E25 Presents to Clean Energy Metals Investor Conference
Released
Released
Announcement PDF
Element 25 Limited
Investor Update
Building a World-Class Battery Grade Manganese business
Clean Energy Metals Virtual Investor Conference August 2023
ASX:E25
Disclaimer
This presentation contains only a brief overview of Element 25 Limited and its associated entities (“Element 25") and their respective activities
and operations. The contents of this presentation, including matters relating to the geology of Element 25's projects, may rely on various
assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any
independent verification.
This presentation contains multiple forward-looking statements. Known and unknown risks and uncertainties, and factors outside of Element
25’s control, may cause the actual results, performance and achievements of Element 25 to differ materially from those expressed or implied in
this presentation.
To the maximum extent permitted by law, Element 25 does not warrant the accuracy, currency or completeness of the information in this
presentation, nor the future performance of Element 25, and will not be responsible for any loss or damage arising from the use of the
information.
The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and
potential investors and shareholders should seek independent advice before making any investment decision in regard to Element 25 or its
activities.
Corporate Summary
ASX Ticker:
E25
Introduction:
Issued Shares:
218M
Share Price:
A$0.43
Market Cap:
A$94M
Debt:
Nil
Growing the world class Butcherbird
Manganese Mine in Western
Australia to produce high quality
manganese oxide concentrate
and ethical supply of battery grade
High Purity Manganese Sulphate
Monohydrate (HPMSM) products to
our offtake partners General Motors
(GM) and Stellantis for electric
vehicle (EV) batteries.
Reference: www.asx.com.au
Reference: Company Release dated 26 June 2023
-3-
Experienced Owners Team
BOARD OF DIRECTORS
Experienced Board &
Management
Seamus Cornelius
Chairman
Lawyer
Justin Brown
Managing Director
Geologist
John Ribbons
Non-Executive Director
CPA
Fanie van Jaarsveld
Non-Executive Director
Analytical Chemist
Sam Lancuba
Non-Executive Director
Chemical Engineer
Sias Jordaan
VP Marketing & Logistics
Accountant
Doug Flanagan
COO (HPMSM)
Mechatronics Engineer
Ian Huitson
Study Manager
Mining Engineer
PROJECT DEVELOPMENT AND OPERATIONS TEAM
Michael Jordon
Chief Financial Officer
CPA
Neil Graham
VP Battery Materials
Chemical Engineer
-4-
Gideon van Wyk
GM Manganese Ore Bus.
Mechanical Engineer
Clint Moxham
GM Operations.
Mining Engineer/Geol.
Our Strategic Vision…
Stage 1
365Kt per annum
Pilot plant in production, preparing
expansion plan to full scale plant
Stage 2
1 Mt per annum concentrate
Stage 3
Battery Grade MnSO4 (HPMSM)
Engineering design and costing in progress
using DMS option
Strong OEM support –signed with General Motors &
Stellantis for offtake and financing
Stage 4
MnSO4 Expansion
Long term - multiple HPMSM
modules globally
1 year plan
2 year plan
5 year plan
Cashflow
Low capital cost, rapid start up to
establish E25 as a producer while
minimising dilution.
Expansion
The Prize
Improved resource utilisation,
reduction in unit operating costs,
increased operating cash.
Position E25 as a globally
dominant producer of high purity,
sustainable HPMSM.
-5-
Zero Carbon Manganese™
Best in class, zero carbon, ethically
produced, scalable HPMSM for
electric vehicle batteries.
Traditional Manganese Alloys & Critical Battery Raw Material
HPMSM - EV FUEL
Mn ALLOYS
Used in steel, alloys and
aluminium products.
High silica concentrate
suitable for Si-Mn alloys
Global demand grows in
line with steel consumption
A key raw material
for Electric Vehicle (EV) Batteries
E25
Manganese
Concentrate
Australian location close
to Asian markets
New approach to improve
HPMSM ESG credentials
Strong demand growth linked to
the rapid transition to
EV mobility
E25 process offers key
advantages
-6-
Large long mine life manganese concentrate operation
100% E25
owned,
long term
tenure.
E52/2350
M52/1074
Granted Mining Lease
Measured & Indicated
Simple Logistics
Resources are the basis
for the 42-year Base Case
-7-
Very simple geology equals low-cost, low impact manganese units
Classification
Tonnes (Mt)
Mn (%)
Contained Mn (Mt)
Resource
263
10.0
20.8
Reserve
50.6
10.3
5.22
RESOURCE GROWTH POTENTIAL
•
Enough resource base for multidecade long expansion pathway.
•
Can produce concentrate, battery
grade HPMSM and EMM without
resource limitation.
ENVIRONMENTALLY BENIGN
OPERATION
-8-
•
Ore from surface
•
No explosives required
•
No waste water
•
One reagent – water
•
Extremely low levels of contaminants
Stage 1: Project Delivery Complete – Engineering Optimisation Progressing
Process Water
Storage
Tails Storage
ROM Stocks
Main Access
Road
Processing
Plant
Ore Stockpiles
Feedstock for
HPMSM
conversion
-9-
Our Goal – Zero Carbon High Purity Manganese…
Stage 1
First production of manganese
concentrate to sell to manganese
alloy manufacturers
Multi-stage
growth
potential
Stage 2
Expansion of the concentrate
production to produce manganese
feedstock to convert to MnSO4
Stage 3
Establishing a conversion facility to
convert the concentrate to battery
grade HPMSM with renewable energy
New Energy Vehicle (NEV) Demand Growing Strongly
Umicore chemistries addres
More vehicles
equals more batteries!
of total
Light-duty
EV CAM d
Global CAM
demand (GWh)
LDV only –
Chemistry split
2,400
~25%
CAGR
1,300
~75%
400
Mn
2022
~25%
2026
NMC/NCA, Manganese-rich
Reference: McKinsey & Company: - Electric vehicles: The next growth engine in chemicals, 2023
- 11 -
2030
LF(M)P
U
a
m
d
to
d
a
The Battery Industry is Looking to Manganese
Manganese Rich
Cathode chemistries
help to solve supply,
ESG and supply
security challenges
Mn
Reference: Volkswagen, Stellantis, Tesla, CPM Group, Morgan Stanley Research, Bloomberg New Energy Finance
Umicore Capital Markets Day 2022
Reference: Benchmark Mineral Intelligence, South 32 Limited
Manganese, the battery raw material supply chain solution?
PDAC 2023 Keynote Speaker
“…manganese (is) the single most critical mineral for batteries right now,” he
said.
“How many companies outside of China make manganese commercially for a
battery right now? Which is the hottest metal for batteries? How many? None, not
one,” Hoffman said, adding “and there’s where the opportunity is — unbelievable.”
“…manganese is the single most critical
mineral for batteries right now…”
Ken Hoffman, co-head of the EV battery materials
research group and senior expert at McKinsey & Company
https://www.benzinga.com/news/23/03/31265433/exclusive-ev-battery-guru-ken-hoffman-at-pdac-talks-critical-minerals-which-metals-will-rise
Low cost, efficient HPMSM process – significant improvements…
Problems with Current Technologies
•
•
•
•
•
The Element 25 Process makes significant changes & improvements…
Large volumes of waste residues
Toxic Reagents
Inefficient
Higher Cost
Outdated processing technology
Reagents/Cost
Carbon Emissions
Waste Residue
Element 25 Process
•
•
•
•
•
More efficient (fast kinetics, reduced energy)
Minimises reagent requirements
Reduced carbon intensity
Lower volumes of waste residues
Non-toxic residues may be able to be repurposed.
99.99%
MnSO4
- 14 -
Targeting Zero Carbon Manganese – ESG is integral to our thinking
•
LCA covers Scope 1,2 and 3 emissions from mining through
Existing producers often use high energy processes
to the proposed USA-based HPMSM processing plant.
like electrowinning and/or toxic reagents like fluoride.
E25 HPMSM to produce ~1.7kg of CO2 for every 1kg of
HPMSM:
o
~ 67% lower than competitors in China.
o up to 47% lower than competitors outside China.
o ~26% lower than next lowest project’s optimised case.
•
E25 process is not yet fully optimised for carbon reduction.
•
E25 to explore renewable energy and other potential
carbon reduction strategies to further reduce CO2.
Supply chain transparency
and traceability partner.
5.2
4.8
PUBLISHED PEER COMPARISONS
Kg CO2 eq. per kg (Scope 1+2+3)
•
Global Warming Potential
3.2
2.3
1.7
ELEMENT 25
EURO MANGANESE
(RENEWABLE)
GIYANI METALS
THE E25 PROCESS IS THE LOWEST CARBON
INTENSITY OPTION FOR HPMSM TODAY
Reference: Company ASX Release dated 16 February 2023
EURO MANGANESE (GRID)
CHINESE PLANTS (CURRENT)
Stage 3 Expansion of Conversion Capacity – Multiple Plants Planned
EU
JP
KR
Mn Concentrate Feedstock (33% Mn):
Up to 1M tonnes per annum manganese
concentrate production planned at the
Butcherbird Project in Western Australia.
MY
•
E25 manganese concentrate is a very
AU
stable, easily transported feedstock.
•
Allows location optionality for the
processing facility.
•
Feasibility Study Site: Louisiana USA
Multiple potential sites being explored.
- 16 -
Design One
Build Many
US
Inflation Reduction Act 2022 – What’s Changed?
Summary of Impacts on Battery Supply Chains
•Reform to EV tax credit ($7,500)
•requires vehicles to meet sourcing requirements for:
Critical Minerals ($3,750)
•
•
40% of battery raw materials, by value, to be
Battery Components ($3,750)
•
50% of battery components to be
sourced from north American or allied
manufactured or assembled in North America
countries (including Australia)
in 2023
Rises 10% per year to 80% by 2027
•
Rises 10% per year to 100% by 2029
Beginning in 2025, any vehicle with battery raw materials extracted, processed or recycled in a
"foreign entity of concern" is ineligible for the tax credit
What does this mean for E25?
•
E25 HPMSM can meet all the stated requirements of the new regulations.
•
E25 resource size can supply conversion requirements for USA customers to meet their
consumption needs for decades.
•
Potential built in north America to ensure customers’ HPMSM requirements meet regulatory
•
and strategic goals.
After calendar year 2024, the incentives will not be available for EVs that contain critical
minerals that were “extracted, processed, or recycled by a foreign entity of concern”.
Reference: DLA Piper website, Argonne National Laboratory, US Dept. of Energy
Mn
Potential Production Plant Site – Ascension Parish Louisiana
Pre-FID Activities Underway with local Engineering & Construction Contractors:
•
Conducting detailed assessments of the viability of the proposed site.
•
Focusing on local content where possible.
•
Negotiating partnerships with local reagent suppliers.
•
Commercial frameworks being advanced to prepare for FID:
•
•
Logistics – inbound and outbound
•
Reagents supply agreements
•
Site lease
•
Engineering (FEED progressing on time and budget)
Working with potential local design and construction contractors to develop
contracting strategies.
•
Looking to bring a range of community benefits to Ascension Parish which
underpins significant incentives package (subject to approval)
•
Advancing approval discussions with relevant regulators .
- 18 -
Note: artist’s impression – subject to final design
Proposed Production Plant – Ascension Parish Louisiana
Ore Storage
Processing Train 2
Processing Train 1
Product storage
and despatch
- 19 -
Feasibility Study - compelling economics
Offtake & Financing – Stellantis & General Motors
&
USD$30M equity
prepay
USD$85M senior
debt
• Binding agreements signed for offtake and funding.
• Binding agreements signed for offtake and funding.
• Key commercial terms include:
• Key commercial terms include:
•
Five (5) year HPMSM supply commitment (nominal 10Ktpa).
•
Seven (7) year HPMSM supply commitment (up to 32,500Ktpa).
•
Stellantis commits US$30M funding to E25’s HPMSM
•
GM commits $85M funding to E25’s HPMSM processing facility.
processing facility.
•
Funding committed as senior project debt.
First US$15 has been completed as equity at A$1 per share.
•
Seven year post construction repayment schedule.
•
• Arrangement includes commitments from E25 with
respect to ESG and IRA.
(Reference: Company ASX Release dated 9 January 2023)
• Arrangement includes commitments from E25 with
respect to ESG and IRA.
(Reference: Company ASX Release dated 26 June 2023)
Project Financing Strategy – Building the Capital Stack
Multiple funding pathways being actively negotiated:
US$30M
$15M Equity & $15M Prepay
Binding documents executed
• US$115M secured through GM and Stellantis deals.
• Discussions in progress with other potential offtake partners.
US$85M
Senior debt
Binding documents executed
• Offtake + Finance.
• Debt/Pre-Pay/Equity all in play.
US$30-50M
• Other funding avenues:
Senior debt/Prepay/Equity with offtake
Negotiations in progress.
• Nordic/Green Bonds/PE Debt.
US$100-150M
• Traditional project finance.
Senior debt plus equity
Negotiations in progress
• Government funding – DoE/DoD.
US$289M
• Green bonds.
Construction Capital Cost
Feasibility Study Estimate for Train 1 Construction
- 22 -
Our Strategic Vision…
Stage 1
Stage 2
1 Mt per annum concentrate
365Kt per annum
Stage 3
Battery Grade MnSO4 (HPMSM)
Pilot plant in production, preparing
expansion plan to full scale plant.
Engineering design and costing in progress
using DMS option
Strong OEM support –signed with General Motors &
Stellantis for offtake and financing
Stage 4
MnSO4 Expansion
Long term - multiple HPMSM
modules globally
1 year plan
2 year plan
5 year plan
Cashflow
Low capital cost, rapid start up to
establish E25 as a producer while
minimising dilution.
Expansion
The Prize
Improved resource utilisation,
reduction in unit operating costs,
increased operating cash.
Position E25 as a globally
dominant producer of high purity,
sustainable HPMSM.
- 23 -
Zero Carbon Manganese™
Best in class, zero carbon, ethically
produced, scalable HPMSM for
electric vehicle batteries.
Thank you
For more information, please contact Element 25 Limited:
+61 8 6375 2525
admin@e25.com.au
www.element25.com.au
ASX:E25
Reserves and Resources
Maiden Ore Reserve1
Category
Tonnes (Mt)
Mn (%)
Contained Mn (Mt)
Proved
14.4
11.5
1.65
Probable
36.2
9.8
3.56
Total
50.6
10.3
5.22
•
indicated resources to reserve.
•
Maiden Reserve only exploits
approximately 20% of global
mineral resource.
Global Mineral Resource2
Category
Tonnes (Mt)
Mn (%)
Si (%)
Fe (%)
Al (%)
Measured
16
11.6
20.6
11.7
5.7
Indicated
41
10.0
20.9
11.0
5.8
Inferred
206
9.8
20.8
11.4
5.9
Total
263
10.0
20.8
11.4
5.9
1Reference: Element 25 Limited ASX release dated 30 September 2022.
2
89% conversion of measured and
Reference: Element 25 Limited ASX releases dated 17 April 2019.
- 25 -
•
Excellent potential for future
expansion.
•
More drilling has potential to add to
global resource.
Competent Person’s Statement
The information in this presentation that relates to Exploration Results is based on information compiled by Mr Justin Brown who is a full-time employee of the
Company and is a member of the Australasian Institute of Mining and Metallurgy. Justin Brown has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Justin Brown consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
All references to Mineral Resources pertain to the ASX release dated 17 April 2019. The Company confirms that all material assumptions, underpinning the estimations
continue to apply and have not materially changed.
All references to Mineral Reserves pertain to the ASX release dated 30 September 2022. The Company confirms that all material assumptions, underpinning the
estimations continue to apply and have not materially changed.
For further information on Element 25 Limited and its Projects please visit its website at www.element25.com.au which contains copies of all continuous disclosure
documents to ASX, Competent Persons’ Statements and Corporate Governance Statement and Policies.
DISCLAIMER
The views expressed herein are not necessarily the views of the Australian Government, and the Australian Government does not accept responsibility for any
information or advice contained herein.
- 26 -
Share your feedback
Discover