Sharewise Webinar Investor Presentation
Released
Released
Announcement PDF
Building a Global Manganese Business
Supplying low-carbon sustainable manganese ore
and EV battery grade HPMSM to global markets
Sharewise Investor Webinar - December 2024
ASX : E25
OTCQX : ELMTF
Disclaimer
This presentation (Presentation) contains only a brief overview of Element 25 Limited and its associated entities (Element 25 or E25) and their respective
activities and operations. The contents of this presentation, including matters relating to the geology of Element 25's projects, may rely on various
assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any independent
verification.
This presentation contains multiple forward-looking statements. Known and unknown risks and uncertainties, and factors outside of Element 25’s control,
may cause the actual results, performance and achievements of Element 25 to differ materially from those expressed or implied in this presentation.
To the maximum extent permitted by law, Element 25 does not warrant the accuracy, currency or completeness of the information in this presentation, nor
the future performance of Element 25, and will not be responsible for any loss or damage arising from the use of the information.
The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and potential
investors and shareholders should seek independent advice before making any investment decision in regard to Element 25 or its activities.
The information contained in this Presentation is not investment, tax, legal, accounting, financial or other advice and does not, and will not, form any part of
any contract or commitment for any purpose including the acquisition of new shares in E25.
It does not account for your particular needs and circumstances, including your investment objectives, financial situation, tax or other position. Any
investment decision in relation to an equity raising or the Company should be made solely on the basis of your own independent enquiries.
Element 25 Introduction
Share Register:
Expanding the 100% owned Butcherbird
Manganese Mine in Western Australia to produce
high-quality manganese oxide concentrate.
Other
Stellantis
Developing a USA-based refinery to supply ethical
battery-grade High Purity Manganese Sulphate
Monohydrate (HPMSM) products.
Offtake and funding agreements in place with our
partners General Motors and Stellantis to supply
HPMSM for Electric Vehicle batteries.
Board &
Management
ATM Facility
Company Leadership
BOARD OF DIRECTORS
Experienced,
Multi-disciplinary Board &
Management
John Ribbons
Chairman
CPA
Justin Brown
Managing Director
Geologist
Fanie van Jaarsveld
Non-Executive Director
Analytical Chemist
Sam Lancuba
Non-Executive Director
Chemical Engineer
Sias Jordaan
VP Marketing & Logistics
Accountant
Ian Huitson
Study Manager
Mining Engineer
PROJECT DEVELOPMENT AND OPERATIONS TEAM
Michael Jordon
Chief Financial Officer
CPA
Neil Graham
VP Battery Materials
Chemical Engineer
Gideon van Wyk
GM Manganese Ore Bus.
Mechanical Engineer
Leon Lima
Technology Manager
Chemical Engineer
The Butcherbird Manganese Project
Butcherbird Manganese Project
• World-class manganese resource.
• Located in a Tier-1 jurisdiction with strong ESG regulation.
• Over 270 million tonnes in resources with potential to expand (2024 resource update1).
• Long mine-life with further upside by converting Inferred Resources
• Very clean metallurgically – no toxic contaminants.
• Produces a low carbon, high-quality manganese concentrate ideal for manganese
alloys and high-purity manganese sulphate monohydrate (HPMSM)2.
1Reference: Company ASX Release Dated 29 October 2024
2Reference: Company ASX Release Dated 21 February 2023
Butcherbird Manganese Mine - Resources & Reserves
1
Ore Reserve
Category
Tonnes (Mt)
Mn (%)
Contained Mn (Mt)
• High conversion of measured and
Proved
14.4
11.5
1.65
indicated resources to reserve.
Probable
36.2
9.8
3.56
Total
50.6
10.3
5.22
• Current Reserve:
•
mineral resource; and
•
Mineral Resource
Excludes additional Measured and
Indicated tonnes from latest model.
2
Resource Category
Only utilises approximately 20% of global
•
Reserve upgrade pending completion of
Tonnes (Mt)
Mn (%)
Measured
14
11.3
• Excellent potential for future expansion
Indicated
116
10.1
with known mineralization outside
Inferred
144
9.8
resource areas.
Total
274
10.0
1 Reference: Company ASX Release Dated 27 September 2024 (Annual Report)
2 Reference: Company ASX Release Dated 29 October 2024 (Mineral Resource Estimate Update)
pit optimization and mine design.
• Global resource not closed off.
Company strategic vision for growth
Butcherbird Expansion
Louisiana HPMSM
Expand Globally
1.1Mt/a Manganese Ore1
USA EV Critical Raw Materials2
HPMSM Expansion - EU & Asia
Build and commission a full large-scale
processing facility at the 100% owned
Butcherbird Manganese Mine in WA.
Construct the first US HPMSM processing facility
(Louisiana), producing 65,000 tonnes per annum
of battery-grade HPMSM with GM and Stellantis
Multiple HPMSM modules globally to deliver
sustainable HPMSM supply to global EV markets
targeting Europe and Asia.
1-Year Plan
3-Year Plan
10-Year Plan
Best in class, low carbon3, ethically produced,
scalable HPMSM for electric vehicle batteries:
Sustainably Supplying Global EV Markets
1 Reference: Company ASX Release Dated 23 January 2024
2 Reference: Company ASX Release Dated 12 April 2023
3 Reference: Company ASX Release Dated 22 February 2023
A Year of Milestones
Butcherbird Expansion Project
Louisiana HPMSM Project
Key Milestones
Lake Johnstone Lithium Update
Reference: ASX Release 28 Nov 2023
Regroup & Scania to Launch
Autonomous Fleet at Butcherbird
Reference: ASX Release 19 June 2024
US$57M Louisiana Incentives
US$166M DoE Grant Selection
Reference: ASX Release 19 Dec 2023
Reference: ASX Release 24 Sep 2024
Louisiana Air Permit
Reference: ASX Release 20 May 2024
Butcherbird Infill Drilling
Reference: ASX Release 19 June 2024
Butcherbird Expansion FS
Reference: ASX Release 23 Jan 2024
Butcherbird Resource Upgrade
Reference: ASX Release 29 Oct 2024
NAIF Strategic Assessment
Reference: ASX Release 8 Apr 2024
Louisiana Site Selected
Reference: ASX Release 8 May 2024
E25 and Nissan Chemical Sign MoU
to Evaluate HPMSM in Japan
Reference: ASX Release 3 Sep 2024
Large, long-life manganese ore mine in Western Australia
E52/2350
M52/1074
Global Resource
274Mt @ 10.0% Mn1
Granted Mining Lease and
permitting largely completed
during pilot plant stage minor amendments pending
approval for expansion
Measured
Indicated
Simple Logistics:
Existing road and port
infrastructure
1Reference: Company ASX Release dated 29 October 2024
Large JORC Resource:
Provides the basis for long
mine life high NPV
(Pre 2024 Update)
Indicated
(Post 2024 Update)1
Simple Geology: low-cost, low-impact operations
Classification
Tonnes (Mt)
Mn (%)
Contained Mn (Mt)
Resource1
274
10.0
27.4
Reserve2
49.0
10.2
5.0
RESOURCE GROWTH POTENTIAL
•
Large resource offers long term
operating potential.
•
Mineralisation outside existing
resource provides upside.
•
Ore suitable for ferroalloys,
battery grade HPMSM and EMM.
ENVIRONMENTALLY BENIGN OPERATION
1 Reference: Company ASX Release Dated 29 October 2024 (Mineral Resource Estimate Update)
2 Reference: Company ASX Release Dated 27 September 2024 (Annual Report)
•
Ore from surface.
•
Low strip-ratio.
•
No explosives required.
•
No dewatering required.
•
One reagent – water.
•
Very low levels of contaminants.
Butcherbird Manganese Mine Expansion
•
New processing facility will
optimise and scale the process.
•
Scale and improved efficiencies to
lower costs and increase profits.
•
CO2 emission intensity and ESG
outcomes will be improved by:
•
PROCESS WATER
PRODUCT LOADING
Integration of renewable energy
(targeting year 3 of operations).
•
Equipment selection criteria for
energy efficiency.
•
Investigating autonomous
4. DMS PLANT
3. LOG WASHER
mining fleet to improve safety
and efficiency1.
•
Transition to EV mining fleet
(targeting Year 2 of operations).
2. SCREEN
1. CRUSHER
1Reference: Company ASX Release Dated 7 October 2024
Butcherbird Manganese Mine Expansion
CRUSHER/SCREEN
Dense Media (DMS)
Processing Circuit
Dry Screen
Crushing Circuit
Logwasher
DMS PLANT
Administration
Engineering design modifications
targeting improved throughput,
uptime, recovery and grade.
Mineral Sizer
Improved clay
handling &
reliability
Screen
Design
Improved clay
handling
DMS Drum
Improved
recoveries and
grade
Measured Performance:
Commodity: Coal
Test date: 28 May 2010
Mine: BHP Douglas colliery
Feed rate: 416tph
ProductSTOCKS
Stockpiles
PRODUCT
Butcherbird Expansion – Scale Strengthens the Business
Economies of scale from the expanded operation will move the
Butcherbird production costs lower on the global cost curve and
strengthen the business through all price cycles.
Mn ore cost curve (CIF China, US$/t)
July 2024
Estimated E25 Butcherbird Expansion cif Cost
Reference: Fastmarkets, Project Blue 2024
Reference: ASX Release dated 23 January 2024
E25 HPMSM Strategy
Vertically-integrated global HPMSM supply
WA Manganese Ore Supply:
Low Cost
E25 Ore
Australian manganese ore concentrates
Mineral Sizer
Log Washer
DMS Circuit
as feedstock for HPMSM production to
supply US EV markets.
Surplus ore will supply
Vertically integrated critical battery
raw material supply chain.
existing ferroalloy customers.
Mn Concentrate
Truck
Ship to Smelters
Louisiana HPMSM Refinery:
Purification
Louisiana manganese refinery will
Leach
utilise the Australian ore as feedstock to
produce high purity low carbon IRA
compliant battery grade manganese
Renewable Energy
Hydro/Wind/Solar
Battery Grade
Manganese Sulphate
Truck
EV Batteries
sulfate.
Global Refining Capacity in the Longer Term
EU
EU & UK policy shifts are
competing with the IRA
for investment in battery
and related plants
MoU signed with Nissan
Chemical Corporation to
jointly develop HPMSM
capacity in Japan
JP
KR
•
Design one, build many approach to development.
•
E25 manganese concentrate is a very stable, easily
transported feedstock.
1
•
Allows location optionality for the processing facility.
•
Multiple potential sites being explored.
Reference: Company ASX Release Dated 23 January 2024
First HPMSM Facility:
Louisiana USA - IRA is driving capital
flows into US electrification
infrastructure. E25 is partnering with
Stellantis & GM to onshore refining
capacity and capability
AU
Butcherbird Manganese Mine:
1.1 million tonnes per annum of
manganese concentrate production is
planned at the Butcherbird Project in
Western Australia1.
US
Improved, Cost-Competitive Cleaner Process Technology
The Element 25 Process makes significant changes & improvements:
Reagents/Cost
Carbon Emissions
Element 25 Process
•
•
•
•
•
More efficient (fast kinetics, reduced energy)
Minimises reagent requirements
Reduced carbon intensity
Lower volumes of waste residues
Non-toxic residues may be able to be repurposed.
Reference: Company ASX Release Dated 16 February 2023
Waste Residue
Current Outdated Technologies mean:
• Large volumes of waste residues.
• Toxic Reagents like fluorine.
• Inefficient.
• Higher Cost.
•
Outdated processing technology.
ESG - LCA demonstrates a low-carbon, ethical process
•
LCA covers Scope 1, 2 and 3 emissions from mining through
E25 Process Reduces Global Warming Potential
Relative to Incumbent Producers
to the proposed USA-based HPMSM processing plant.
E25 HPMSM to produce ~1.7kg of CO2 for every 1kg of
HPMSM:
o
~ 67% lower than competitors in China.
o up to 47% lower than competitors outside China.
o ~26% lower than next lowest project’s optimised case.
•
E25 process is not yet fully optimised for carbon reduction.
•
E25 to explore renewable energy and other potential
carbon reduction strategies to further reduce CO2.
5.2
3.2
2.3
1.7
ELEMENT 25
EURO MANGANESE
(RENEWABLE)
Element 25 HPMSM Process
Industry leading carbon intensity
Reference: Company ASX Release Dated 16 February 2023
4.8
PUBLISHED PEER COMPARISONS
Kg CO2 eq. per kg (Scope 1+2+3)
•
Reference: Company ASX Release dated 16 February 2023
GIYANI METALS
EURO MANGANESE (GRID)
CHINESE PLANTS (CURRENT)
ESG Benchmarking
•
Digbee ESG benchmarking
process completed for 2024.
•
Opportunities identified for
action over following period.
•
Executive incentive KPIs now
linked to ESG outcomes.
•
Internal reporting processes
being developed to improve ESG
credentials and preparedness for
compliance reporting.
The Importance of Manganese
Electric Vehicle (EV) uptake keeps accelerating…
Mn
Reference: https://thedriven.io/2024/11/13/global-ev-sales-heading-for-record-16-7-million-sales-in-2024-despite-reports-of-slowdown/
- 22 -
Transition to Higher Manganese Cathodes
Manganese Rich Cathode chemistries help to solve supply, ESG and supply security challenges
High-manganese represents
the optimum cost-benefit ratio.
Volkswagen, March 2021
Li-Mn-rich technology shown as
"cost" solution in electrification
roadmap. BMW, November 2021
Tesla is working on new
manganese battery cell.
Tesla, March 2022
Reference: Umicore Capital Markets Day 2022
Reference: Benchmark Mineral Intelligence, South 32 Limited
Transition to Higher Manganese Cathodes
LMFP, LMNO and NMX cathode chemistries offer improved safety, higher energy
density, reduced cost per KWh and greater supply chain flexibility.
High Manganese Cathode Material offers a number of advantages:
Reduced nickel and very low to no cobalt content.
Reference: Umicore 2023
Louisiana Battery Grade HPMSM
DoE Grant - Part of US Government Drive for Domestic Manufacturing
DoE Grant Selection
•
E25’s planned HPMSM facility in
Louisiana selected for award
negotiations for US$166 million
grant from the U.S. DoE.
•
Louisiana HPMSM Project selected
under DoE’s MESC Battery Materials
Processing Grant Program.
•
E25 and DoE expect to finalise a
binding funding agreement for the
grant as soon as practicable.
•
The DoE's funding commitment is in
addition to U$115M
financing commitments from GM
and Stellantis.
Reference: https://www.energy.gov/sites/default/files/2024-11/Supply_Chain_Readiness_Level_%28SCRL%29_Analysis_%28Nov-2024%29_2.pdf
DoE MESC Grant - Supporting Local Raw Material Supply
Local Supply Chain
• Process and supply chain developed
to maximise U.S. industry
involvement.
Mn Ore
US$166M
Reductant
Leach
• Working with partners GM and
Stellantis to supply low carbon
HPMSM for EV batteries.
Acid
• All reagents sourced locally from
established suppliers.
Neutralisation
• Site located close located adjacent
to acid recycling facility.
Grant
Purification
Crystallisation
• Solid residues as co-products will be
placed into local industries targeting
zero waste.
• Low carbon, circular economy
approach.
Comminution
Co-Product Processing
Logistics
MAIN
PRODUCT
HPMSM
Fertiliser
Gypsum
SiRon
DoE Grant Award Underpins Project Capital Stack
•
DoE US$166M grant selection provides cornerstone funding to
support project success1.
•
Louisiana HPMSM Project selected under DoE’s MESC Battery
Materials Processing Grant Program.
•
E25 and DoE grant team working to finalise binding
documentation ASAP.
•
Grant support is in addition to U$115M financing
commitments from GM and Stellantis.
•
Discussions in train with prospective financiers to close
out remaining capital funding requirement.
Final funding piece ~15%
of capital requirement.
Process underway.
Grant award secures 50% of capital
requirement up to US$166M
1 Reference : Company ASX Release Dated 24 September 2024
Upcoming Planned Investment Catalysts
Planned newsflow:
•
Updated Reserve Statement to confirm extension to the mine life
based on increased Measured and Indicated Resources.
•
Updated Feasibility Study to support the revised Reserve Statement
and refined capital and operating costs and financial metrics.
•
Signing of the DoE grant contracts to secure $166M in DoE grant
funding for the Louisiana Project.
•
Finalise project financing from third lender to complement firm
funding from DoE grant, GM Loan, and Stellantis Pre-Payment.
•
Finalise key commercial contracts for both the Butcherbird
Expansion and Louisiana HPMSM Projects.
•
Commence of construction!
References:
•
ASX Company Release dated 24 September 2024
•
ASX Company Release dated 18 September 2023
*Subject to
project
and2024
permitting
• successful
ASX Company
Release financing
dated 29 October
Questions?
Contact Details
Justin Brown
Managing Director
Email: admin@e25.com.au
Phone: +61 (8) 6375 2525
Media Inquiries:
Nathan Ryan
Email: nathan.ryan@nwrcommunications.com.au
Phone: +61 (0) 420 582 887
ASX : E25
OTCQX : ELMTF
Competent Person’s Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Mr Justin Brown who is a member of the Australasian Institute of Mining and Metallurgy. At the time that the
Exploration Results and Exploration Targets were compiled, Mr Brown was an employee of Element 25 Limited. Mr Brown is a geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Brown consents to
the inclusion of this information in the form and context in which it appears in this report.
The information in this report that relates to the Yanneri Ridge and Coodamudgi Mineral Resources is based on, and fairly represents, information and supporting documentation prepared by Mr. Dean O’Keefe, who acts as Consultant Geologist
for Element 25 and is a full-time employee of MEC Mining. Mr. O’Keefe is a Member of the Australasian Institute of Mining and Metallurgy and has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr. O’Keefe
consents to the inclusion in this report of the Mineral Resources estimates and supporting information in the form and context in which it appears.
The information in this report that relates to the Mundawindi and Ritchies Find Mineral Resources is based on and fairly represents information and supporting documentation prepared by Mr Greg Jones, who acts as Consultant Geologist for
Element 25 and is a full-time employee of IHC Robbins. Mr. Jones is a Member of the Australasian Institute of Mining and Metallurgy and has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr. Jones
consents to the inclusion in this report of the Mineral Resources estimates and supporting information in the form and context in which it appears.
The information in this report that relates to the Bindi Bindi, Budgie Hill, Cadgies Flat and Ilgarrarie Ridge Mineral Resources is based on, and fairly represents information and supporting documentation prepared by Mr Mark Glassock who is a
member of the Australasian Institute of Mining and Metallurgy. At the time that the Mineral Resources were compiled, Mr Glassock was a consultant to Element 25 Limited. Mr Glassock is a geologist and has sufficient experience which is relevant to
the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Glassock consents to the inclusion of this information in the form and context in which it appears in this report. Element 25 confirms that it is not aware of any new information or data that materially affects the
information included in the relevant market announcements, and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed.
Please note with regard to exploration targets, the potential quantity and grade is conceptual in nature, that there has been insufficient exploration to define a Mineral Resource and that it is uncertain if further exploration will result in the
determination of a Mineral Resource.
For further information on Element 25 Limited and its Projects please visit its website at www.element25.com.au which contains copies of all continuous disclosure documents to ASX, Competent Persons’ Statements and Corporate Governance
Statement and Policies.
This release has been approved by the Element 25 Limited Board of Directors.
References:
•
ASX Company Release dated 29 October 2024
Share your feedback
Discover