Element 25 Limited (E25 or Company) (ASX: E25; OTCQX: ELMTF) is pleased to advise that it has entered into a non-binding
Memorandum of Understanding (MOU) with Nissan Chemical Corporation (NC) and NC Tokyo Bay Corporation (NCTB) to
complete a Feasibility Study (FS) into a battery grade High Purity Manganese Sulphate Monohydrate (HPMSM) facility to be
located at the existing NCTB site in Chiba prefecture, Japan (Facility).
Highlights:
A number of key synergies can be realised by co-locating E25’s low-emission1 technology and process at NCTB, including:
•
NCTB operates a sulphuric acid plant at the Chiba production facility, which can supply acid to the proposed project.
•
NCTB has substantial ancillary infrastructure, utilities and services that can be provided to the HPMSM project.
•
NCTB is located in Tokyo Bay and has private berths that can handle both liquid and bulk cargo, providing important
logistics solutions.
Element 25 Managing Director Justin Brown said: “We are excited to work with a highly respected company like Nissan
Chemical Corporation and NC Tokyo Bay Corporation to study the opportunity to locate a future plant in Chiba Prefecture.
The synergies of co-location are significant for both parties and the utilisation of existing industrial land and facilities fits
perfectly with our vision to have a minimal ESG impact. This is of course possible thanks to our unique flowsheet which
virtually eliminates solid waste. Japan and Australia have a long history of trade and share common goals, and this would
be a fantastic opportunity to continue and strengthen those ties into the future.”
Element 25 Limited
Level 1, Building B, Garden Office Park,
355 Scarborough Beach Road,
Osborne Park WA 6017
ABN: 46 119 711 929
T: +61 8 6375 2525
E: admin@e25.com.au
W: element25.com.au
1
The MoU outlines initial terms between E25, NC and NCTB to evaluate the potential to jointly develop the Facility to be located
on existing industrial land at the NCTB Chiba site, with final details of the plan including timeframe and funding, to be
determined once a feasibility study has been completed.
The MoU outlines several key steps including the identification of potential engineering, procurement and construction (EPC)
contracts, the completion of Scoping and Feasibility Studies, the finalisation of offtake agreements and the securing of sufficient
project finance to reach a targeted final investment decision (FID) date of September 2026.
THE PROPOSED CHIBA SITE
The NCTB site in Chiba offers some unique opportunities for co-location of an HPMSM facility. In addition to the production
sulphuric acid at the Chiba site, NC also produces sulphuric acid at both their Aichi and Toyama prefecture facilities, as well as
other key reagents at the Toyama prefecture facility, all key inputs into the E25 process.
NTCB also generates CO2-free power via an established co-generation unit attached to the acid plant. Both power and steam can
be supplied to E25 without the requirement for significant additional capital works. All other required utilities, including natural
gas, water and sewer services are also available at the NCTB site, in addition to substantial ancillary infrastructure and services.
HPMSM IN JAPAN
Automotive Industry
Japan has a long and proud history in automotive excellence including the production of hybrid and Electric Vehicles (EVs). A
number of leading EV battery and precursor manufacturers are also based in Japan. Japan, like many other countries, has
designated manganese as a critical mineral and has legislated incentives to establish battery related industries in Japan.
Manganese is becoming an increasingly important input into EV batteries as the technology shifts away from nickel-rich
chemistries to high manganese and LMFP (manganese-doped LFP) cathodes. This transition is expected to generate increased
demand for high purity manganese chemicals for use in the production of these batteries as the EV transition accelerates.
ABOUT NISSAN CHEMICAL AND NC TOKYO BAY
Nissan Chemical Corporation is developing new products and businesses by utilising its core technologies as a chemical
company with a corporate vision of becoming a corporate group that “contributes to the protection of the global environment
and the existence/ development of humanity, offering the value sought by society.”
For more details, please visit https://www.nissanchem.co.jp/
1
Reference: Company ASX Release dated 21 February 2023
ANNOUNCEMENT | 21 May 2024 | ASX: E25
ASX: E25
3 SEP 2024
2
NC Tokyo Bay Corporation was originally established in 1967 as Nippon Phosphoric Acid Co. to contribute to the domestic
agricultural food production industry. From then, NCTB has been producing sulphuric acid, phosphoric acid and its derivatives
with unique original processes and leads the chemical fertiliser industry in Japan. NCTB became a wholly owned subsidiary
company of NC on April 1st, 2023.
ABOUT ELEMENT 25
Element 25 is an ASX-listed company (ASX: E25) that operates the world-class 100%-owned Butcherbird Manganese Project in
Western Australia and is currently undertaking activities to expand production to approximately 1.1Mtpa of medium-grade high
silica manganese ore for use in traditional and new energy markets 2.
E25 is also commercialising innovative proprietary technology to produce battery-grade high-purity manganese sulphate
monohydrate (HPMSM) for use in Electric Vehicle (EV) battery manufacturing. The Company plans to build its first HPMSM
refinery in Louisiana, USA, to produce raw materials for the US EV market, in partnership with General Motors LLC (GM) and
Stellantis N.V. (Stellantis) 3. E25 aims to become an industry-leading, world-class, low-carbon battery materials manufacturer.
The Louisiana refinery is planned as the first of several HPMSM facilities planned for development under E25’s “Design One Build
Many” commercialisation strategy which envisages a hub and spoke model, with ore supplied from E25’s Butcherbird Mine in
Western Australia to supply processing facilities in key regional markets to supply HPMSM to the rapidly growing EV servicing key
global regions.
The addition of a potential HPMSM refinery site in Chiba prefecture in Japan in partnership with Nissan Chemical is another
exciting step forward in realising the Company’s strategic plan.
Company information, ASX announcements, investor presentations, corporate videos, and other investor material in the
Company’s projects can be viewed at: www.element25.com.au.
This announcement is authorised for market release by Element 25 Limited’s Board of Directors.
Justin Brown
Media Inquiries:
Managing Director
Email: admin@e25.com.au
Phone: +61 (8) 6375 2525
Nathan Ryan
Email: nathan.ryan@nwrcommunications.com.au
Phone: +61 (0) 420 582 887
Competent Persons Statement
The company confirms that in the case of estimates of Mineral Resource or Ore Reserves, all material assumptions and technical parameters underpinning the
estimates in the market announcement dated 29 September 2023 continue to apply and have not materially changed. The Company confirms that it is not aware
of any new information or data that materially affects information included in previous announcements, and all material assumptions and technical parameters
underpinning the estimates continue to apply and have not materially changed.
2
Reference: Company ASX Release dated 23 January 2024
3
References: Company ASX Releases dated 9 January 2023 and 26 June 2023
ANNOUNCEMENT | 21 May 2024 | ASX: E25
ASX: E25
3 SEP 2024
3
Investor Relations Disclaimer
Certain Statements included in this announcement are forward-looking statements concerning Element 25 Limited and its subsidiaries (E25) and its operations,
economic performance, financial condition, plans and expectations. Without limiting the foregoing, statements including the words “believes”, “anticipates”,
“plans”, “expects”, “could”, “potential”, “should” and similar expressions are also forward-looking statements.
All forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to
differ from those expressed or implied, including, without limitation, business integration risks; uncertainty of production, development plans and cost
estimates, commodity price fluctuations; political or economic instability and regulatory changes; currency fluctuations, the state of the capital markets,
uncertainty in the measurement of mineral reserves and resource estimates, E25’s ability to attract and retain qualified personnel and management, potential
labour unrest, reclamation and closure requirements for mineral properties; unpredictable risks and hazards related to the development and operation of a
mine or mineral or mineral deposit or mineral processing facility that are beyond E25’s control, the availability of capital to fund all of the Company’s projects
and other risks and uncertainties.
You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. E25 cannot assure you that actual events,
performance or results will be consistent with these forward-looking statements, and management’s assumptions may prove to be incorrect. E25’s forwardlooking statements reflect current expectations regarding future events and operating performance and speak only as of the date hereof and E25 does not
assume any obligation to update forward-looking statements if circumstances or management’s beliefs, expectations or opinions should change other than as
required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking statements.
ANNOUNCEMENT | 21 May 2024 | ASX: E25
ASX: E25
3 SEP 2024
4
Share your feedback
Discover