DECEMBER 2025 QUARTERLY REPORT
QUARTERLY HIGHLIGHTS
Butcherbird Manganese Ore Operations – Western Australia
• Lead Engineer Altris Engineering commenced engineering design activities on Butcherbird
Expansion Project (BBX) as an Integrated Project Team (IPT), in collaboration with E25 engineers1
.
• Engineering detailed design well advanced in preparation for construction/build phase of BBX.
• Process improvement studies targeting potential cost savings and execution flexibility options.
• Mining services contract tender approaching final selection; key processing equipment procured2
.
• Offtake discussions well advanced with term sheets under final review.
• AU$10 million placement3
completed and AU$50 million senior debt facility secured from
Northern Australia Infrastructure Facility (NAIF)4
.
• Multiple term sheets under negotiation to secure balance of funds for BBX.
• BBX aims to expand production to 1.1Mtpta of manganese concentrate per annum5
.
• Butcherbird Ore Reserve of 101.4Mt at 10.4% Mn for 10.54Mt contained manganese underpins a
robust, >18-year LOM operation6
.
• Butcherbird manganese concentrate will also supply Element 25’s planned lithium-ion battery grade
high-purity manganese sulphate monohydrate (HPMSM) production facility in Louisiana, USA.
Battery Grade High Purity Manganese (HPMSM)
• Element 25 is working to finalise project financing for its planned Louisiana HPMSM refinery.
• Louisiana financing comprises US$166 million in grant funding from the US Department of Energy,
US$85 million in senior debt from General Motors LLC and US$30 million from Stellantis N.V. as
equity and offtake prepayment7
.
1
E25 ASX Announcement dated 22 October 2025
2
E25 ASX Announcement dated 25 November 2025
3
E25 ASX Announcement dated 12 September 2025
4
E25 ASX Announcement dated 17 June 2025
5
E25 ASX Announcement dated 22 January 2025
6
E25 ASX Announcement dated 22 January 2025
7
E25 ASX Announcements dated 20 January 2025, 9 January and 26 June 2023
28 JANUARY 2026 | ASX: E25 2
BUTCHERBIRD MANGANESE PROJECT, WA
During the quarter, Element 25 advanced its Butcherbird Expansion Project (BBX/Project) towards
construction. BBX aims to increase Butcherbird’s production to 1.1Mtpa of manganese concentrate8
.
The Company plans to expand production capacity at the Project to supply manganese concentrate to
traditional steel markets and to supply feedstock for its own proposed battery grade, high purity
manganese sulphate monohydrate (HPMSM) processing facility planned to be built in Louisiana, USA.
Figure 1.Butcherbird Expansion Project Feasibility Summary Results9
.
Project Finance
In June 2025, the Northern
Australia Infrastructure Facility
(NAIF) approved a senior debt
facility of up to AU$50 million10
,
including AU$42.5 million in
senior debt and a AU$7.5 million
cost overrun facility, to support
BBX.
The Company has also completed
an equity raising via a $10 million
share placement at $0.28 per
share, led by Petra Capital to
accelerate the Butcherbird
Expansion Project in Western
Australia11
.
8
E25 ASX Announcement dated 22 January 2025
9
E25 ASX Announcement dated 22 January 2025
10
E25 ASX Announcement dated 17 June 2025
11
E25 ASX Announcement dated 12 September 2025
28 JANUARY 2026 | ASX: E25 3
This funding is being deployed in accordance with the BBX budget, principally to advance detailed
engineering activities and secure key long lead equipment items in accordance with the project schedule.
The Company is currently negotiating with a number of counterparties with respect to securing the
balance of funding for BBX.
Project Engineering
Detailed design has commenced with Altris Engineering (Altris) appointed as lead engineering consultant
in October 202512
.
Element 25 and Altris are implementing an Integrated Project Team (IPT)
methodology, with Element 25 engineering personnel embedded and located
with the Altris team to ensure collaboration and information sharing are
maximised.
Early process and cost improvement studies have
commenced with benefits being identified relating to
cost-saving and execution flexibility opportunities.
Altris continues to expand its team in line with the
ramp up of project resourcing requirements as the
project advances towards commencement of
construction.
The IPT is currently focussed on refinement and
further definition of the core engineering detail
including trade-off studies, site layout, detailed cost
range analysis and a review of pricing and quantities
with the previous project cost estimate as the
baseline.
Long lead items are being progressed in line with key
Project milestones.
Commercial Contracts
Mining Services Contract13
The Element 25 Procurement Team has materially advanced the tender process to secure a suitable
mining services contractor to support the planned mining operations at the expanded Butcherbird
Manganese Mine.
The team have engaged with, and assessed several rounds of clarifications from, participating contactors,
evaluating each proposal based on key selection criteria including contractor experience, capability and
value for money.
Applicants have been short-listed and the tender assessment process continues.
12
E25 ASX Announcement dated 22 October 2025
13
E25 ASX Announcement dated 25 November 2025
28 JANUARY 2026 | ASX: E25 4
Crushing and Mineral Sizer Solutions13
Element 25 has undertaken a detailed assessment of the crushing requirements for
the expanded operations at Butcherbird, extensively evaluating the design
requirements of the mineral crusher and sizers, including the associated equipment
and circuit design to establish the most cost effective and efficient design for this
capability.
Mineral sizers from MMD have been selected as the preferred equipment for this
application, and a procurement contract signed with MMD to supply both the primary and secondary sizer
units along with critical spares and commitment for commissioning support and post-commissioning
maintenance services.
Equipment delivery is scheduled to align with the overall project plan and will be closely monitored.
Logwasher13
The logwasher is a large-scale scrubbing unit with two counter‑rotating
paddle shafts that scrub the feed while an opposing water flow
separates liberated fines discharging clean product at the upper outlet
of an inclined trough. This is a key step on the process flowsheet for BBX where the process aims to
liberate the lump manganese product for the intercalated lateritic clay material.
E25 has entered into a supply contract with KISA Gmbh to supply a logwasher unit with a nominal 600 t/h
federate and max 11° gradient. The unit has been carefully selected for the proposed BBX use. The
logwasher has been manufactured and awaits transportation to the Project site in accordance with the
current schedule.
Logistics13
Element 25 maintains a close partnership with REGROUP, the
logistics service provider who supported the Stage 1 operations at
Butcherbird, providing road haulage services for manganese concentrate from the Butcherbird mine site.
The road haulage agreement for the BBX Project is currently being negotiated with REGROUP to provide
for increased volumes as well as more efficient material movement through revised equipment selection
and scheduling and improved analytics as well as a broader review of contract terms.
As the largest cost of the proposed operation, both parties are working together to maximise efficiencies
and reduce transportation costs, with identifying opportunities for continuous improvement being a key
priority.
As per the Stage 1 operations, the Company will utilise the Utah Point common user facilities to export
manganese concentrate cargos, with adjustments to the logistics plan being developed to accommodate
the larger volumes and optimise the overall transport costs.
28 JANUARY 2026 | ASX: E25 5
Offtake13
Discussions remain ongoing with a number of key counterparties to finalise offtake for the increased
production from the BBX Project.
The manganese concentrate product produced from the Butcherbird Mine has a unique set of properties
which make it attractive to smelters, particularly in the silico-manganese market. These attributes include
a high silica content (>20%), low levels of deleterious contaminants such as phosphorous, heavy metals
and arsenic, a suitable iron-manganese ratio and a physical competency which minimises fragmentation
and fines generation which can be important for transport and in smelting operations.
The Company continues to refine the terms of the offtake under these negotiations and plans to finalise
the preferred offtake partner and commercial terms as soon as practicable.
Core Operating Systems13
The Core Operating and Business Intelligence Systems are key for the success of both the BBX Project
and the long-term operations of the Butcherbird Manganese Mine.
Element 25’s procurement team is working with selected consultants to develop the solution design
document and define the scope of work for the core systems and associated infrastructure, including the
Company’s Enterprise Resource Planning (ERP) system.
These systems will provide the foundation for the Company’s vision to deliver a highly granular digital
business intelligence system with detailed visibility on all operational elements form pit-to-port to support
ongoing efficiency improvements, optimise product quality and reduce costs.
As a long-term operation, it is critical that the Butcherbird Mine utilises a future facing technology strategy
to maintain its competitive edge as the world moves towards the expanded adoption of real-time data
driven automated decision making to maximise performance across all key metrics including safety,
performance, and profitability.
Permitting and Approvals13
The Element 25 Butcherbird Project is fully approved under the
Western Australian Regulatory Framework14
to construct the
1.1Mpta15
processing plant.
The Company has maintained all regulatory approvals including
the Environmental Licence, since the Stage 1 plant commenced
in 2021 through ongoing compliance and regular statutory
reporting. The water abstraction licence, heritage clearances,
native title and pastoral agreements are in place and continue to
remain applicable.
An established Tailings Storage Facility (TSF) is fully approved to support the storage requirements of the
expansion for the first six years of operations and subsequent staged lifts and engineering designs have
been completed to sustain the current Reserve life of the project.
14
E25 ASX Released dated 12 March 2025
15
E25 ASX Released dated 22 January 2025
28 JANUARY 2026 | ASX: E25 6
To reflect the expanded processing plant footprint and increase in throughput, the Mining Proposal and
Mine Closure Plan were updated and approved in December 2024 by the Department of Mines,
Petroleum and Exploration (DMPE formerly DMIRS) 16
. The Works Approval for the construction of the
expanded processing facility project was approved by the WA Department of Environment and Regulation
(DWER) in March 202517
.
Project Schedule13
The schedule for BBX is continually updated to accommodate commercial contracting, supplier
engagement, completed works, and alignment with the project plan, including activities that are
forecasted, planned, commenced and achieved.
The work breakdown structure (WBS) is comprehensive, with significant interdependencies among tasks
and activities. The team remains dedicated to maintaining project timelines and budgetary objectives.
Figure 1 provides a high-level overview of the current target schedule for the BBX Project.
The schedule remains subject to a number of key dependencies including achieving project financial
close, completion of detailed engineering, procurement of key equipment and finalising the construction
contract(s) in accordance with the planned key dates.
The schedule continues to be monitored as the Company progresses BBX.
Figure 2.Butcherbird Expansion Project Timeline Summary
HPMSM REFINERY PROJECT – LOUISIANA, USA
The Company plans to produce HPMSM from manganese ore sourced from its Butcherbird Project, which
will be shipped to the planned Louisiana site. Element 25 has developed an innovative, advanced
processing flowsheet to convert Butcherbird manganese concentrate into HPMSM, a critical raw material
for the manufacture of lithium-ion batteries. The proprietary flowsheet reduces energy consumption,
virtually eliminates waste and delivers the lowest reported carbon intensity HPMSM globally18
.
16
E25 ASX Release dated 13 January 2025
17
E25 ASX Release dated 12 March 2025
18
E25 ASX Announcement dated 21 February 2023
28 JANUARY 2026 | ASX: E25 7
In January 2025, Element 25 announced formal awarding and signing of a Grant Agreement for
US$166 million (AU$268 million) in grant funding from the DoE under the MESC Battery Materials
Processing Grant Program19
. This will support construction of Element 25’s proposed battery-grade
HPMSM facility in Louisiana, USA, which plans to bring domestic production of a key critical battery raw
material to the USA. The grant forms a key component of Element 25’s financing strategy, in addition to
the US$115 million already committed by offtake partners GM and Stellantis, and its execution team will
now work to finalise the project schedule, subject to grant finalisation.
CORPORATE
Director Retirement
In December 2025, the Company announced the retirement of Rudolph (Fanie) van Jaarsveld from its
Board of Directors and his position as a Non-Executive Director, effective 1 January 202620
.
Fanie will remain as a consultant to the Company and will continue to bring his valuable operational
experience to the delivery of the Butcherbird Expansion Project as required.
Standby Equity Facility – Acuity Capital
As part of its ongoing capital management strategy, the Company signed an At-the-Market Subscription
Agreement (ATM) with Acuity Capital Investment Management Pty Ltd (Acuity Capital) to provide
Element 25 with up to $30 million of standby equity capital over the coming 36 month period. This standby
facility may be used to fund the expansion of the Butcherbird Project, working capital and to fund
Company growth.
Under the ATM, Element 25 has full discretion as to whether or not to utilise the ATM, the maximum
number of shares to be issued, the minimum issue price of shares and the timing of each subscription
(if any). There are no requirements on Element 25 to utilise the ATM and the Company may terminate the
ATM at any time, without cost or penalty.
Acuity Capital and the ATM do not place any restrictions on Element 25 raising capital through other
methods. If Element 25 does decide to utilise the ATM, it is able to set a floor price (at its sole discretion)
and the final issue price will be calculated as the greater of that floor price set by Element 25 and up to a
10% discount to a Volume Weighted Average Price (VWAP) over a period of Element 25's choosing
(again, at the sole discretion of Element 25).
As security for the ATM, the Company has an existing placement 9,500,000 fully paid ordinary ASX:E25
shares to Acuity Capital at nil cash consideration. Upon termination or maturity of the ATM, Element 25
may buy back (and cancel) the shares placed as security for nil cash consideration (subject to
shareholder approval21
.
19
E25 ASX Announcement dated 20 January 2025
20
E25 ASX Announcement dated 19 December 2025
21
E25 ASX Announcement dated 27 January 2026
28 JANUARY 2026 | ASX: E25 8
Annual General Meeting
The Company held its Annual General Meeting (AGM) on 26 November 2025, providing shareholders
with the opportunity to engage directly with the Board and senior management. Results of the AGM were
published on the Company’s website22
.
ASX ADDITIONAL INFORMATION
The ASX Appendix 5B quarterly report covering the quarter is attached and lodged with this report.
In accordance with ASX Listing Rule 5.3.5, payments to the Company's related parties and associates
during the quarter totalled $154,000, comprising salary, directors’ fees, consulting fees, and
superannuation.
In accordance with ASX Listing Rule 5.3.1, payments relating to Mining Exploration for the quarter totalled
$112,000.
ABOUT ELEMENT 25
Element 25 is an ASX-listed company (ASX: E25) that operates the world-class 100%-owned Butcherbird
Manganese Project in Western Australia and is currently undertaking activities to expand production to
approximately 1.1Mtpa of medium-grade high silica manganese ore for use in traditional and new energy
markets23
.
E25 is also commercialising innovative proprietary technology to produce battery-grade high-purity
manganese sulphate monohydrate (HPMSM) for use in Electric Vehicle (EV) battery manufacturing. The
Company plans to build its first HPMSM refinery in Louisiana USA to produce raw materials for the US EV
market, in partnership with General Motors LLC (GM) and Stellantis N.V. (Stellantis)24
. E25 aims to
become an industry leading, world class, low-carbon battery materials manufacturer.
The Louisiana refinery is planned as the first of several HPMSM facilities planned for development under
E25’s “Design One Build Many” commercialisation strategy which envisages a hub and spoke model, with
ore supplied from E25’s Butcherbird Mine in Western Australia to supply processing facilities in key
regional markets to supply HPMSM to the rapidly growing EV servicing key global regions.
Company information, ASX announcements, investor presentations, corporate videos, and other investor
material in the Company’s projects can be viewed at: www.element25.com.au.
This announcement is authorised for market release by Element 25 Limited’s Board of Directors.
Justin Brown Media Inquiries:
Managing Director
Email: admin@e25.com.au
Phone: +61 (8) 6375 2525
Nathan Ryan
Email: nathan.ryan@nwrcommunications.com.au
Phone: +61 (0) 420 582 887
Competent Persons Statement
The Company confirms that in the case of Production Targets, all material assumptions underpinning the production target, or the forecast
financial information derived from a production target, in the market announcement dated 22 January 2025 continue to apply and have not
22
E25 ASX Announcement dated 26 November 2025
23
E25 ASX Release dated 22 January 2025
24
E25 ASX Releases dated 9 January 2023 and 26 June 2023
28 JANUARY 2026 | ASX: E25 9
material changed. All estimates or Mineral Resources or Ore Reserves underpinning the production target have been prepared by a competent
person or persons s in accordance with the requirements of the JORC Code, Appendix 5A.
The Company confirms that in the case of Mineral Resource or Ore Reserves, all material assumptions and technical parameters underpinning
the estimates in the market announcements dated 29 October 2024 and 22 January 2025 continue to apply and have not materially changed.
The Company confirms that it is not aware of any new information or data that materially affects information included in previous announcements,
and all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
Investor Relations Disclaimer
Certain Statements included in this announcement are forward-looking statements concerning Element 25 Limited and its subsidiaries (E25) and
its operations, economic performance, financial condition, plans and expectations. Without limiting the foregoing, statements including the words
“believes”, “anticipates”, “plans”, “expects”, “could”, “potential”, “should” and similar expressions are also forward-looking statements.
All forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events
or results to differ from those expressed or implied, including, without limitation, business integration risks; uncertainty of production, development
plans and cost estimates, commodity price fluctuations; political or economic instability and regulatory changes; currency fluctuations, the state of
the capital markets, uncertainty in the measurement of mineral reserves and resource estimates, E25’s ability to attract and retain qualified
personnel and management, potential labour unrest, reclamation and closure requirements for mineral properties; unpredictable risks and
hazards related to the development and operation of a mine or mineral or mineral deposit or mineral processing facility that are beyond E25’s
control, the availability of capital to fund all of the Company’s projects and other risks and uncertainties.
You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. E25 cannot assure you that
actual events, performance or results will be consistent with these forward-looking statements, and management’s assumptions may prove to be
incorrect. E25’s forward-looking statements reflect current expectations regarding future events and operating performance and speak only as of
the date hereof and E25 does not assume any obligation to update forward-looking statements if circumstances or management’s beliefs,
expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue
reliance on forward-looking statements.
28 JANUARY 2026 | ASX: E25 10
TENEMENT INFORMATION FOR QUARTERLY REPORT
31 December 2025
Tenement
reference
Location
Interest at beginning
of quarter
Acquired/
Disposed
Interest at end of
quarter
The
mining
tenements
held
at
the
end
of
the
quarter
and
their
location
E20/659 Eelya Hill WA 10% N/A 10%
E52/1529 Mt Padbury WA 100% (Note 1) N/A 100% (Note 1)
E52/2350 Butcher Bird WA 100% N/A 100%
E52/3606 Yanneri Bore WA 100% N/A 100%
E52/3706 Yanneri Pool WA 100% N/A 100%
E52/3735 Limestone Bore WA 100% N/A 100%
E52/3769 Kumarina WA 100% N/A 100%
E52/3779 Beyondie Bluff WA 100% N/A 100%
E52/3858 Yanneri Well WA 100% N/A 100%
E52/4064 Neds Gap WA 100% N/A 100%
E52/4149 Neds Gap WA 100% N/A 100%
E52/4358 Butcherbird North WA 100% N/A 100%
E52/4417 Weelarrana WA 100% N/A 100%
E52/4441 701 Mile WA 100% N/A 100%
L45/871 Wodgina WA 100% N/A 100%
L52/211 Limestone Bore WA 100% N/A 100%
L52/215 Butcherbird East 1 WA 100% N/A 100%
L52/216 Butcherbird East 2 WA 100% N/A 100%
L52/217 Butcherbird East 3 WA 100% N/A 100%
L52/218 Butcherbird East 4 WA 100% N/A 100%
L52/220 Butcherbird East 5 WA 100% N/A 100%
L52/221 Butcherbird East 6 WA 100% N/A 100%
L52/225 Butcherbird East 7 WA 100% N/A 100%
L52/254 Butcherbird North WA 100% N/A 100%
L52/255 Butcherbird North WA 100% N/A 100%
L52/256 Butcherbird North WA 100% N/A 100%
L52/257 Butcherbird North WA 100% N/A 100%
L52/258 Butcherbird East WA 100% Disposed 0%
L52/275 Butcherbird North WA 100% N/A 100%
L52/276 Butcherbird East WA 100% N/A 100%
M52/1074 Yaneri Ridge WA 100% N/A 100%
E57/1060 Victory Well WA 20% N/A 20%
E63/2027 Lake Johnston WA 100% N/A 100%
E63/2429 Lake Johnston WA 100% N/A 100%
Notes: (1) 100% interest held in all minerals other than iron ore and manganese.
Table 1: Tenement Information for Quarterly Report to 31 December 2025
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Element 25 Limited
ABN Quarter ended (“current quarter”)
46 119 711 929 31 December 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
1. Cash flows from operating activities
- 63
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (214) (430)
(e) administration and corporate costs (772) (1,154)
1.3 Dividends received (see note 3) - -
1.4 Interest received 45 47
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other – Payment for HPMSM development - -
1.8 Other - Movement of cash previously
classified as non-restricted
- -
1.9 Net cash from / (used in) operating
activities
(941) (1,474)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements (112) (177)
(c) property, plant and equipment (1,305) (2,423)
(d) exploration & evaluation (6) (9)
(e) investments - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
(f) other non-current assets - -
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - 94
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(1,423) (2,515)
3. Cash flows from financing activities
- 10,170
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- (460)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (lease payments) (53) (105)
3.10 Net cash from / (used in) financing
activities
(53) 9,605
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
10,191 2,162
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(941) (1,474)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(1,423) (2,515)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(53) 9,605
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- (4)
4.6 Cash and cash equivalents at end of
period
7,774 7,774
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 7,774 10,190
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
7,774 10,190
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
154
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
N/A
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (941)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(6)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (947)
8.4 Cash and cash equivalents at quarter end (item 4.6) 7,774
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 7,774
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
8,21
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
N/A
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
N/A
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of th
Share your feedback
Discover