% Mn for
10.5 million tonnes of contained manganese2
.
• BBX is designed to increase Butcherbird’s production capacity to 1.1 million tonnes per annum with
January 2025 Feasibility Study update estimating a capital cost of AU$64.8 million with a pre-tax
Net Present Value (NPV) of AU$561 million and 96% pre-tax Internal Rate of Return (IRR) 3
.
• Increased production capacity via BBX will support Element 25’s planned high-purity manganese
sulphate monohydrate (HPMSM) production facility in Louisiana, USA.
• Element 25 secured AU$50 million senior debt facility from Northern Australia Infrastructure Facility
(NAIF)4
• BBX fully approved under WA Regulatory Framework including WA Department of Water (DWER)5
and Environmental Regulation and WA Department of Energy, Mines, Industry Regulation and
Safety (DEMIRS)6
.
Battery Grade High Purity Manganese (HPMSM)
• Element 25 is working to finalise project financing solution for its planned Louisiana HPMSM
refinery.
• Current financing comprises US$166 million in grant funding from the US Department of Energy,
US$85 million in senior debt from General Motors LLC and US$30 million from Stellantis N.V. as
equity and offtake prepayment7
.
1
E25 ASX Announcement dated 22 October 2025
2
E25 ASX Announcement dated 22 January 2025
3
E25 ASX Announcement dated 22 January 2025
4
E25 ASX Announcement dated 17 June 2025
5
E25 ASX Announcement dated 12 March 2025
6
E25 ASX Announcement dated 13 January 2025
7
E25 ASX Announcements dated 20 January 2025, 9 January and 26 June 2023
28 OCTOBER 2025 | ASX: E25 2
BUTCHERBIRD MANGANESE PROJECT, WA
Project Finance
During the quarter, Element 25 completed an AU$10 million share placement8
to fund expansion of its
Butcherbird Manganese Project in Western Australia.
The Placement followed the AU$50 million senior debt facility secured from Northern Australia
Infrastructure Facility (NAIF) for BBX, announced in June 20259
.
Element 25 plans to expand Butcherbird’s production capacity to 1.1 million tonnes per annum (Mtpa)
of manganese oxide concentrate10
. Butcherbird’s expansion will enable it to supply manganese
concentrate feedstock for Element 25’s planned battery grade, high purity manganese sulphate
monohydrate (HPMSM) processing facility which it plans to build in Louisiana, USA, as well as securing
concentrate sales to other customers.
Under the Placement, Element 25 issued 36,323,146 shares (13,461,906 under ASX Listing Rule 7.1
and 22,861,240 under ASX Listing Rule 7.1A) at a price of AU$0.28 per share, representing a 13.4%
discount to the 10-day volume weighted average price (VWAP) of AU$0.323/share and a 16.4% discount
to Element 25’s previous close price of AU$0.335/share.
The Placement settled on 19 September. Petra Capital was Sole Lead Manager and Sole Bookrunner to
the Offer.
A Feasibility Study for BBX updated in January 2025 estimated a capital cost of AU$64.8 million with a
pre-tax Net Present Value (NPV) of AU$561 million with a 96% pre-tax Internal Rate of Return (IRR),
generating an average of AU$70.5 million per year cashflow over a mine life of more than 18 years11
.
Engineering Design
In October, Element 25 announced the appointment of Perth-based Altris Engineering to lead BBX,
undertaking all detailed engineering design for the project12
.
8
E25 ASX Announcement dated 12 September 2025
9
E25 ASX Announcement dated 17 June 2025
10
E25 ASX Announcement dated 22 January 2025
11
E25 ASX Announcement dated 22 January 2025
12
E25 ASX Announcement dated 22 October 2025
28 OCTOBER 2025 | ASX: E25 3
About Altris Engineering
Altris is an engineering consultancy providing practical and innovative solutions to clients in the mineral
processing sector. The team combines multi-disciplinary expertise with extensive experience, having
previously delivered a range of recognised and technically challenging projects across the industry. Altris
supports projects from early concept through to operation, with a focus on constructability, cost-
effectiveness, and operability.
The company is committed to delivering efficient, high-quality outcomes that maximise value while
maintaining strong technical standards and a client-focused approach. The Altris team has delivered
multiple scoping, prefeasibility, and feasibility studies, and has led Engineering, Procurement and
Construction (EPC) and Engineering, Procurement and Construction Management (EPCM) project
execution for battery and critical minerals projects across multiple global jurisdictions.
With strong experience in project delivery, Altris is recognised for producing fit-for-purpose designs that
minimise capital expenditure while maintaining high standards of operability and safety.
Altris and Element 25 will form an integrated project team which will lead the development of the detailed
engineering design for the project as well as support services such as procurement, project
management, and construction support.
Element 25 is actively engaged with multiple counterparties in relation to other key commercial contracts
for BBX both in terms of construction and operations including offtake, construction, equipment
procurement, mining, ore haulage, port, camp services and the like.
HPMSM REFINERY PROJECT – LOUISIANA, USA
The Company plans to produce HPMSM from manganese ore sourced from its Butcherbird Project,
which will be shipped to the planned Louisiana site. Element 25 has developed an innovative, advanced
processing flowsheet to convert Butcherbird manganese concentrate into high purity manganese
sulphate monohydrate (HPMSM), a critical raw material for the manufacture of lithium-ion batteries. The
proprietary Element 25 flowsheet reduces energy consumption, virtually eliminates waste and delivers
the lowest reported carbon intensity HPMSM globally13
.
In January 2025, Element 25 announced formal awarding and signing of a Grant Agreement for
US$166 million (AU$268 million) in grant funding from the DoE under the MESC Battery Materials
Processing Grant Program14
. This will support construction of the proposed Louisiana refinery to bring
domestic production of a key critical battery raw material to mainland USA. The MESC grant forms a key
component of Element 25’s financing strategy, in addition to the US$115 million already committed by
offtake partners GM and Stellantis, and its execution team will now work to finalise the project schedule,
subject to grant finalisation.
13
E25 ASX Announcement dated 21 February 2023
14
E25 ASX Announcement dated 20 January 2025
28 OCTOBER 2025 | ASX: E25 4
HPMSM REFINERY PROJECT – TOKYO, JAPAN
In September 2024, Element 25 signed a non-binding Memorandum of Understanding with Nissan
Chemical Corporation and NC Tokyo Bay Corporation to complete a pre-feasibility study into a battery
grade HPMSM facility to be located at the existing NCTB site in Chiba prefecture, Japan15
. The potential
for a HPMSM facility to be built using the unique Element 25 flowsheet supplied with Butcherbird
manganese concentrate fits well with Element 25’s strategy of building multiple refineries to serve
various global markets.
As announced in April 2025, the parties completed a high-level scoping study, which examined a range
of factors, including permitting, logistics, reagent supply, labour, capital and operating costs. The Study
confirmed the potential feasibility of the Facility and identified no fatal flaws, and the parties have agreed
to proceed to a more detailed investigation16
.
Site investigation activities are ongoing and the parties have a targeted final investment decision date of
June 2026.
CORPORATE
2025 Annual Report
Element 25 released their Annual Report to Shareholders and the market for the
year ended 30 June 202517
.
In additional to the Company’s financial report for the year, the Company provided
an operational overview for the year and looks forward to welcoming shareholders to
the upcoming Annual General Meeting on 26 November 2025, the notice for which
has been issued18
.
ASX ADDITIONAL INFORMATION
The ASX Appendix 5B quarterly report covering the quarter is attached and lodged with this report.
In accordance with ASX Listing Rule 5.3.5, payments to the Company's related parties and associates
during the quarter totalled $154,000 comprising salary, directors’ fees, consulting fees, and
superannuation.
In accordance with ASX Listing Rule 5.3.1, payments relating to Mining Exploration for the quarter
totalled $65,000.
15
E25 ASX Announcement dated 3 September 2024
16
E25 ASX Announcement dated 2 April 2025
17
E25 ASX Announcement dated 25 September 2025
18
E25 ASX Announcement dated 20 October 2025
28 OCTOBER 2025 | ASX: E25 5
ABOUT ELEMENT 25
Element 25 is an ASX-listed company (ASX: E25) that operates the world-class 100%-owned
Butcherbird Manganese Project in Western Australia and is currently undertaking activities to expand
production to approximately 1.1Mtpa of medium-grade high silica manganese ore for use in traditional
and new energy markets19
.
Element 25 is also commercialising innovative proprietary technology to produce battery-grade high-
purity manganese sulphate monohydrate (HPMSM) for use in Electric Vehicle (EV) battery
manufacturing. The Company plans to build its first HPMSM refinery in Louisiana USA to produce raw
materials for the US EV market, in partnership with General Motors LLC (GM) and Stellantis N.V.
(Stellantis)20
. Element 25 aims to become an industry leading, world class, low-carbon battery materials
manufacturer.
The Louisiana refinery is planned as the first of several HPMSM facilities planned for development under
Element 25’s “Design One Build Many” commercialisation strategy which envisages a hub and spoke
model, with ore supplied from Element 25’s Butcherbird Mine in Western Australia to supply processing
facilities in key regional markets to supply HPMSM to the rapidly growing EV servicing key global
regions.
Company information, ASX announcements, investor presentations, corporate videos, and other investor
material in the Company’s projects can be viewed at: www.element25.com.au.
This announcement is authorised for market release by Element 25 Limited’s Board of Directors.
Justin Brown Media Inquiries:
Managing Director
Email: admin@e25.com.au
Phone: +61 (8) 6375 2525
Nathan Ryan
Email: nathan.ryan@nwrcommunications.com.au
Phone: +61 (0) 420 582 887
Competent Persons Statement
The Company confirms that in the case of Production Targets, all material assumptions underpinning the production target, or the forecast
financial information derived from a production target, in the market announcement dated 22 January 2025 continue to apply and have not
material changed. All estimates or Mineral Resources or Ore Reserves underpinning the production target have been prepared by a competent
person or persons s in accordance with the requirements of the JORC Code, Appendix 5A.
The Company confirms that in the case of Mineral Resource or Ore Reserves, all material assumptions and technical parameters underpinning
the estimates in the market announcements dated 29 October 2024 and 22 January 2025 continue to apply and have not materially changed.
The Company confirms that it is not aware of any new information or data that materially affects information included in previous
announcements, and all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially
changed.
Investor Relations Disclaimer
Certain Statements included in this announcement are forward-looking statements concerning Element 25 Limited and its subsidiaries (E25)
and its operations, economic performance, financial condition, plans and expectations. Without limiting the foregoing, statements including the
words “believes”, “anticipates”, “plans”, “expects”, “could”, “potential”, “should” and similar expressions are also forward-looking statements.
All forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual
events or results to differ from those expressed or implied, including, without limitation, business integration risks; uncertainty of production,
development plans and cost estimates, commodity price fluctuations; political or economic instability and regulatory changes; currency
fluctuations, the state of the capital markets, uncertainty in the measurement of mineral reserves and resource estimates, E25’s ability to attract
and retain qualified personnel and management, potential labour unrest, reclamation and closure requirements for mineral properties;
19
E25 ASX Release dated 22 January 2025
20
E25 ASX Releases dated 9 January 2023 and 26 June 2023
28 OCTOBER 2025 | ASX: E25 6
unpredictable risks and hazards related to the development and operation of a mine or mineral or mineral deposit or mineral processing facility
that are beyond E25’s control, the availability of capital to fund all of the Company’s projects and other risks and uncertainties.
You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. E25 cannot assure you
that actual events, performance or results will be consistent with these forward-looking statements, and management’s assumptions may prove
to be incorrect. E25’s forward-looking statements reflect current expectations regarding future events and operating performance and speak
only as of the date hereof and E25 does not assume any obligation to update forward-looking statements if circumstances or management’s
beliefs, expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place
undue reliance on forward-looking statements.
28 OCTOBER 2025 | ASX: E25 7
TENEMENT INFORMATION FOR QUARTERLY REPORT – 30 SEPTEMBER 2025
Tenement
reference
Location
Interest at
beginning of quarter
Acquired/
Disposed
Interest at end of
quarter
The
mining
tenements
held
at
the
end
of
the
quarter
and
their
location
E20/659 Eelya Hill WA 10% N/A 10%
E52/1529 Mt Padbury WA 100% (Note 1) N/A 100% (Note 1)
E52/2350 Butcher Bird WA 100% N/A 100%
E52/3606 Yanneri Bore WA 100% N/A 100%
E52/3706 Yanneri Pool WA 100% N/A 100%
E52/3735 Limestone Bore WA 100% N/A 100%
E52/3769 Kumarina WA 100% N/A 100%
E52/3779 Beyondie Bluff WA 100% N/A 100%
E52/3858 Yanneri Well WA 100% N/A 100%
E52/4064 Neds Gap WA 100% N/A 100%
E52/4149 Neds Gap WA 100% N/A 100%
E52/4358 Butcherbird North WA 100% N/A 100%
E52/4417 Weelarrana WA 100% N/A 100%
E52/4441 701 Mile WA 100% N/A 100%
L45/871 Wodgina WA 0% Acquired 100%
L52/211 Limestone Bore WA 100% N/A 100%
L52/215 Butcherbird East 1 WA 100% N/A 100%
L52/216 Butcherbird East 2 WA 100% N/A 100%
L52/217 Butcherbird East 3 WA 100% N/A 100%
L52/218 Butcherbird East 4 WA 100% N/A 100%
L52/220 Butcherbird East 5 WA 100% N/A 100%
L52/221 Butcherbird East 6 WA 100% N/A 100%
L52/225 Butcherbird East 7 WA 100% N/A 100%
L52/254 Butcherbird North WA 100% N/A 100%
L52/255 Butcherbird North WA 100% N/A 100%
L52/256 Butcherbird North WA 100% N/A 100%
L52/257 Butcherbird North WA 100% N/A 100%
L52/258 Butcherbird East WA 100% N/A 100%
L52/275 Butcherbird North WA 100% N/A 100%
L52/276 Butcherbird East WA 100% N/A 100%
M52/1074 Yaneri Ridge WA 100% N/A 100%
E57/1060 Victory Well WA 20% N/A 20%
E63/2027 Lake Johnston WA 100% N/A 100%
E63/2429 Lake Johnston WA 100% N/A 100%
Notes: (1) 100% interest held in all minerals other than iron ore and manganese.
Table 1: Tenement Information for Quarterly Report to 30 September 2025
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Element 25 Limited
ABN Quarter ended (“current quarter”)
46 119 711 929 30 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
63 63
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (217) (217)
(e) administration and corporate costs (382) (382)
1.3 Dividends received (see note 3) - -
1.4 Interest received 2 2
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other – Payment for HPMSM development - -
1.8 Other - Movement of cash previously
classified as non-restricted
- -
1.9 Net cash from / (used in) operating
activities
(534) (534)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements (65) (65)
(c) property, plant and equipment (1,118) (1,118)
(d) exploration & evaluation (3) (3)
(e) investments - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
(f) other non-current assets - -
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments 94 94
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(1,092) (1,092)
3. Cash flows from financing activities
10,170 10,170
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(460) (460)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (lease payments) (52) (52)
3.10 Net cash from / (used in) financing
activities
9,658 9,658
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
2,162 2,162
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(534) (534)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(1,092) (1,092)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
9,658 9,658
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
(4) (4)
4.6 Cash and cash equivalents at end of
period
10,190 10,190
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 10,190 10,190
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
10,190 10,190
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
154
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
N/A
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (534)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(3)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (537)
8.4 Cash and cash equivalents at quarter end (item 4.6) 10,190
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 10,190
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
18.97
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
N/A
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
N/A
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 28 October 2025
‘Signed electronically’
Authorised by: Board of Directors
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
6. By the Company lodging this Appendix 5B, the Managing Director and CFO declare that the Appendix 5B for the relevant
quarter:
▪ presents a true and fair view, in all material respects, of the cashflows of the Company for the relevant quarter and
is in accordance with relevant accounting standards;
▪ the statement given above is founded on a sound system of risk management and internal compliance and control
which implements the policies adopted by the Board; and
▪ the Company’s financial records have been properly maintained and the Company’s risk management and internal
compliance and control system is operating efficiently and effectively in all material respects.